Planning application

S21/1120

Highway Verge Junction Of Cherry Holt Road And South Road Bourne PE10 9HX

Granted South Kesteven Prior Notification Part 16 Telecom

Proposal

The installation of a new 18.00m monopole supporting 6 no. antennas with a wrap-around equipment cabinet at the base of the column, installation of 3 no.new equipment cabinets and ancillary development thereto.

As published by the council, reference S21/1120

Timeline

Dates from the published record

  1. 2 Jun 2021

    Received by South Kesteven

  2. 19 Jul 2021

    Decision issued: Prior Notice Approved Conditionally

  3. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • S26/0654 Decided

    Land Off Falcon Way Adjacent Larkfleet House.

    Submission of details reserved by conditions 4 (Habitat Management and Monitoring Plan), 6 (outbuilding details) and 7 (sustainable building measures statement) of planning permission S25/1420 - Erection of five dwellinghouses and associated works.

    14 Apr 2026 147m away Conditions
  • S21/1174 Decided

    Land Of Falcon Way Bourne PE10 0GT

    Submission of details reserved by conditions 2 (hard landscaping) and 4 (soft landscaping) of S20/0603 (Reserved Matters application relating to siting, design, external appearance, means of access or landscaping in connection with planning application S16/2285 for the erection of 19 dwellings)

    10 Jun 2021 197m away Conditions
  • S26/1131 Awaiting decision

    Field Boxmore Labels Bourne Roman Bank Bourne Lincolnshire PE10 9LQ

    Proposed replacement and recovering of current steel sheeting (Main Factory) and felt roofing (Main Office Building) .

    30 Jun 2026 227m away Full applications
  • S26/0340 Withdrawn

    Field Boxmore Labels Bourne Roman Bank Bourne Lincolnshire PE10 9LQ

    Recovering and replacement of existing roofing insulation.

    24 Feb 2026 231m away Lawful development
  • S24/1760 Decided

    Land Adjacent To: 43 Willoughby Road Bourne Lincolnshire PE10 9JR

    Fibre network build that is planned to start soon.

    3 Oct 2024 391m away
  • S26/0721 Awaiting decision

    Cadet Hut Austerby Bourne Lincolnshire PE10 9JJ

    Submission of details reserved by deemed condition (Biodiversity Gain Plan) of planning permission S24/1553 (Removal of existing dilapidated modular building and construction of new single storey modular building with associated parking and new dropped kerb to permit vehicle access).

    23 Apr 2026 474m away Conditions

In South Kesteven

  • S26/1150 Awaiting decision

    Land At Little Bytham Sewage Treatment Works Little Bytham Road South Kesteven Little Bytham NG33 4SU

    Installation of a 12m streetworks telecommunications pole supporting smart metering equipment, including omni, GPS and 3G antennas, together with an equipment enclosure at the tower base and four concrete bollards associated with the Anglian Water smart metering network.

    1 Jul 2026 Telecoms