Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunications Mast Land At Grange Farm Spalding Road Bourne Lincolnshire PE10 0BA

Granted South Kesteven S23/0362 Prior Notification Part 16 Telecom

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior notification for the installation and works to telecom equipment, including the extension of existing tower by 2m, replacement antennas, installation of 2 no. transmission dishes, and ancillary development

As published by the council, reference S23/0362

Application record

Reference
S23/0362
Type
Prior Notification Part 16 Telecom
Status
Permitted
Decision
Prior Notice Approved Conditionally
Received
23 Feb 2023
Validated
23 Feb 2023
Decided
19 Apr 2023
Ward
Bourne East Ward
Parish
Bourne Town Council
Decision by
Delegated Decision
Postcode
PE10 0BA

Timeline

Dates from the published record

  1. 23 Feb 2023

    Received by South Kesteven

  2. 19 Apr 2023

    Decision issued: Prior Notice Approved Conditionally

  3. 18 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a telecoms contractor registered in Leeds

324 applications on PlanIndex · across 97 councils · 84% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

In South Kesteven

  • S26/1150 Granted

    Land At Little Bytham Sewage Treatment Works Little Bytham Road South Kesteven Little Bytham NG33 4SU

    Installation of a 12m streetworks telecommunications pole supporting smart metering equipment, including omni, GPS and 3G antennas, together with an equipment enclosure at the tower base and four concrete bollards associated with the Anglian Water smart metering network.

    1 Jul 2026 Telecoms
  • S23/0241 Granted

    A52/Wharf Road Grantham NG31 6BQ

    The installation of 15m high slim-line monopole, supporting 6 no. antennas, 1 no. wraparound equipment cabinet at the base of the monopole, 2 no. equipment cabinets, 1 no. electric meter cabinet and ancillary development

    6 Feb 2023 Telecoms
  • S21/1392 Granted

    Grantham and District Hospital NHS Trust Manthorpe Road Grantham Lincolnshire NG31 8DG

    Replacement of 2No. antennas with 2No. antennas on existing support poles (22.05m AGL). Replacement of 1No. antenna and relocation of 1No. antennas onto new support pole (21.25m AGL). Installation of associated remote radio units onto freestanding frames. Installation of 2No. cabinets within existing equipment cabin.

    9 Jul 2021 Telecoms
  • S21/1120 Granted

    Highway Verge Junction Of Cherry Holt Road And South Road Bourne PE10 9HX

    The installation of a new 18.00m monopole supporting 6 no. antennas with a wrap-around equipment cabinet at the base of the column, installation of 3 no.new equipment cabinets and ancillary development thereto.

    2 Jun 2021 Telecoms