Proposal
Planning Performance Agreement and associated Technical Working Group pre-application discussions for the Grafham to Cambridge Pipeline Scheme. TCPA application expected in 2026. New information is available to review for writte advice and attendance at PPA Pre-app meetings.
As published by the council, reference PPA/25/0056
Application record
- Reference
- PPA/25/0056
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 22 Oct 2025
- Validated
- 14 Nov 2025
- Ward
- Girton
- Parish
- Girton CP
Timeline
Dates from the published record
-
22 Oct 2025
Received by South Cambridgeshire
-
14 Nov 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 25/01655/SCOP (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
- SUSTAINABILITY
- INVALID CHASE
- INVALID LETTER
- ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORT PAGE 1-50
- ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORT PAGE 51-100
- ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORT PAGE 101-150
- ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORT PAGE 151-202
- FIGURE 1.2 SCHEME LOCATION AND EXTENT PLAN
- COVER EMAIL
- GRAFHAM TO REDE SCOPING OPINION REQUEST SCDC
- IMAGE003
- FIGURE 1.1 OVERALL ROUTE PLAN
- FIGURE 1.3 SCHEME LOCATION DETAIL PAGES 1 TO 24
- FIGURE 4.1 AIR QUALITY CONSTRAINTS
- FIGURE 4.2 CONSTRUCTION DUST ASSESSMENT PAGES 1 TO 13
- FIGURE 5.1 STATUTORY DESIGNATED SITES
- FIGURE 5.2 NON-STATUTORY DESIGNATED SITES
- FIGURE 5.3 ANCIENT WOODLAND AND VETERAN TREES
- FIGURE 5.4 PRIORITY HABITATS
- FIGURE 5.5 WATERCOURSES AND STANDING WATERBODIES
- FIGURE 7.1 HISTORIC ENVIRONMENT STUDY AREA
- FIGURE 7.2 BEDROCK GEOLOGY
- FIGURE 7.3 SUPERFICIAL GEOLOGY
- FIGURE 7.4 TOPOGRAPHY
- FIGURE 7.5 DESIGNATED HERITAGE ASSETS
- FIGURE 7.6 NON DESIGNATED HERITAGE ASSETS
- FIGURE 7.7 PREVIOUS ARCHAEOLOGICAL INVESTIGATIONS
- FIGURE 7.8 HISTORIC ENGLAND AERIAL INVESTIGATION MAPPING
- FIGURE 7.9 PARISH BOUNDARIES
- FIGURE 8.1 LANDSCAPE AND HERITAGE DESIGNATIONS
- FIGURE 8.2 LANDSCAPE CHARACTER TYPES
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided full applications in a median of 143 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Rectory Farm Scotland Road Dry Drayton Cambridgeshire CB23 8AS
Change of Use of Buildings on Agricultural Units and former Agricultural Buildings to 4 No. Dwellinghouses (Class C3)
Withdrawn Prior approval 29 docsSeveral homes -
Rectory Farm New Road Dry Drayton CB23 8AS
Erection of two agricultural general purpose storage buildings.
Refused Prior approval 10 docs -
Rectory Farm Scotland Road Dry Drayton Cambridgeshire CB23 8AS
79% historically approved · decision due ~3 Nov
Change of Use and conversion of existing red brick barns to 4 No. Dwellinghouses (Class C3).
Awaiting decision Prior approval 32 docsSeveral homes
Other full applications
In South Cambridgeshire
-
26/01269/FUL Granted
Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ
Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.
-
25/01014/FUL Granted
Land Off Low Fen Drove Way Horningsea Cambridgeshire
Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.
-
26/02714/FUL Granted
Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY
Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.
-
25/04556/FUL Refused
Land At Station Road Willingham Cambridgeshire
Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.
-
26/03702/FUL Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.