Planning application
Land Off Low Fen Drove Way Horningsea Cambridgeshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.
As published by the council, reference 25/01014/FUL
Application record
- Reference
- 25/01014/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Granted Permission
- Received
- 14 Mar 2025
- Validated
- 14 Mar 2025
- Decided
- 5 Oct 2026
- Ward
- Fen Ditton & Fulbourn
- Parish
- Horningsea CP
- Decision by
- Committee Decision (Area/Main)
Timeline
Dates from the published record
-
14 Mar 2025
Received by South Cambridgeshire
-
23 Jul 2026
Added to PlanIndex
-
5 Oct 2026
Decision issued: Granted Permission
Who's behind it
Company information only, from the register and Companies House
Pegasus Planning Group Ltd Agent, a planning consultancy registered in Cirencester
Active · incorporated 2010 · Cirencester
731 applications on PlanIndex · across 144 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
366 documents on file for this application
- DECISION NOTICE
- UPDATE REPORT FOLLOWING COMMITTEE AND NEW NPPF
- COMMITTEE REPORT
- EXTENSION OF TIME 7 OCTOBER 2026
- EXTENSION OF TIME AGREED 30.09.2026
- SECRETARY OF STATE - NON-INTERVENTION LETTER
- AGENT/APPLICANT PUBLIC SPEAKING LETTER
- EOT REQUEST
- EOT AGREED
- TRANSPORT ASSESSMENT TEAM
- INTERNAL DRAINAGE BOARD COMMENTS
- ARCHAEOLOGY COMMENTS
- ARCHAEOLOGY
- PARISH
- LLFA
- RESPONSE LETTER - LLFA COMMENTS
- ECOLOGY
- TREES
- PARISH
- ENVIRONMENTAL HEALTH
- ENVIRONMENTAL HEALTH
- ENVIRONMENTAL HEALTH
- CONSERVATION
- DEFENCE INFRASTRUCTURE ORGANISATION
- LLFA
- PARISH
- DRAINAGE
- LOCAL HIGHWAY AUTHORITY
- ENVIRONMENT AGENCY
- HISTORIC ENGLAND
- LANDSCAPE
- URBAN DESIGN
- CAMBRIDGE CITY AIRPORT
- DEFINITIVE MAP TEAM
- NATIONAL HIGHWAYS
- SITE NOTICE
- SITE NOTICE
- 85TH PERCENTILE CALCULATIONS
- PROPOSED SITE ACCESS ARRANGEMENT
- FILE COPY OF AMENDMENT LETTER
- WASTE - SHARED SERVICE
- SUSTAINABILITY
- SITE NOTICE
- SOS CONSULTATION 13 MAY 2026
- SOS CONSULTATION 13 MAY 2026
- SUPPLEMENTARY SUPPORT STATEMENT
- COVER LETTER 27.02.2026
- COVER LETTER 08.05.2026
- DRAINAGE STRATEGY
- CATCHMENT PLAN
- BESS DRAINAGE STRATEGY
- CAUSEWAY FLOW CALCULATIONS
- GREENFIELD RUNOFF RATES
- SWALE SIZING CALCULATIONS
- MAINTENANCE PLAN
- RESPONSE FROM SWAFFHAM IDB
- ANGLIAN WATER - WASTEWATER ASSET PLAN
- CAMBRIDGE WATER ASSET PLAN
- BRE TEST RESULTS
- SEWER FLOODING HISTORY
- RESERVOIR LOCATIONS
- FLOOD RISK ASSESSMENT DATA
- EIA COMPLIANCE STATEMENT
- INNOVA GRID LETTER DECEMBER 2025
- LANDSCAPE MASTERPLAN
- LANDSCAPE SECTIONS
- ARCHAEOLOGY TECHNICAL NOTE
- FRA & SURFACE WATER DRAINAGE STRATEGY
- LAYOUT PLAN
- TOPOGRAPHICAL SURVEY
- TOPOGRAPHICAL SURVEY
- TOPOGRAPHICAL SURVEY
- TOPOGRAPHICAL SURVEY
- LAYOUT PLAN
- ARCHAEOLOGICAL EVALUATION REPORT PART 1
- ARCHAEOLOGICAL EVALUATION REPORT PART 2
- DEFENCE INFRASTRUCTURE ORGANISATION
- OLD WEST INTERNAL DRAINAGE BOARD
- S106 OFFICER
- CONTAMINATED LAND
- PARISH
- ECOLOGY
- TREES
- DESIGNING OUT CRIME OFFICER
- CONSERVATION
- HISTORIC ENGLAND
- LLFA
- URBAN DESIGN
- CONTAMINATED LAND
- LOCAL HIGHWAY AUTHORITY
- DRAINAGE
- ENVIRONMENT AGENCY
- NATIONAL HIGHWAYS COMMENTS
- NATIONAL HIGHWAYS
- LANDSCAPE
- SUSTAINABILITY
- RAMBLERS ASSOCIATION
- RSPB
- DEFINITIVE MAP TEAM
- EOT AGREED
- CAMBS FIRE AND RESCUE
- SUPPORTING STATEMENT (COVERING GREY BELT, HIGHWAYS, DRAINAGE, HERITAGE, ARCHAEOLOGY AND FIRE SAFETY)
- 1 IN 30 HYDRAULIC CALCS
- 1 IN 2 YR HYDRAULIC CALCS
- 1 IN 100 YR HYDRAULIC CALCS
- 1 IN 100 + CC HYDRAULIC CALCS
- COVER EMAIL
- EOT REQUEST
- WASTE - SHARED SERVICE
- AIRPORT SAFEGUARDING
- ECOLOGY
- HISTORIC ENGLAND
- ENVIRONMENT AGENCY
- TRANSPORT ASSESSMENT TEAM
- LANDSCAPE
- ENVIRONMENTAL HEALTH
- BNE - CONSERVATION
- AIRPORT SAFEGUARDING
- MINISTRY OF DEFENCE COMMENTS
- LOCAL LEAD FLOOD AUTHORITY COMMENTS
- ENVIRONMENTAL HEALTH
- SUSTAINABILITY
- URBAN DESIGN
- DEFINITIVE MAP TEAM
- DESIGNING OUT CRIME OFFICER
- LOCAL HIGHWAY AUTHORITY
- DRAINAGE
- NATIONAL HIGHWAYS
- WASTE - SHARED SERVICE
- TREES
- FEN DITTON SITE SELECTION REPORT PART 1 OF 2
- FEN DITTON SITE SELECTION REPORT PART 2 OF 2
- SUPPLEMENTARY SUBMISSION STATEMENT
- LAYOUT PLAN
- APP A1 - TOPO
- APP B1 - SITE LAYOUT PLAN
- APP C1 - DRAINAGE STRATEGY
- APP C2 - CATCHMENT PLAN
- APP D1 - RESPONSE FROM SWAFFHAM IDB
- APP D2 - INFODRAINAGE CALCULATIONS
- APP D3 - GREENFIELD RUNOFF RATE
- APP E1 - ANGLIAN WATER - WASTEWATER ASSET PLAN
- APP E1.2 - CAMBRIDGE WATER ASSET PLAN
- APP E2 - BRE TEST RESULTS
- APP E3 - SEWER FLOODING HISTORY
- APP E4- RESERVOIR LOCATIONS
- APP E5 - P4 DATA (FRA)
- CROSS SECTION INTERNAL ACCESS TRACK TYPE A
- BNG REPORT
- GREY BELT APPRAISAL
- STATEMENT OF EIA COMPLIANCE
- BNG CALCULATION TOOL
- LANDSCAPE MASTERPLAN
- SZTV LOCATION PLAN
- CUMULATIVE SZTV
- LANDSCAPE SECTIONS
- HERITAGE NOTE
- FRA SURFACE WATER DRAINAGE STRATEGY
- PART 1 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 2 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 3 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 4 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 5 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 6 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 7 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 8 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- PART 9 OF 9 FRA SURFACE WATER DRAINAGE STRATEGY
- AIA V3 PAGE 1-29
- AIA V3 PAGE 30-59
- AIA V3 PAGE 60-79
- AIA V3 PAGE 80-94
- FILE COPY OF AMENDMENT LETTER
- ANGLIAN WATER COMMENTS
- PARISH
- PARISH
- ENVIRONMENT AGENCY
- CAMBRIDGE PAST, PRESENT & FUTURE - REPORT
- COUNTY PLANNING, MINERALS & WASTE
- PN BEHALF OF ANGLIAN WATER
- HISTORIC ENGLAND COMMENTS
- DRAINAGE
- NATIONAL HIGHWAYS COMMENTS
- URBAN DESIGN
- COUNCILLOR HOFMAN COMMENTS
- ECOLOGY
- QUY FEN TRUST COMMENTS
- QUY FEN TRUST COMMENTS
- HORNINGSEA PARISH COUNCIL
- CONTAMINATED LAND
- TREES
- URBAN DESIGN
- CLIMATE, WASTE & ENVIRONMENT
- ARCHAEOLOGICAL OFFICER
- MINISTRY OF DEFENCE COMMENTS
- LLFA
- WILDLIFE TRUST
- LOCAL HIGHWAY AUTHORITY
- LANDSCAPE
- NATURAL ENGLAND
- CAMBRIDGE CITY AIRPORT
- BNE - CONSERVATION
- CAMBRIDGESHIRE FIRE AND RESCUE
- CAMBRIDGESHIRE CONSTABULARY
- RAMBLERS ASSOCIATION
- SITE NOTICE
- WASTE - SHARED SERVICE
- SUSTAINABILITY
- DEFINITIVE MAP TEAM
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- SCI APPENDIX C1
- SCI APPENDIX C2
- SCI APPENDIX C3
- SCI APPENDIX C4
- SCI APPENDIX C5
- SCI APPENDIX C6
- SCI APPENDIX C8
- SCI APPENDIX C7
- SCI APPENDIX C9
- SCI APPENDIX C10
- SCI APPENDIX C11
- SCI APPENDIX C12
- SCI APPENDIX C13
- SCI APPENDIX C14
- SCI APPENDIX C15
- APPENDIX 5.13 PHOTOMONTAGE
- APPENDIX 5.13 PHOTOMONTAGE
- APPENDIX 5.5 TOPOGRAPHICAL SURVEY
- APPENDIX 5.5 TOPOGRAPHICAL SURVEY
- APPENDIX 5.5 TOPOGRAPHICAL SURVEY
- APPENDIX 5.5 TOPOGRAPHICAL SURVEY
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- ENVIRONMENTAL STATEMENT BIODIVERSITY
- ENVIRONMENTAL STATEMENT PROPOSED DEVELOPMENT AND ALTERNATIVES
- ENVIRONMENTAL STATEMENT SUMMARY
- AGRICULTURAL LAND CLASSIFICATION
- LAYOUT PLAN
- SITE LOCATION PLAN
- ENVIRONMENTAL STATEMENT ARCHAEOLOGY
- ENVIRONMENTAL STATEMENT EIA
- SCREENING MATRIX RESPONSE
- SCOPING RESPONSE MARCH 2025
- LVIA METHODOLOGY
- LCA EXTRACTS
- LANDSCAPE EFFECTS SUMMARY TABLE
- VISUAL EFFECTS SUMMARY TABLE
- LANDSCAPE MASTERPLAN
- NCA EXTRACTS
- ENVIRONMENTAL STATEMENT APP SITE
- NOISE ASSESSMENT
- EIA SCREENING REQUEST
- ENVIRONMENTAL STATEMENT INTRODUCTION
- RLT EXTRACTS
- DNO SUBSTATION
- CROSS SECTION ACCESS TRACK
- CROSS SECTION PARKING SPACE
- ELEVATION AUXILIARY TRANSFORMER
- CCTV POLE ELEVATION
- COMMS MAST ELEVATION
- CUSTOMER SUBSTATION ELEVATION
- ENERGY STORAGE SYSTEM ELEVATION
- PALISADE FENCE ELEVATION
- STOCK PROOF FENCING ELEVATION
- OFFICE CONTAINER ELEVATION
- POWER CONVERSION UNIT ELEVATIONS
- PV ARRAY BALLAST ELEVATIONS
- PV ARRAY PILLED ELEVATIONS
- SECURITY GATE ELEVATIONS
- SPARES CONTAINER ELEVATIONS
- WATER STORAGE ELEVATIONS
- CLCA EXTRACTS
- STATEMENT OF COMMUNITY INVOLVEMENT
- BNG REPORT
- SITE CONTEXT PLAN
- SITE LOCATION PLAN
- CUMULATIVE SITE PLAN
- ENVIRONMENTAL DESIGNATIONS PLAN
- SITE LAYOUT PLAN
- INDICATIVE LANDSCAPE MASTERPLAN
- SITE LOCATION PLAN
- CUMULATIVE SZTV
- AERIAL SLP
- ENVIRONMENTAL DESIGNATIONS PLAN
- TOPOGRAPHY PLAN
- LANDSCAPE CHARATER PLAN
- SITE LAYOUT PLAN
- SZTV AND VIEWPOINT LOCATIONS
- VIEWPOINT LOCATION PLAN
- CUMULATIVE SITE PLAN
- FIGURE 6.1 SITE LOCATION PLAN
- FIGURE 6.2 STATUTORY DESIGNATED SITES
- FIGURE 6.3 NON STATUTORY DESIGNATED SITES
- FIGURE 6.4 HABITAT PLAN
- FIGURE 6.5 BREEDING BIRD SURVEY RESULTS
- FIGURE 6.6A WINTERING BIRD SURVEY RESULTS NOV 23
- FIGURE 6.6B WINTERING BIRD SURVEY RESULTS DEC 23
- FIGURE 6.6C WINTERING BIRD SURVEY RESULTS JAN 24
- FIGURE 6.6D WINTERING BIRD SURVEY RESULTS FEB 24
- FIGURE 6.6E WINTERING BIRD SURVEY RESULTS MAR 24
- FIGURE 6.6F WINTERING BIRD SURVEY RESULTS OCT 24
- FIGURE 6.6G WINTERING BIRD SURVEY RESULTS NOV 24
- FIGURE 6.6H WINTERING BIRD SURVEY RESULTS DEC 24
- FIGURE 6.6I WINTERING BIRD SURVEY RESULTS JAN 25
- FIGURE 6.6J WINTERING BIRD SURVEY RESULTS FEB 25
- FIGURE 6.6K WINTERING BIRD SURVEY RESULTS MAR 25
- FIGURE 6.7 POND LOCATION PLAN
- GLINT AND GLARE ASSESSMENT
- SUB COMPOUND TYPE B ELEVATIONS
- LANDSCAPE MASTERPLAN
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- DESIGN AND ACCESS STATEMENT
- COVERING LETTER V2
- ENVIRONMENTAL STATEMENT
- ECONOMIC BENEFITS STATEMENT
- HABITATS AND EXTENDED HABITAT SURVEY
- ORNITHOLOGICAL SURVEY REPORT
- GCN PRESENCE OR ABSENCE EDNA
- FRA SURFACE WATER DRAINAGE STRATEGY
- ENVIRONMENTAL STATEMENT LANDSCAPE AND VISUAL PAGE 1-50
- ENVIRONMENTAL STATEMENT LANDSCAPE AND VISUAL PAGE 51-108
- PLANNING STATEMENT FINAL PAGE 1-50
- PLANNING STATEMENT FINAL PAGE 51-107
- COVERING LETTER
- BIODIVERSITY NET GAIN CALCULATIONS
- CAMBRIDGE INDEPENDENT FRONT COVER
- CAMBRIDGE INDEPENDENT CLASSIFIED PAGES
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.11 TYPE 1 PHOTOVIEWS FEB/MARCH
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 5.12 PHOTO VIEWS APRIL 2024
- APPENDIX 7.1 HERITAGE STATEMENT
- APPENDIX 7.1 HERITAGE STATEMENT
- APPENDIX 7.1 HERITAGE STATEMENT
- APPENDIX 7.1 HERITAGE STATEMENT
- APPENDIX 7.1 HERITAGE STATEMENT
- APPENDIX 7.1 HERITAGE STATEMENT
- HERITAGE STATEMENT
- HERITAGE STATEMENT
- HERITAGE STATEMENT
- HERITAGE STATEMENT
- HERITAGE STATEMENT
- HERITAGE STATEMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- APPENDIX 5.13 PHOTOMONTAGE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Cambridgeshire granted permission on 5 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Street Record Low Fen Drove Way Fen Ditton Cambridgeshire
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed renewable energy development.
Decided Outline 20 docs
Other full applications
In South Cambridgeshire
-
26/01269/FUL Granted
Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ
Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.
-
26/02714/FUL Granted
Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY
Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.
-
25/04556/FUL Refused
Land At Station Road Willingham Cambridgeshire
Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.
-
26/03702/FUL Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.
-
26/02792/FUL Granted
128 Limes Road Hardwick Cambridgeshire CB23 7XU
Proposed hair salon in rear garden of dwelling.