Planning application
Cambridge Science Park Milton Road Cambridge Cambridgeshire
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning application with all matters reserved for a mixed-use redevelopment of Cambridge Science Park in separate and severable components each representing severable permitted areas comprising: Flexible employment uses including research and development, office, and workspace, industrial and storage (including data) uses (Use Classes E(g), B2, B8 and sui generis), Flexible Class E, Class F1 and F2, C1 (hotel) and Sui Generis (bar and hot food takeaway) uses to support the operation of the wider Science Park, Highway works, including new vehicular, cyclist and pedestrian roads and paths, and car and cycle parking facilities including mobility hubs with associated electric vehicle charging infrastructure, Landscape and public realm, including areas for sustainable urban drainage systems, biodiversity areas, outdoor play and sports facilities (Use Class F2(c)), Utility, energy, and water facilities and infrastructure, together with enabling, site clearance, demolition and associated works, including temporary meanwhile uses (this includes application ref: 26/01872/OUT).
As published by the council, reference 26/01902/OUT
Application record
- Reference
- 26/01902/OUT
- Type
- Outline Application
- Status
- Awaiting decision
- Received
- 19 May 2026
- Validated
- 19 May 2026
- Ward
- Milton & Waterbeach
Timeline
Dates from the published record
-
19 May 2026
Received by South Cambridgeshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 26/01872/OUT (Awaiting decision)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,645 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
257 documents on file for this application
- NATURAL ENGLAND
- NATURAL ENGLAND
- WASTE - SHARED SERVICE
- ECOLOGY
- SPORT ENGLAND COMMENTS
- NATIONAL GAS COMMENTS
- ANGLIAN WATER
- ANGLIAN WATER
- ARCHAEOLOGY
- AMENDED DESIGN AND ACCESS STATEMENT
- AMENDED DESIGN CODE
- COVERING LETTER - AMENDMENTS V2 - CCC
- COVERING LETTER - AMENDMENTS V2 SCDC
- ECOSYSTEM NOTE
- AMENDED DEVELOPMENT ZONE PARAMETER PLAN
- AMENDED PARKING MANAGEMENT PLAN
- LETTER FROM TOWNSCAPE CONSULTANCY
- AMENDED ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA
- ADDENDUM-APPENDIX 03-PHOTOS (VP35-37)
- ADDENDUM-APPENDIX-06
- LVIA ADDENDUM
- LVIA-APPENDIX-04-LS-SCOPING
- AMENDED LAND USE PARAMETER PLAN
- PLANNING STATEMENT ADDENDUM
- FILE COPY OF AMENDMENT LETTER
- TREES
- BUILDING SAFETY REGULATOR COMMENTS
- ENVIRONMENTAL QUALITY AND GROWTH
- AMENDED GREEN & BLUE INFRASTRUCTURE PARAMETER PLAN
- AMENDED LAYOUT PARAMETER PLAN
- WATER VOLE SURVEY NOTE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- CAMBRIDGE CITY AIRPORT
- TREES
- AMENDED ACCESS AND MOVEMENT PARAMETER PLAN
- ENVIRONMENTAL STATEMENT ADDENDUM REPORT_FINAL
- AMENDED ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY
- DRAINAGE STRATEGY TECHNICAL NOTE
- ADDENDUM-APPENDIX 03-PHOTOS (VP10-12)
- ADDENDUM-APPENDIX 03-PHOTOS (VP15-17)
- ADDENDUM-APPENDIX 03-PHOTOS (VP2-9)
- ADDENDUM-APPENDIX 03-PHOTOS (VP30-34)
- ADDENDUM-APPENDIX-07
- LVIA-APPENDIX-05-LS-PPA
- AMENDED UTILITIES STATEMENT
- TRANSPORT ASSESSMENT AND PARKING MANAGEMENT PLAN COMMENTS RESPONSE
- AMENDED DEVELOPMENT SPECIFICATION
- AMENDED PUBLIC ART STRATEGY
- ADDENDUM-APPENDIX 03-PHOTOS (VP19-21)
- ADDENDUM-APPENDIX 03-PHOTOS (VP22-29)
- LVIA-APPENDIX-01-METHODOLOGY
- LVIA-APPENDIX-02-FIGURES
- FRAMEWORK PARAMETER PLAN
- AMENDED HEIGHT PARAMETER PLAN
- EOT REQUEST
- ENVIRONMENT AGENCY
- CAMBRIDGE COUNTY COUNCIL MINERALS & WASTE
- NATURAL ENGLAND
- ARCHAEOLOGICAL OFFICER
- ARCHAEOLOGICAL OFFICER
- CAMBRIDGE COUNTY COUNCIL PARKING MANAGEMENT PLAN COMMENTS
- CAMBRIDGE COUNTY COUNCIL TRAVEL PLAN COMMENTS
- CAM CYCLE COMMENTS
- CAMBRIDGE COUNTY COUNCIL TRANSPORT ASSESSMENT TEAM COMMENTS
- LANDSCAPE OFFICER COMMENTS
- CAMCYCLE
- HIA
- URBAN DESIGN COMMENTS
- PARISH
- ENVIRONMENTAL QUALITY AND GROWTH
- PLANNING STATEMENT PAGE 61
- COMMUNITIES TEAM COMMENTS
- HISTORIC ENGLAND COMMENTS
- CONSERVATION OFFICER COMMENTS
- CAMBRIDGE COUNTY COUNCIL ACTIVE TRAVEL TEAM COMMENTS
- PUBLIC ART OFFICER COMMENTS
- COVER EMAIL
- ANGLIAN WATER REPORT
- LANDSCAPE
- SUSTAINABILITY
- ENVIRONMENTAL HEALTH
- DEFINITIVE MAP TEAM
- CONTAMINATED LAND
- ENVIRONMENTAL PLANNING
- DEFINITIVE MAP TEAM
- AIRPORT SAFEGUARDING
- AIRPORT SAFEGUARDING
- NATIONAL HIGHWAYS COMMENTS
- ECOLOGY
- LOCAL HIGHWAY AUTHORITY
- LOCAL HIGHWAY AUTHORITY
- SUSTAINABILITY
- LLFA
- YOUTH ENGAGEMENT
- CAMBRIDGE CITY AIRPORT
- HEALTH AND SAFETY EXECUTIVE
- NATIONAL GAS
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- WASTE - SHARED SERVICE
- WASTE - SHARED SERVICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- FEE CALCULATION
- APPLICATION FORM - NO PERSONAL INFO
- ATTACHMENT SUMMARY FROM PORTAL
- ENVIRONMENTAL STATEMENT VOLUME 3 TECHNICAL APPENDICES APPENDIX: EIA METHODOLOGY ANNEX 1
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- ENVIROMENTAL STATEMENT VOLUME 2B PART 9
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- SUPSERSEDED ES HTVIA
- ECONOMIC NEEDS ASSESSMENT
- SITE LOCATION PLAN EXISTING
- SITE PLAN EXISTING WITH LEVELS
- STATEMENT OF COMMUNITY ENGAGEMENT
- SUSTAINABILITY STATEMENT
- TRANSPORT ASSESSMENT (PART 2 OF 2)
- TREE SURVEY
- SUPERSEDED UTILITIES STATEMENT REPORT
- WORKFORCE ACCESSIBILITY
- STATUTORY BIODIVERSITY METRIC
- CAMBRIDGE INDEPENDENT FRONT PAGE
- CAMBRIDGE INDEPENDENT PAGE 66
- ENVIRONMENTAL STATEMENT VOLUME 3 TECHNICAL APPEDNDICES APPENDIX CLIMATE CHANGE
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- ENVIRONMENT STATEMENT VOLUME 3 TECHNICAL APPENDICES APPENDIX AIR QUALITY
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- ENVIROMENTAL STATEMENT VOLUME 3 APPENDIX TRAFFIC AND MOVEMENT
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- ENVIRONMENTAL STATEMENT VOLUME 3 TECHNICAL APPENDICES APPENDIX EIA METHODOLOGY ANNEX 1
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- SUPSERSEDED DESIGN & ACCESS STATEMENT
- ARCHAEOLOGICAL DESK BASED ASSESSMENT 1 OF 2
- ARCHAEOLOGICAL DESK BASED ASSESSMENT 2 OF 2
- BIODIVERSITY NET GAIN APPRAISAL
- PLANNING STATEMENT
- USER GUIDE
- SUPERSEDED ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY
- ECONOMIC ASSESSMENT
- ENERGY STATEMENT
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 2 EIA METHODOLOGY
- ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 3 ALTERNATIVES AND DESIGN EVOLUTION
- ENVIROMENTAL STATEMENT VOLUME 1 CHAPTER 5 DEMOLITION AND CONSTRUCTION
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 6 SOCIO-ECONOMICS
- SUPERSEDED ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 7 HEALTH
- ENVIROMENTAL STATEMENT VOLUME 1 CHAPTER 8 TRAFFIC AND MOVEMENT
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 9 AIR QUALITY
- SUPERSEDED ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 10 NOISE AND VIBRATION
- ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 11 ECOLOGY AND BIODIVERSITY
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 12 WATER RESOURCE, FLOOD RISK AND DRAINAGE
- ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 13 CLIMATE CHANGE
- ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 14 EFFECT INTERACTIONS
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 15 SIGNIFICANT EFFECTS
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 16 ENVIRONMENTAL MANAGEMENT, MITIGATION
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 4 PROPOSED DEVELOPMENT
- FLOOD RISK ASSESSMENT
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 02-FIGURES
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOS AND AVRS (VP10-12)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP15-17)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP19-21)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP2-9)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP22-29)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP30-34)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 03-PHOTOSHEETS AND AVRS (VP35-37)
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 01 DETAILED METHODOLOGY
- ENVIRONMENTAL STATEMENT VOLUME 2A APPENDIX 04 CORRESPONDENCE
- SUPERSEDED ENVIRONMENTAL STATEMENT VOLUME 2A LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- PHASE 1 PRELIMINARY RISK ASSESSMENT
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- SUPERSEDED [VALUES VARY]
- ECOLOGY AND BIODIVERSITY APPRAISAL
- PRELIMINARY ECOLOGICAL APPRAISAL
- FLOOD RISK AND DRAINAGE PART 1
- FLOOD RISK AND DRAINAGE PART 2
- FLOOD RISK AND DRAINAGE PART 3
- SUPERSEDED DESIGN CODES PART 1
- SUPERSEDED DESIGN CODES PART 2
- SUPERSEDED DESIGN CODES PART 3
- SUPERSEDED DESIGN CODES PART 4
- SUPERSEDED DESIGN CODES PART 5
- SUPERSEDED DESIGN CODES PART 6
- SUPERSEDED DESIGN CODES PART 8
- SUPERSEDED DESIGN CODES PART 9
- SUPERSEDED DESIGN CODES PART 7
- SITE WIDE TRAVEL PLAN
- COVERING LETTER
- SUPERSEDED DEVELOPMENT SPECIFICATION
- SUPERSEDED PARKING MANAGEMENT PLAN
- TRANSPORT ASSESSMENT (PART 1 OF 2)
- DRAINAGE STRATEGY REPORT
- ENVIRONMENTAL STATEMENT VOLUME 1CHAPTER 1INTRODUCTION
- ENVIRONMENTAL STATEMENT VOLUME 3 TECHNICAL APPENDICES
- MINUTES OF LANDSCAPE - RELATED PPA MEETINGS
- OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 1
- OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 2
- OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 3
- OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 4
- OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 5
- OUTLINE OPERATIONAL WASTE MANAGEMENT STRATEGY
- OUTLINE SITE CONSTRUCTION MANAGEMENT PLAN
- SUPERSEDED OUTLINE PUBLIC ART STRATEGY
- COVER EMAIL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided outline applications in a median of 136 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
194 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0AB
79% historically approved · decision due ~30 Nov
Installation of a 230 kWp solar canopy on a car port roof for renewable energy generation and on-site consumption at Raspberry Pi.
Awaiting decision Prior approval 12 docs -
163 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GQ
86% historically approved · decision due ~2 Sep
Demolition of existing building and development of new commercial building, including access, landscaping and ancillary infrastructure
Awaiting decision Full applications Demolition 152 docs -
Cambridge Science Park Milton Road Cambridge Cambridgeshire
95% historically approved · decision due ~17 Aug
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed dry lab, workspaces and ancillary facilities.
Awaiting decision Outline 8 docs -
29 Cambridge Science Park Milton Cambridgeshire CB4 0DW
Installation of a Plant Condenser unit on the roof of the Auton Building
Granted Full applications 16 docs -
Cambridge Science Park Milton Road Cambridge Cambridgeshire
EIA Scoping Opinion request pursuant to Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) Proposed Development consists of a full planning application for the northern plot for a landmark building/multi-tenant lab building, multi-storey car park and highway works and outline planning application (all matters reserved apart from access) for the southern plot for two office/research/development buildings, The Trinity Centre and Cambridge Science Centre.
Decided Outline 29 docs -
191 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GW
Request for an EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for 191 Cambridge Science Park.
Decided Outline 17 docs
Other outline applications
In South Cambridgeshire
-
25/03723/OUT Refused
Land To The West Of Primary School Hurdleditch Road Orwell Cambridgeshire
Outline application for residential development of land for up to 3 No. dwellings (all matters reserved except access)
-
25/04768/OUT Granted
Manor Farm Papworth Road Graveley Cambridgeshire PE19 6PH
Outline application for the erection of up to 2no self-build/ custom build dwellings including vehicular access from Papworth Road
-
26/03288/SCRE Decided
Sawston Greenway Cambridgeshire
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for a new non-motorised shared use path (also referred to as a Greenway) for use by cyclists, pedestrians and where possible horse-riders, linking Sawston to Cambridge city centre, via the villages of Great Shelford and Stapleford. From north to south, the Greenway would begin in Cambridge at the intersection between Long Road (A1134) and Robinson Way on the Cambridge Biomedical Campus (CBC), extending along Robinson Way and then following Francis Crick Avenue south to join the Genome Path. The route would then follow the Genome Path until linking into the village of Great Shelford at Charston Road and passing behind Shelford train station. Exiting Great Shelford, the route goes south-east through Stapleford village connecting to London Road (A1301).
-
25/04624/PIP Refused
Land Adj 170 Rampton Road Willingham Cambridgeshire CB24 5JF
Erection of 2 custom build /self-build dwellings.
-
26/02947/SCRE Decided
Street Record St Neots Road Hardwick Cambridgeshire
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for upto 138 residential dwellings along with associated infrastructure including provision of new site access, internal roads, parking, public open space, landscaping and biodiversity enhancements and other associated works with all matters reserved except for the primary point of access onto St Neots Road.