Planning application
Kendal Court Cambridge Road Impington Cambridgeshire
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing buildings and redevelopment of the site for a new residential-led mixed-use development including commercial development, with associated landscaping and supporting infrastructure and works
As published by the council, reference 25/04793/FUL
Application record
- Reference
- 25/04793/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 9 Dec 2025
- Validated
- 9 Dec 2025
- Ward
- Histon & Impington
- Parish
- Histon & Impington
Timeline
Dates from the published record
-
9 Dec 2025
Received by South Cambridgeshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Bidwells LLP Agent, registered in Cambridge
Active · incorporated 2009 · Cambridge
990 applications on PlanIndex · across 108 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
163 documents on file for this application
- ANGLIAN WATER REPORT
- TREES
- EDUCATION
- URBAN DESIGN
- LOCAL HIGHWAY AUTHORITY
- LOCAL HIGHWAY AUTHORITY
- CRIME PREVENTION DESIGN TEAM
- ECOLOGY
- BNE LANDSCAPE
- SUSTAINABILITY
- URBAN DESIGN
- 2A SOUTH ROAD
- CRIME PREVENTION DESIGN TEAM
- PLACE SERVICES - TREES
- ENVIRONMENTAL PLANNING
- LANDSCAPE
- SUSTAINABILITY
- ENVIRONMENTAL PLANNING
- parish
- CONTAMINATED LAND
- ECOLOGY
- WASTE - SHARED SERVICE
- HOUSING STRATEGY
- FILE COPY OF AMENDMENT LETTER
- ARCHAEOLOGY
- LOCAL LEAD FLOOD AUTHORITY
- DEFINITIVE MAP TEAM
- TRAVEL PLAN
- TRANSPORT STATEMENT
- DETAILED HARD LANDSCAPE PROPOSALS - GROUND FLOOR
- DETAILED PLANTING PROPOSALS - GROUND FLOOR
- LANDSCAPE MASTERPLAN
- LANDSCAPE DESIGN & ACCESS STATEMENT
- BRE209 DAYLIGHT AND SUNLIGHT ASSESSMENT
- DRAINAGE STRATEGY
- SUDS DETAILS
- NOISE IMPACT ASSESSMENT ADDENDUM
- ARBORICULTURAL IMPACT ASSESSMENT 10.04.26
- DRAINAGE STRATEGY CALCULATIONS
- SECTION 106 DEVELOPER PROPOSAL
- EHP RESPONSE
- DESK STUDY REPORT
- LETTER OF INTENT KENDAL COURT ENTERPRISE
- PROPOSED SITE PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED CROSS SECTION
- PROPOSED NORTH AND EAST ELEVATIONS
- PROPOSED SOUTH AND WEST ELEVATIONS
- SECTION B - DETAIL
- FLOOD RISK ASSESSMENT
- FOUL WATER AND STORM WATER DRAINAGE STRATEGY
- SUMMARY OF CONSULTEE COMMENT RESPONSES
- HOUSING STRATEGY
- ANGLIAN WATER
- ANGLIAN WATER
- ENVIRONMENT AGENCY
- ARCHAEOLOGY
- WASTE - SHARED SERVICE
- FILE COPY OF AMENDMENT LETTER
- SITE NOTICE
- TREES
- S106 OFFICER COMMENTS
- HISTON AND IMPINGTON PARISH
- ECOLOGY
- 2A SOUTH ROAD
- URBAN DESIGN
- ANGLIAN WATER REPORT
- LANDSCAPE
- NHS AMBULANCE SERVICE
- CLIMATE, WASTE & ENVIRONMENT
- RIGHT OF LIGHT CONSULTING
- SUSTAINABILITY
- LOCAL HIGHWAY AUTHORITY
- HOUSING STRATEGY
- CLIMATE, WASTE & ENVIRONMENT
- CLIMATE, WASTE & ENVIRONMENT
- CRIME PREVENTION DESIGN TEAM (ESTATES)
- CAMBRIDGESHIRE & PETERBOROUGH INTEGRATED CARE SYSTEM
- ARCHAEOLOGY COMMENTS
- WASTE - SHARED SERVICE
- CAMBS FIRE AND RESCUE
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- DEFINITIVE MAP TEAM
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- LOCAL LEAD FLOOD AUTHORITY
- STATUTORY BIODIVERSITY METRIC
- CGI VISUALS
- FEE CALCULATION
- APPLICATION FORM - NO PERSONAL INFO
- ATTACHMENT SUMMARY FROM PORTAL
- HOUSING STATEMENT AND SPACE STANDARDS
- DETAILED PLANTING PROPOSALS - FIRST FLOOR
- DETAILED HARD LANDSCAPE PROPOSALS - FIRST FLOOR
- DETAILED HARD LANDSCAPE PROPOSALS - SECOND FLOOR
- DETAILED HARD LANDSCAPE PROPOSALS - THIRD FLOOR
- DETAILED PLANTING PROPOSALS - THIRD FLOOR
- DETAILED PLANTING PROPOSALS - SECOND FLOOR
- LANDSCAPE MASTERPLAN
- DESIGN & ACCESS STATEMENT
- LANDSCAPE SPECIFICATION AND PLANTING DETAILS
- LIGHTING STRATEGY
- BRE209 DAYLIGHT & SUNLIGHT ASSESSMENT
- DRAINAGE STRATEGY
- SUDS DETAILS
- NOISE IMPACT ASSESSMENT
- DETAILED HARD LANDSCAPE PROPOSALS - GROUND FLOOR
- DETAILED PLANTING PROPOSALS - GROUND FLOOR
- ARBORICULTURAL IMPACT ASSESSEMENT NOV 2025
- LANDSCAPE DESIGN & ACCESS STATEMENT
- EXISTING PLAN
- EXISTING ELEVATIONS
- TRAVEL PLAN
- FINANCIAL VIABILITY ASSESSMENT REPORT
- COVERING LETTER
- HEALTH IMPACT ASSESSMENT
- AIR QUALITY ASSESSMENT
- ENERGY STATEMENT
- PART O OVERHEATING RISK ASSESSMENT REPORT
- KENDAL COURT PLANNING STATEMENT 051225
- UTILITIES STATEMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- BAT EMERGENCE SURVEY
- PRELIMINARY ROOST ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- SITE LOCATION PLAN
- PROPOSED SITE PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED CROSS SECTIONS
- PROPOSED WALKWAY SECTION
- PROPOSED NORTH AND EAST ELEVATIONS
- PROPOSED SOUTH AND WEST ELEVATIONS
- AMENITY AREA CALCULATIONS
- TRANSPORT STATEMENT PAGE 1-50
- TRANSPORT STATEMENT PAGE 51-78
- GROUND INVESTIGATION REPORT (PAGE 1-50)
- GROUND INVESTIGATION REPORT (PAGE 51-100)
- GROUND INVESTIGATION REPORT (PAGE 101-136)
- DESTOP BASED SEARCH REPORT (PAGE 1-50)
- DESK BASED SEARCH REPORT (PAGE 51-100)
- DESK BASED SEARCH REPORT (PAGE 101-150)
- DESK BASED SEARCH REPORT (PAGE 151-200)
- DESK BASED SEARCH REPORT (PAGE 201-234)
- FLOOD RISK ASSSESSMENT (PAGE 1-50)
- FLOOD RISK ASSSESSMENT (PAGE 51-100)
- FLOOD RISK ASSSESSMENT (PAGE 101-166)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 1-50)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 51-100)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 101-150)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 151-200)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 201-250)
- FOUL AND STORM WATER DRAINAGE STRATEGY (PAGE 251-285)
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided full applications in a median of 143 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Copse New Road Impington Cambridgeshire
5 DAY NOTICE TD1 - Beech and SBD22 - Sycamore, Remove. Trees are in severe decline, 90% dead and are positioned in a public area.
Granted Trees 7 docs -
The Former Bishops Site Cambridge Road Impington Cambridge Cambridgeshire CB24 9NU
95% historically approved · decision due ~15 Aug
Submission of details required by conditions 9 (hard and soft landscape works), 11 (boundary treatment) and 12 (balconies, balustrading, parapets, coping,eaves, verges, juctions between different materials, entrances, doors, windows and rooflights) of planning permission 21/02902/FUL
Awaiting decision Conditions Loft or dormer Windows or glazing 18 docs -
The Former Bishops Site Cambridge Road Impington Cambridge Cambridgeshire CB24 9NU
Erection of 38 residential apartments and the partially below ground car parking, cycle and refuse storage, hard and soft landscaping and associated infrastructure (alterations to the approved scheme granted under S/0671/17/FL and 20/03690/S73)
Granted Full applications New dwelling 82 docs -
The Former Bishops Site Cambridge Road Impington Cambridge Cambridgeshire CB24 9NU
Submission of details required by conditions 4 (Surface Water Maintenance), 15 (Foul Water Maintenance), 24 (Noise), 29 (Surface Water Drainage) and 30 (Foul Water Drainage) of planning permission 21/02902/FUL
Granted Conditions 21 docs -
The Former Bishops Site Cambridge Road Impington Cambridge Cambridgeshire CB24 9NU
Submission of details required by condition 9 (hard and soft landscape works) of planning permission 21/02902/FUL
Withdrawn Conditions 17 docs -
1-21 Pine Court Impington Cambridgeshire CB24 9ZT
T9 - Beech - Fell to ground level due to poor condition T15 - Beech - Raise and cut back lower branches that overhang the road to 5m T16 - Beech - Raise and cut back lower branches that overhang the road to 5m T17 - Beech - Raise and cut back lower branches that overhang the road to 5m T19 - Beech - Raise and cut back lower branches that overhang the road to 5m T21 - Beech - Raise to 5m and prune away from building to create a 2-3m gap
Granted Trees 6 docs
Other full applications
In South Cambridgeshire
-
26/01269/FUL Granted
Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ
Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.
-
25/01014/FUL Granted
Land Off Low Fen Drove Way Horningsea Cambridgeshire
Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.
-
26/02714/FUL Granted
Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY
Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.
-
25/04556/FUL Refused
Land At Station Road Willingham Cambridgeshire
Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.
-
26/03702/FUL Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.