Planning application
191 Cambridge Science Park Milton Cambridgeshire CB4 0GW
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of two-storey 2,145.2 sqm (GIA) extension to the north-west of the existing building to provide a new filling and packaging hall (B2 and B8 uses) with first-floor specialist building services plant, enclosed link to the existing warehouse at ground level and roof-mounted solar photovoltaics, along with installation of external plant, relocation of external recycling compound, new groundsman store, alterations to existing car park, new landscaping scheme and associated external works.
As published by the council, reference 25/00113/FUL
Application record
- Reference
- 25/00113/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Granted Permission
- Received
- 13 Jan 2025
- Validated
- 13 Jan 2025
- Decided
- 3 Jul 2025
- Ward
- Milton & Waterbeach
- Parish
- Milton CP
- Decision by
- Joint Development Control committee
- Postcode
- CB4 0GW
Timeline
Dates from the published record
-
13 Jan 2025
Received by South Cambridgeshire
-
3 Jul 2025
Decision issued: Granted Permission
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
84 documents on file for this application
- DECISION NOTICE
- PLANNING COMMITTEE REPORT 18.06.2025
- POST COMMITTEE OFFICER NOTE
- AGENT/APPLICANT PUBLIC SPEAKING LETTER
- NOTIFIED NEIGHBOURS LIST
- ACCESS OFFICER COMMENTS
- ANGLIAN WATER COMMENTS
- UPDATED DESIGN AND ACCESS STATEMENT
- CAMBRIDGE CITY AIRPORT COMMENTS
- LANDSCAPE
- EOT REQUEST
- LOCAL LEAD FLOOD AUTHORITY COMMENTS
- WASTE - SHARED SERVICE
- CAMBRIDGE CITY AIRPORT COMMENTS
- ACCESSIBILITY STUDY
- GENERAL ARRANGEMENT SITE PLAN
- LANDSCAPE PROPOSALS
- LANDSCAPE PROPOSALS TO BUILDING DEVELOPMENT
- CONTEXT PLAN - PROPOSALS
- GLINT AND GLARE ASSESSMENT
- RESPONSE TO LLFA COMMENTS TECHNICAL NOTE
- RESPONSE TO COMMENTS LETTER
- ANGLIAN WATER COMMENTS
- EOT REQUEST
- ECOLOGY
- TREES
- SUSTAINABILITY OFFICER COMMENTS UPDATED
- HOWES PERCIVAL LLP
- URBAN DESIGN
- ACCESS OFFICER COMMENTS
- PARISH
- LANDSCAPE
- TRANSPORT ASSESSMENT
- LOCAL HIGHWAY AUTHORITY
- LLFA
- ENVIRONMENTAL PLANNING
- CRIME PREVENTION DESIGN TEAM (ESTATES)
- SUSTAINABILITY
- ANGLIAN WATER
- CONTAMINATED LAND
- FIRE & RESCUE SERVICES
- CAMBRIDGE AIRPORT
- NATURAL ENGLAND
- COUNTY MINERALS AND WASTE
- NATIONAL HIGHWAYS
- MINISTRY OF DEFENCE (MOD)
- ARCHAEOLOGICAL OFFICER
- WASTE - SHARED SERVICE
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- LOCATION PLAN
- SUSTAINABILITY REPORT
- FIRST FLOOR GENERAL ARRANGEMENT PLAN
- ARCHITECTURAL TIDP
- SITE PLAN
- PROPOSED ELEVATIONS 1/2
- GROUND FLOOR GENERAL ARRANGEMENT PLAN
- LANDSCAPE PROPOSALS
- LANDSCAPE PROPOSALS TO DEVELOPMENT
- LANDSCAPE - EXISTING LOCATION PLAN
- GENERAL ARRANGEMENT SECTION A-A AND SECTION B-B
- LANDSCAPE - EXISTING CONTEXT PLAN
- LANDSCAPE - CONTEXT PLAN PROPOSALS
- LIGHTING ASSESSMENT
- ECOLOGICAL IMPACT ASSESSMENT
- ROOF LEVEL GENERAL ARRANGEMENT PLAN
- DESIGN MODEL IN CONTEXT VISUALISATION
- TREE PROTECTION PLAN
- BIODIVERSITY NET GAIN ASSESSMENT
- PRELIMINARY ECOLOGICAL ASSESSMENT
- LANDSCAPE - EXISINTG CONTEXT PLAN
- PHASE I PRELIMINARY CONTAMINATION RISK ASSESSMENT
- PHASE II GROUND INVESTIGATION REPORT
- FLOOD RISK ASSSESSMENT AND DRAINAGE STRATEGY
- LOCATION PLAN
- CONTEXT VIEWS AND TRIPOD POSITIONS
- LANDSCAPE AND VISUAL APPRAISAL
- PLANT NOISE ASSESSMENT
- PLANNING STATEMENT
- BIODIVERSITY METRIC CALCULATION TOOL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Cambridgeshire granted permission on 3 July 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
191 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GW
Submisssion of details required by condition 6 (Surface Water Drainage) of planning permission 25/00113/FUL.
Granted Conditions 17 docs -
191 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GW
Request for an EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for 191 Cambridge Science Park.
Decided Outline 17 docs -
191 Cambridge Science Park Milton CB4 0GW
Alterations to Loading Bay 3 to provide a wider opening and provision of a weather proof enclosure for unloading vehicles.
Granted Full applications 18 docs -
194 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0AB
79% historically approved · decision due ~30 Nov
Installation of a 230 kWp solar canopy on a car port roof for renewable energy generation and on-site consumption at Raspberry Pi.
Awaiting decision Prior approval 12 docs -
194 Cambridge Science Park Milton Cambridgeshire CB4 0AB
Installation of a roof mounted 83kW Photovoltaic array with a 66kW inverter over two levels and in three different areas.
Granted Prior approval 19 docs -
Cambridge Science Park Milton Road Cambridge Cambridgeshire
53% historically approved · decision due ~14 Jul
Outline planning application with all matters reserved for a mixed-use redevelopment of Cambridge Science Park in separate and severable components each representing severable permitted areas comprising: Flexible employment uses including research and development, office, and workspace, industrial and storage (including data) uses (Use Classes E(g), B2, B8 and sui generis), Flexible Class E, Class F1 and F2, C1 (hotel) and Sui Generis (bar and hot food takeaway) uses to support the operation of the wider Science Park, Highway works, including new vehicular, cyclist and pedestrian roads and paths, and car and cycle parking facilities including mobility hubs with associated electric vehicle charging infrastructure, Landscape and public realm, including areas for sustainable urban drainage systems, biodiversity areas, outdoor play and sports facilities (Use Class F2(c)), Utility, energy, and water facilities and infrastructure, together with enabling, site clearance, demolition and associated works, including temporary meanwhile uses (this includes application ref: 26/01872/OUT).
Awaiting decision Outline Demolition 257 docs
Other full applications
In South Cambridgeshire
-
26/01269/FUL Granted
Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ
Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.
-
25/01014/FUL Granted
Land Off Low Fen Drove Way Horningsea Cambridgeshire
Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.
-
26/02714/FUL Granted
Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY
Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.
-
25/04556/FUL Refused
Land At Station Road Willingham Cambridgeshire
Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.
-
26/03702/FUL Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.