Planning application
210-240 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0WA
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing units 210, 211, 214, 220, 230, 240 and redevelopment with Use Class E(g) floorspace (office) (E(g)(i)), research and development (E(g)(ii)) with complementary floorspace (Use Class E (a-g)) along with access, landscaping and supporting infrastructure. Retention of Unit 216.
As published by the council, reference 24/04575/FUL
Application record
- Reference
- 24/04575/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 5 Dec 2024
- Validated
- 5 Dec 2024
- Ward
- Milton & Waterbeach
- Parish
- Milton CP
- Postcode
- CB4 0WA
Timeline
Dates from the published record
-
5 Dec 2024
Received by South Cambridgeshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 January 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Bidwells LLP Agent, registered in Cambridge
Active · incorporated 2009 · Cambridge
990 applications on PlanIndex · across 108 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordBrockton Everlast Inc. Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
354 documents on file for this application
- EOT REQUEST
- EOT REQUEST
- EOT REQUEST
- EOT REQUEST
- EOT REQUEST
- EOT REQUEST
- EOT REQUEST
- SITE NOTICE
- SITE NOTICE
- POST COMMITTEE REPORT - APPLICANT CORRESPONDENCE
- ANGLIAN WATER COMMENTS
- ENVIRONMENT STATEMENT CLARIFICATION - WASTEWATER 1 OF 2
- ENVIRONMENT STATEMENT CLARIFICATION - WASTEWATER 2 OF 2
- AGENT/APPLICANT PUBLIC SPEAKING LETTER
- REVISED ANGLIAN WATER COMMENTS
- REVISED ANGLIAN WATER COMMENTS
- ANGLIAN WATER COMMENTS
- ANGLIAN WATER COMMENTS
- LLFA
- AGENT RESPONSE TO LLFA COMMENTS
- LOCAL LEAD FLOOD AUTHORITY COMMENTS
- COUNTY TRANSPORT ASSESSMENT COMMENTS
- ANGLIAN WATER COMMENTS
- CONTAMINATED LAND
- LOCAL HIGHWAY AUTHORITY
- LANDSCAPE
- HEALTH IMPACT ASSESSMENT OFFICER COMMENTS
- AMENDED COVERING LETTER
- AMENDED TRANSPORT ASSESSMENT ADDENDUM
- AMENDED LANDSCAPE RESPONSE
- AMENDED ES ADDENDUM LETTER
- AMENDED FIRST PUBLIC DRAIN TECHNICAL NOTE
- AMENDED HEALTH IMPACT ASSESSMENT
- AMENDED DRAINAGE STRATEGY REPORT
- AMENDED GROUND INVESTIGATION REPORT
- URBAN DESIGN COMMENTS
- CAMCYCLE
- ECOLOGY
- LANDSCAPE
- COUNTY TRANSPORT ASSESSMENT COMMENTS
- SUSTAINABILITY
- HEALTH IMPACT ASSESSMENT
- HEALTH IMPACT ASSESSMENT
- LOCAL HIGHWAY AUTHORITY
- ENVIRONMENTAL PLANNING
- ANGLIAN WATER
- NATIONAL HIGHWAYS
- AIR QUALITY
- VIEWPOINT 1
- VIEWPOINT 10
- VIEWPOINT 11
- VIEWPOINT 12
- VIEWPOINT 13
- VIEWPOINT 14
- VIEWPOINT 15
- VIEWPOINT 16
- VIEWPOINT 17
- VIEWPOINT 18
- VIEWPOINT 19
- VIEWPOINT 2
- VIEWPOINT 20
- VIEWPOINT 3
- VIEWPOINT 4
- VIEWPOINT 5
- VIEWPOINT 6
- VIEWPOINT 7
- VIEWPOINT 8
- VIEWPOINT 9
- PHOTOMONTAGE VIEW 1 PART 1
- PHOTOMONTAGE VIEW 1 PART 2
- PHOTOMONTAGE VIEW 11A
- PHOTOMONTAGE VIEW 11B
- PHOTOMONTAGE VIEW 14A
- PHOTOMONTAGE VIEW 14B
- PHOTOMONTAGE VIEW 15A
- PHOTOMONTAGE VIEW 15B
- PHOTOMONTAGE VIEW 20
- PHOTOMONTAGE VIEW 5
- PHOTOMONTAGE VIEW 6
- PHOTOMONTAGE VIEW 7
- PHOTOPANEL VIEWPOINT 1
- PHOTOPANEL VIEWPOINT 10
- PHOTOPANEL VIEWPOINT 11
- PHOTOPANEL VIEWPOINT 12
- PHOTOPANEL VIEWPOINT 13
- PHOTOPANEL VIEWPOINT 14
- PHOTOPANEL VIEWPOINT 15
- PHOTOPANEL VIEWPOINT 16
- PHOTOPANEL VIEWPOINT 17
- PHOTOPANEL VIEWPOINT 18
- PHOTOPANEL VIEWPOINT 19
- PHOTOPANEL VIEWPOINT 2
- PHOTOPANEL VIEWPOINT 20
- PHOTOPANEL VIEWPOINT 3
- PHOTOPANEL VIEWPOINT 4
- PHOTOPANEL VIEWPOINT 5
- PHOTOPANEL VIEWPOINT 6
- PHOTOPANEL VIEWPOINT 7
- PHOTOPANEL VIEWPOINT 8
- PHOTOPANEL VIEWPOINT 9
- PROPOSED DEMOLITION PLAN
- ES APPENDIX 4.1 SED-SRA-XX-00-DR-A-02100
- ES APPENDIX 4.1 SED-SRA-XX-01-DR-A-02101
- ES APPENDIX 4.1 SED-SRA-XX-02-DR-A-02102
- ES APPENDIX 4.1 SED-SRA-XX-03-DR-A-02103
- ES APPENDIX 4.1 SED-SRA-XX-04-DR-A-02104
- ES APPENDIX 4.1 SED-SRA-XX-05-DR-A-02105
- ES APPENDIX 4.1 SED-SRA-XX-06-DR-A-02106
- ES APPENDIX 4.1 SED-SRA-XX-B1-DR-A-02109
- ES APPENDIX 4.1 SED-SRA-XX-B2-DR-A-02110
- ES APPENDIX 4.1 SED-SRA-XX-TR-DR-A-02108
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02002
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02010
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02011
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02012
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02013
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02014
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02015
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02016
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02200
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02201
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02202
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02203
- ES APPENDIX 4.1 SED-SRA-XX-XX-DR-A-02300
- AIR QUALITY ASSESSMENT
- APPENDIX 10.1 TRANSPORT ASSESSMENT
- APPENDIX 10.2 TRAVEL PLAN
- APPENDIX 10.3 PERSONAL COLLISION INJURY DATA
- APPENDIX 10.4 TEMPRO GROWTH FACTORS - TRAFFIC DATA
- APPENDIX 11.1 GROUND INVESTIGATION REPORT - PART1
- APPENDIX 11.1 GROUND INVESTIGATION REPORT - PART3
- APPENDIX 11.1 GROUND INVESTIGATION REPORT - PART4
- APPENDIX 11.1 GROUND INVESTIGATION REPORT -PART2
- APPENDIX 11.2 MANAGEMENT OF SURFACE AND GROUNDWATER DURING CONSTRUCTION
- APPENDIX 11.3 WATER USE GREYWATER RECYCLING AND RAINWATER HARVESTING
- APPENDIX 2.1 SCOPING REQUEST
- APPENDIX 2.2 SCOPING OPINION
- APPENDIX 6.1 FLOOD RISK ASSESSMENT_PART1
- APPENDIX 6.1 FLOOD RISK ASSESSMENT_PART2
- APPENDIX 6.2 DRAINAGE STRATEGY REPORT
- APPENDIX 7.1 ASSESSMENT METHODOLOGY
- APPENDIX 7.2 ZTV STUDIES AND VISUALISATIONS METHODOLOGY
- APPENDIX 7.3 STUDY AREA AND VIEWPOINT AGREEMENT CORRESP WITH SCDC
- APPENDIX 7.4 NATIONAL AND LOCAL POLICY
- APPENDIX 7.5 EXTRACTS FROM KEY LOCAL GUIDANCE DOCUMENTS AND LCAS
- APPENDIX 7.6 ARBORICULTURAL SURVEY
- APPENDIX 7.7 LANDSCAPE VALUE ASSESSMENT
- APPENDIX 8.1 NOISE AND VIBRATION POLICY AND GUIDANCE
- PROPOSED SITEWIDE APPLICATION BOUNDARY PLAN
- BUILDING A BASEMENT LEVEL 2
- BUILDING A FIFTH FLOOR PLAN
- BUILDING A FIRST FLOOR PLAN
- BUILDING A FIRST FLOOR
- BUILDING A FOURTH FLOOR PLAN
- BUILDING A GROUND FLOOR PLAN
- BUILDING A NORTH EAST TERRACE
- BUILDING A NORTH WEST COLLONADE
- BUILDING A NORTH WEST ELEVATION
- BUILDING A ROOF PLAN
- BUILDING A SW AND NE ELEVATIONS
- BUILDING A SECOND FLOOR PLAN
- BUILDING A SECTIONS
- BUILDING A SOUTH EAST ELEVATION
- BUILDING A THIRD FLOOR PLAN
- BUILDING B BASEMENT PLAN
- BUILDING B EAST ELEVATION
- BUILDING B FIFTH FLOOR PLAN
- BUILDING B FIRST FLOOR PLAN
- BUILDING B FOURTH FLOOR PLAN
- BUILDING B GROUND FLOOR PLAN
- BUILDING B NORTH BAY STUDY
- BUILDING B NORTH ELEVATION
- BUILDING B BASEMENT PLAN
- BUILDING B SECOND FLOOR PLAN
- BUILDING B SECTION AA
- BUILDING B SECTION BB
- BUILDING B SOUTH EAST BAY STUDY
- BUILDING B SOUTH EAST ELEVATION
- BUILDING B SOUTH ELEVATION
- BUILDING B SOUTH WEST ELEVATION
- BUILDING B THIRD FLOOR PLAN
- BUILDING B WEST ELEVATION
- BUILDING C BASEMENT
- BUILDING C FIFTH FLOOR
- BUILDING C FOURTH FLOOR
- BUILDING C GROUND FLOOR
- BUILDING C NE AND NW ELEVATIONS-02200
- BUILDING C ROOF PLAN
- BUILDING C SECOND FLOOR
- BUILDING C SECTIONS
- BUILDING C SIXTH FLOOR
- BUILDING C SOUTH EAST COLLONADE AND RECEPTION
- BUILDING C SW AND SE ELEVATIONS
- BUILDING C SW COLLONADE AND TERRACE
- BUILDING C THIRD FLOOR
- BUILDING D BASEMENT PLAN
- BUILDING D FIFTH FLOOR PLAN
- BUILDING D FIRST FLOOR PLAN
- BUILDING D FOURTH FLOOR PLAN
- BUILDING D GROUND FLOOR PLAN
- BUILDING D NORTH EAST ELEVATION
- BUILDING D NW AND SE ELEVATIONS
- BUILDING D ROOF PLAN
- BUILDING D SECOND FLOOR PLAN
- BUILDING D SOUTH EAST TERRACE
- BUILDING D SOUTH SECTIONS
- BUILDING D SOUTH WEST COLLONADE
- BUILDING D SW ELEVATION
- BUILDING D SECOND FLOOR PLAN
- DESIGN AND ACCESS SECTION 11 PROPOSAL SUMMARY
- DESIGN AND ACCESS SECTION 12 APPENDIX
- DEMOLITION AND CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
- ECOLOGY - BIODIVERSITY NET GAIN PLAN
- ECOLOGY - WATER VOLE SURVEY
- ENVIRONMENTAL STATEMENT VOLUME 1 - MAIN DOCUMENT
- ENVIRONMENTAL STATEMENT VOLUME 3 - NON-TECHNICAL SUMMARY
- FIGURE 7_1_AERIAL
- FIGURE_7_2_POLICY_CONTEXT
- FIGURE_7_3_TOPOGRAPHY
- FIGURE_7_4_ZTV_ZVI_VIEWPOINTS
- FIGURE_7_5_LOCAL_LANDSCAPE_CHARACTER
- FIGURE_7_6_ACCESS
- PUBLIC ART DELIVERY PLAN
- WIND MICROCLIMATE REPORT
- DEMOLITION PLAN
- ELEVATIONS NE AND NW
- ELEVATIONS NE AND SW
- ELEVATIONS NW AND SE
- ELEVATIONS SE AND SW
- EXISTING BUILDINGS 210 ELEVATIONS
- EXISTING BUILDINGS 210-211 FIRST FLOOR PLAN
- EXISTING BUILDINGS 210-211 GROUND FLOOR PLAN
- EXISTING BUILDINGS 210-211 ROOF PLAN
- EXISTING BUILDINGS 210-211 SECTIONS
- EXISTING BUILDINGS 211 COURTYARD ELEVATIONS
- EXISTING BUILDINGS 211 ELEVATIONS
- EXISTING SITE WIDE PLAN
- INDICATIVE PHASING PLAN PHASE 1 (1OF3)
- INDICATIVE PHASING PLAN PHASE 1 (2OF3)
- INDICATIVE PHASING PLAN PHASE 1 (3OF3)
- INDICATIVE PHASING PLAN PHASE 2 (1OF3)
- INDICATIVE PHASING PLAN PHASE 2 (2OF3)
- INDICATIVE PHASING PLAN PHASE 2 (3OF3)
- LOCATION PLAN
- PROPOSED SITE WIDE BASEMENT LEVEL 1 PLAN
- PROPOSED SITE WIDE BASEMENT LEVEL 2 PLAN
- PROPOSED SITE WIDE FIFTH FLOOR PLAN
- PROPOSED SITE WIDE FIRST FLOOR PLAN
- PROPOSED SITE WIDE FOURTH FLOOR PLAN
- PROPOSED SITE WIDE GROUND FLOOR PLAN
- PROPOSED SITE WIDE SECOND FLOOR PLAN
- PROPOSED SITE WIDE SIXTH FLOOR PLAN
- PROPOSED SITE WIDE THIRD FLOOR PLAN
- PROPOSED SITE WIDE TOP ROOF PLAN
- SECTIONS SITE WIDE
- SITE WIDE INDICATIVE PHASING PLAN PHASE 1 1OF 2
- SITE WIDE INDICATIVE PHASING PLAN PHASE 1 2 OF 2
- PARISH
- CLIMATE, WASTE & ENVIRONMENT
- DEVELOPMENT OFFICER - HEALTH COMMENTS
- ARCHAEOLOGY
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- WASTE - SHARED SERVICE
- SITE NOTICE
- HSE
- HEALTH IMPACT ASSESSMENT
- LANDSCAPE STATEMENT CHAPTER 1
- LANDSCAPE STATEMENT CHAPTER 2
- LANDSCAPE STATEMENT CHAPTER 4
- LANDSCAPE STATEMENT CHAPTER 5
- LANDSCAPE STATEMENT CHAPTER 6
- LANDSCAPE STATEMENT CHAPTER 7
- LANDSCAPE STATEMENT CHAPTER 3
- TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENT PART 1
- TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENT PART 2
- APPLICATION FORM - NO PERSONAL INFO
- ATTACHMENT SUMMARY FROM PORTAL
- STATEMENT OF COMMUNITY INVOLVEMENT
- COVER LETTER
- CIRCULAR ECONOMY STATEMENT
- SUSTAINABILITY STATEMENT PART 1
- SUSTAINABILITY STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- DESIGN AND ACCESS STATEMENT PART 5
- DESIGN AND ACCESS STATEMENT PART 6
- DESIGN AND ACCESS STATEMENT PART 7
- DESIGN AND ACCESS STATEMENT PART 8
- DESIGN AND ACCESS STATEMENT PART 9
- DESIGN AND ACCESS STATEMENT PART 10
- FEE CALCULATION
- FIRE STATEMENT
- LIGHTING DESIGN
- BIODIVERSITY NET GAIN PLAN
- ECOLOGICAL IMPACT ASSESSMENT
- LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN
- NOCTURNAL BAT SURVEYS
- PLANNING STATEMENT PART 1
- PLANNING STATEMENT PART 2
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- AIR QUALITY ASSESSMENT
- UTILITIES ASSESSMENT
- VENTILATION STATEMENT
- PROPOSED GROUND LEVEL LANDSCAPE GA
- PROPOSED ROOF LEVEL LANDSCAPE GA
- PROPOSED GROUND FLOOR HARD WORKS PLAN
- PROPOSED GROUND FLOOR SOFT WORKS PLAN
- PROPOSED GROUND FLOOR FURNITURE PLAN
- PROPOSED GROUND FLOOR LEVELS PLAN
- PROPOSED GROUND FLOOR TREES PLAN
- DRAWING ISSUE SHEET
- EXISTING BUILDING 214 GF PLAN
- EXISTING BUILDING 214 FF PLAN
- EXISTING BUILDING 214 ROOF PLAN
- EXISTING BUILDING 214 ELEVATIONS
- EXISTING BUILDING 214 SECTIONS
- EXISTING BUILDING 216 SF PLAN
- EXISTING BUILDING 230 GF PLAN
- EXISTING BUILDING 230 SECTIONS
- EXISTING BUILDING 240 FF PLAN
- EXISTING BUILDING 240 ROOF PLAN
- EXISTING BUILDING 240 SECTIONS
- EXISTING BUILDING 216 GF PLAN
- EXISTING BUILDING 216 FF PLAN
- EXISTING BUILDING 216 ROOF PLAN
- EXISTING BUILDING 216 ELEVATIONS
- EXISTING BUILDING 216 SECTIONS
- EXISTING BUILDING 220 GF PLAN
- EXISTING BUILDING 220 FF PLAN
- EXISTING BUILDING 220 SF PLAN
- EXISTING BUILDING 220 ROOF PLAN
- EXISTING BUILDING 220 ELEVATIONS
- EXISTING BUILDING 220 SECTIONS
- EXISTING BUILDING 230 FF PLAN
- EXISTING BUILDING 230 ROOF PLAN
- EXISTING BUILDING 230 ELEVATIONS
- EXISTING BUILDING 240 GF PLAN
- EXISTING BUILDING 240 ELEVATIONS
- EXISTING SITE WIDE GROUND FLOOR PLAN
- EXISTING SITE WIDE FIRST FLOOR PLAN
- EXISTING SITE WIDE SECOND FLOOR PLAN
- EXISTING SITE WIDE ROOF PLAN
- PROPOSED SITE WIDE TOP ROOF PLAN
- LOCATION PLAN
- EXISTING SITE WIDE NE AND NW ELEVATIONS
- EXISTING SITE WIDE SE AND SW ELEVATIONS
- EXISTING SITE WIDE SECTIONS
- OUTLINE DEMOLITION AND CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- HERITAGE STATEMENT
- EMPLOYMENT AND SKILLS STRATEGY
- BIODIVERSITY NET GAIN CALCULATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided full applications in a median of 143 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
270 Cambridge Science Park Milton Cambridge South Cambridgeshire CB4 0WE
Certificate of lawfulness under Section 192 for the installation of solar PV panels
Granted Lawful development 11 docs -
270 Cambridge Science Park Milton Cambridge South Cambridgeshire CB4 0WE
Non material amendment of planning permission 20/03590/FUL (Minor refurbishment works) for 4 additional Electric Vehicle Charging Points and External seating area to the front of the building
Granted Amendments 8 docs -
270 Cambridge Science Park Milton Cambridge South Cambridgeshire CB4 0WE
Minor refurbishment works
Granted Full applications 27 docs -
270 Cambridge Science Park Milton Cambridgeshire CB4 0WE
Installation of 8 No. condensing units to the plant deck roof level.
Granted Full applications 22 docs -
330 Cambridge Science Park Milton Cambridgeshire CB4 0WN
Installation of 156 No. roof mounted solar photovoltaic panels.
Granted Prior approval 24 docs -
280 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0WE
Certificate of lawfulness under S192 for inserting fire barriers behind the existing cladding.
Granted Lawful development 46 docs
Other full applications
In South Cambridgeshire
-
26/01269/FUL Granted
Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ
Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.
-
25/01014/FUL Granted
Land Off Low Fen Drove Way Horningsea Cambridgeshire
Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.
-
26/02714/FUL Granted
Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY
Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.
-
25/04556/FUL Refused
Land At Station Road Willingham Cambridgeshire
Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.
-
26/03702/FUL Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.