Skip to content
PlanIndex Get alerts
Menu

Planning application

Factory, Unit 1 Common Lane Sawston Cambridgeshire CB22 3HW

Granted South Cambridgeshire 24/04326/FUL Full Application

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of an existing building and the construction of new workshop.

As published by the council, reference 24/04326/FUL

Application record

Reference
24/04326/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
18 Nov 2024
Validated
18 Nov 2024
Decided
2 Apr 2025
Ward
Sawston
Parish
Sawston CP
Decision by
Delegated Decision
Postcode
CB22 3HW

Site history

Applications at this address on the South Cambridgeshire register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 24/04326/CONDA Split decision

    Factory, Unit 1 Common Lane Sawston Cambridgeshire CB22 3HW

    Submission of detail required by condition 3 (Contamination), 4 (Remediation), 6 (Arboricultural Method Statement and Tree Protection Strategy), 7 (scheme of ecology enhancement), 8 (lighting design strategy for biodiversity), 9 (Noise assessment - plant), 10 (Noise - plant details) and 12 (Visibility Splays) of planning permission 24/04326/FUL

    Decided 27 May 2026 Conditions

Timeline

Dates from the published record

  1. 18 Nov 2024

    Received by South Cambridgeshire

  2. 2 Apr 2025

    Decision issued: Granted Permission

  3. 12 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

BaroArch Design Lab Agent, a design practice registered in Cambridge

Active · incorporated 2020 · Cambridge

17 applications on PlanIndex · across 3 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

37 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 2 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Factory, Unit 1 Common Lane Sawston Cambridgeshire CB22 3HW

    24/04326/CONDA Submitted 13 Apr 2026 0m away

    Submission of detail required by condition 3 (Contamination), 4 (Remediation), 6 (Arboricultural Method Statement and Tree Protection Strategy), 7 (scheme of ecology enhancement), 8 (lighting design strategy for biodiversity), 9 (Noise assessment - plant), 10 (Noise - plant details) and 12 (Visibility Splays) of planning permission 24/04326/FUL

    Split decision Conditions Trees 31 docs
  • 18 Common Lane Sawston Cambridgeshire CB22 3HW

    24/03114/HFUL Submitted 19 Aug 2024 73m away

    Single storey front and rear extensions, rear roof light, garage to front with green roof, removal of porch canopy and alteration to fenestration

    Refused Householder Extension Loft or dormer +1 18 docs
    Small domestic
  • 96 High Street Sawston Cambridgeshire CB22 3HJ

    24/04239/FUL Submitted 12 Nov 2024 106m away

    Retrospective erection of a temporary sail cloth.

    Granted Full applications 25 docs
  • 96 High Street Sawston Cambridgeshire CB22 3HJ

    24/04240/LBC Submitted 12 Nov 2024 106m away

    Retrospective erection of a temporary sail cloth.

    Granted Heritage and listed buildings 21 docs
  • 94 High Street Sawston Cambridgeshire CB22 3HJ

    24/03666/FUL Submitted 30 Sep 2024 112m away

    Change of use and conversion of hair salon to residential unit.

    Withdrawn Full applications 17 docs
  • Trees In Car Park Behind 76 And 79 And Besides 80 High Street Sawston CB22 3HJ

    21/0031/TTCA Submitted 8 Jan 2021 122m away

    Group of 4 sycamore trees - Fell Trees are growing very close to the corner of a commercial property and drainage system. They are over hanging two commercial properties car parks and the roots are lifting the car park surface

    Granted Trees 5 docs

In South Cambridgeshire

  • 26/03456/FUL Awaiting decision

    Wimpole Park, Wimpole Hall Wimpole Park Road Wimpole Cambridgeshire SG8 0BW

    Temporary installation of a selection of vintage fairground rides, catering concessions, lights installations, and temporary staff welfare units on site for the Christmas at Wimpole lights trail from 20th November 2026 to 15th January 2027 (not including 25 December 2026). Also including one marquee type structure in concession area.

    10 Sep 2026 Full applications
  • 26/02708/FUL Granted

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 26/02452/FUL Withdrawn

    Land West Of 82 Earith Road Willingham Cambridgeshire

    Erection of a permeable hard standing area and fence to the front of the site associated with the enjoyment of orchard use.

    29 Jun 2026 Full applications
  • 26/02618/FUL Granted

    Land To The North Of New Farm Road New Farm Road Newton Cambridgeshire

    Change of use from agricultural land to grazing land for the keeping of horses, with associated access, mobile field shelter, and fencing.

    10 Jul 2026 Full applications
  • 26/03410/FUL Awaiting decision

    Building B Granta Park Great Abington Cambridgeshire CB21 6GP

    Erection of a temporary indoor padel tennis centre comprising 6 covered courts and a coaching court with reception and ancillary cafe, together with changing accommodation, parking, cycle parking, landscaping, drainage works and associated infrastructure (meanwhile use).

    7 Sep 2026 Full applications