Planning application
10 Cambridge Avenue Solihull B91 1QE
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing dwelling to create a two storey replacement, accessible dwelling.
As published by the council, reference PL/2026/01424/PPFL
Application record
- Reference
- PL/2026/01424/PPFL
- Status
- Awaiting decision
- Received
- 30 Jul 2026
- Validated
- 21 Sep 2026
- Ward
- Shirley East & Sharmans Cross
- Parish
- Non-Civil Parish Or Community
- Postcode
- B91 1QE
Timeline
Dates from the published record
-
30 Jul 2026
Received by Solihull
-
21 Sep 2026
Validated
Checked as complete and ready for consideration.
-
9 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Solihull took a median of 72 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
MADE Architecture Limited Agent, an architecture practice registered in Solihull
Active · incorporated 2010 · Solihull
51 applications on PlanIndex · across 8 councils · 79% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
- BAT SURVEY
- APPLICATIONFORMREDACTED
- LOCATION PLAN
- PROPOSED SITE PLAN
- EXISTING PLANS
- EXISTING ELEVATIONS
- PROPOSED PLANS GROUND FLOOR
- PROPOSED PLANS FIRST FLOOR
- PROPOSED ROOF PLAN
- PROPOSED FRONT AND REAR ELEVATIONS
- PROPOSED SIDE ELEVATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Solihull for determination, against a statutory target of eight weeks. Over the last year Solihull's median decision took 72 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Solihull's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
36 Cambridge Avenue Solihull B91 1QE
93% historically approved · decision due ~15 Sep
Single storey rear, two storey side and rear extensions, loft conversion, fenestration changes and internal alterations.
Awaiting decision Householder Extension Loft or dormer +1 7 docsSmall domestic -
4 Cambridge Avenue Solihull B91 1QE
Ground floor rear/side extension.
Granted Householder Extension 7 docsDomestic -
Land On The West Side Of Alderbrook Road Solihull
Application to vary condition 1 (Drawings) of planning approval PL/2024/02738/VAR - Application to vary condition 1 (Drawings) following planning approval PL/2024/01318/PPFL dated 18.10.2024 for 5 bedroom detached house including basement with connected double garage including first floor balcony. Namely: Dormer windows to front and rear - Approved on 20.12.24. In this application namely changes to roof design and changes/additions to side, rear and front elevations details.
Granted Amendments New dwelling Loft or dormer +1 8 docs -
78B Alderbrook Road Solihull B91 1NR
Reduce alder tree (T1) by approximately 1/3 to increase stability due to a cavity in the base. Fell conifer tree (T2) due to a split at the co-dominant stem and uprooting.
Withdrawn Trees 9 docs -
78 Alderbrook Road Solihull B91 1NR
Amendments to planning permission dated (14.03.2025) reference (PL/2024/02979/MINFHO) for: (Single storey porch and single storey rear extension, first floor extension above existing garage, loft conversion with new rear dormers, and material and fenestration alterations.). Namely : (removal of the approved rear dormer structures and the omission of front and rear roof lights)
Granted Amendments Extension Loft or dormer +1 18 docsSmall domestic -
Land On The West Side Of Alderbrook Road Solihull
Discharge condition Nos. 3 (Materials), 5 (Obscure windows), 9 (Construction Management plan) and 13 (Tree protection measures) following planning approval PL/2022/00764/PPFL dated 11.04.2023 for 5 bedroom detached house including basement with connected double garage.
Granted Conditions New dwelling Windows or glazing +1 6 docs