Proposal
Outline planning permission (all matters reserved except for site accesses) for employment development (Use Classes E(g)(iii), B2 and B8) with ancillary offices and associated earthworks, infrastructure, open space, landscaping and drainage.
As published by the council, reference PL/2026/01046/PPOL
Application record
- Reference
- PL/2026/01046/PPOL
- Type
- Major Outline Other
- Status
- Awaiting decision
- Received
- 1 Jun 2026
- Validated
- 1 Jun 2026
- Ward
- Dorridge & Hockley Heath
- Parish
- Hockley Heath Parish Council
Timeline
Dates from the published record
-
1 Jun 2026
Received by Solihull
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 31 August 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Solihull took a median of 70 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
219 documents on file for this application
- LANDSCAPE COMMENTS
- AIR QUALITY COMMENTS
- AIR QUALITY COMMENTS
- HERITAGE COMMENTS
- KNOWLE, DORRIDGE AND BENTLEY HEATH FORUM ADDITIONAL COMMENTS
- HOCKLEY HEATH PARISH COUNCIL COMMENTS
- NATIONAL HIGHWAYS
- REPRESENTATION - NATURAL ENGLAND
- PUBLIC PROTECTION COMMENTS
- TECHNICAL NOTE - ASSESSMENT OF DEVELOPMENT IMPACTS ON MONKSPATH WOOD
- SMBC - CONTAMINATED LAND
- NATURAL ENGLAND COMMENTS
- TFWM COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- SMBC - URBAN DESIGN
- KNOWLE, DORRIDGE AND BENTLEY HEATH FORUM COMMENTS
- SMBC - DRAINAGE & LLFA
- WEST MIDLAND POLICE
- WEST MIDLAND FIRE SERVICE COMMENTS
- APPLICATION FORM REDACTED
- LOCATION PLAN
- PLANNING STATEMENT
- LAND USE AND BUILDING HEIGHTS PARAMETER PLAN
- APPLICATION FORM
- COVERING LETTER
- ALTERNATIVE SITE ASSESSMENT
- PLANNING STATEMENT
- DESIGN & ACCESS STATEMENT COMPRESSED
- DESIGN & ACCESS STATEMENT
- A3400 STRATFORD ROAD GHOST ISLAND JUNCTION
- KINETON LANE SIMPLE PRIORITY JUNCTION
- KINETON LANE EASTERN GHOST ISLAND JUNCTION
- KINETON LANE/A3400 STRATFORD ROAD ACTIVE TRAVEL IMPROVEMENTS
- A3400 STRATFORD ROAD GHOST ISLAND JUNCTION
- KINETON LANE ACTIVE TRAVEL IMPROVEMENTS
- INDICATIVE PROPOSED EARTHWORKS & LEVELS (NORTH)
- ILLUSTRATIVE MASTER PLAN
- LAND USE AND BUILDING HEIGHTS PARAMETER PLAN
- INDICATIVE LANDSCAPE FRAMEWORK
- INDICATIVE EARTHWORKS
- LOCATION PLAN
- APPLICATION BOUNDARY
- OFF-SITE SECONDARY LANDSCAPE MITIGATION
- INDICATIVE GREEN INFRASTRUCTURE STRATEGY LR
- INDICATIVE GREEN INFRASTRUCTURE STRATEGY
- AGRICULTURAL: AIR QUALITY
- AGRICULTURAL: ECOLOGY NOTE
- AGRICULTURAL: SOLIHULL AGRICULTURAL MODELLING
- ALC: AGRICULTURAL LAND CLASSIFICATIONS & LAND USE
- BENEFITS: INDURENT PARK ECONOMIC BENEFITS AND SOCIAL VALUE STATEMENT
- BNG: COPY OF APPENDIX F_BNG REPORT INDURENT PARK SOLIHULL RLB BNG METRIC
- BNG: INDURENT PARK SOLIHULL BNG REPORT OUTLINE SUBMITTED
- BREEAM: PRE-ASSESSMENT
- NEEDS: ASSESSMENT
- SCI: INDURENT SOLIHULL - SCI - 2 DECEMBER 2025
- SUSTAINABILITY: STATEMENT
- UTILITIES: OUTLINE UTILITY STATEMENT
- TRANSPORT: TRANSPORT ASSESSMENT - PART 1
- TRANSPORT: TRANSPORT ASSESSMENT - PART 2
- TRANSPORT: TRANSPORT ASSESSMENT - PART 3
- TRANSPORT: TRANSPORT ASSESSMENT - PART 4
- TRANSPORT: TRANSPORT ASSESSMENT - PART 5
- TRANSPORT: TRANSPORT ASSESSMENT - PART 6
- TRANSPORT: FRAMEWORK TRAVEL PLAN - PART 1
- TRANSPORT: FRAMEWORK TRAVEL PLAN - PART 2
- LIGHTING: INDURENT PARK LIGHTING HIERARCHY PLAN
- LIGHTING: INDURENT PARK - PART.1 REV01 19.12.2025 HI RES
- LIGHTING: INDURENT PARK - PART.1 REV01 19.12.2025 LOW RES COMPRESSED
- LIGHTING: INDURENT PARK - PART.2 REV02 19.12.2025 HI RES
- LIGHTING: INDURENT PARK - PART.2 REV02 19.12.2025 LOW RES COMPRESSED
- GI: 04840-GE-RPT-OUT-026-V3 GEO-ENVIRONMENTAL DESK STUDY-COMPILED
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX A
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX B_1
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX B_2
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX C_1
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX C_2
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX C_3
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX D
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX E_1
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX E_2
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX E_3
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX F
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX G
- GI: 04840-GE-RPT-OUT-026-V3-APPENDIX H, I, J
- GI: 04840-GE-RPT-OUT-026-V3-MAIN BODY DS
- FLOOD RISK ASSESSMENT (FRA): 04840-FRA-001-P4_PART1 INDURENT PARK SOLIHULL
- FLOOD RISK ASSESSMENT (FRA): 04840-FRA-001-P4_PART2 INDURENT PARK SOLIHULL
- FLOOD RISK ASSESSMENT (FRA): 04840-FRA-001-P4_PART3 INDURENT PARK SOLIHULL
- FLOOD RISK ASSESSMENT (FRA): 04840-FRA-001-P4_PART4 INDURENT PARK SOLIHULL
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-1
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-2
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-3
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-4
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-1
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-2
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-3
- ARB: FLAC 41-1024 PLANNING SUBMISSION (ARBORICULTURE)_210426_COMPRESSED-4
- 02601 ES V1 CHAPTER 1 INTRODUCTION
- 02601 ES V1 CHAPTER 2 APPROACH TO EIA
- 02601 ES V1 CHAPTER 3 SITE CONTEXT
- 02601 ES V1 CHAPTER 4 DEVELOPMENT SPECIFICATION
- 02601 ES V1 CHAPTER 5 CONSIDERATION OF ALTERNATIVES
- 02601 ES V1 CHAPTER 6 SOCIOECONOMICS AND HUMAN HEALTH
- 02601 ES V1 CHAPTER 7 TRANSPORT AND ACCESS
- 02601 ES V1 CHAPTER 8 NOISE AND VIBRATION
- 02601 ES V1 CHAPTER 9 FLOOD RISK AND HYDROLOGY
- 02601 ES V1 CHAPTER 10 BIODIVERSITY
- 02601 ES V1 CHAPTER 11 ARCHAEOLOGY AND BUILT HERITAGE
- 02601 ES V1 CHAPTER 12 LANDSCAPE AND VISUAL
- 02601 ES V1 CHAPTER 13 CLIMATE CHANGE
- 02601 ES V1 CHAPTER 14 ASSESSMENT OF CUMULATIVE EFFECTS
- 02601 ES V1 CHAPTER 15 SUMMARY
- 02601 ES V1 FIGURE 1.1 SITE LOCATION PLAN
- 02601 ES V1 FIGURE 4.1 LAND USE AND BUILDING HEIGHTS PARAMETER PLAN
- 02601 ES V1 FIGURE 7.1 TRANSPORT AND ACCESS ES CHAPTER STUDY AREA
- 02601 ES V1 FIGURE 7.2 TRANSPORT AND ACCESS ES CHAPTER HIGHWAY LINKS AND SENSITI
- 02601 ES V1 FIGURE 8.1 BASELINE NOISE SURVEY MEASUREMENT LOCATIONS AND ASSESSED
- 02601 ES V1 FIGURE 8.2 ASSESSED ROADS
- 02601 ES V1 FIGURE 8.3 ASSESSED LAYOUT 1
- 02601 ES V1 FIGURE 8.4 ASSESSED LAYOUT 2
- 02601 ES V1 FIGURE 9.1 HYDROLOGICAL REGIME
- 02601 ES V1 FIGURE 8.3 ASSESSED LAYOUT 1
- 02601 ES V1 FIGURE 9.2 FLOOD MAP FOR PLANNING
- 02601 ES V1 FIGURE 9.3 SURFACE WATER FLOOD RISK
- 02601 ES V1 FIGURE 11.1 DESIGNATED HERITAGE ASSETS
- 02601 ES V1 FIGURE 11.2 HER MONUMENTS
- 02601 ES V1 FIGURE 11.3 LOCATION OF SENSITIVE RECEPTORS
- 02601 ES V1 FIGURE 11.4 LOCATION OF GEOPHYSICAL SURVEY RESULTS
- 02601 ES V1 FIGURE 12.1 INDICATIVE LANDSCAPE FRAMEWORK
- 02601 ES V1 FIGURE 12.2 OFF-SITE SECONDARY LANDSCAPE MITIGATION
- 02601 ES V1 FIGURE 13.1 ESTIMATED ANNUAL OPERATIONAL TRANSPORT EMISSIONS (TONNES
- 02601 ES V1 FIGURE 14.1 CUMULATIVE PROJECT PLAN
- 02601 ES V2 APPENDIX 1.1 REG 18 REQUIRED INFORMATION
- 02601 ES V2 APPENDIX 1.2 STATEMENT OF TECHNICAL COMPETENCE
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 1 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 2 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 3 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 4 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 5 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 6 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 7 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 8 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 9 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 10 OF 11
- 02601 ES V2 APPENDIX 2.1 EIA SCOPING REPORT_PART 11 OF 11
- 02601 ES V3 ENVIRONMENTAL MANAGEMENT PLAN
- 02601_ES_V4_NON-TECHNICAL SUMMARY
- 02601_ES_V1_FIGURE 6.1 IMPACT AREAS
- 02601 ES V2 APPENDIX 2.2 SCOPING OPINION AND CONSULTEE COMMENTS
- 02601 ES V2 APPENDIX 2.3 CONSULTEE COMMENTS RESPONSE SCHEDULE
- 02601 ES V2 APPENDIX 8.1 GLOSSARY
- 02601 ES V2 APPENDIX 8.2 LEGISLATION, POLICY AND GUIDANCE
- 02601 ES V2 APPENDIX 8.3 BASELINE NOISE SURVEY
- 02601 ES V2 APPENDIX 8.4 CALCULATION METHODOLOGY AND RESULTS
- 02601 ES V2 APPENDIX 9.1 INFILTRATION TESTING
- 02601 ES V2 APPENDIX 10.1 ECIA_PART 1 OF 3
- 02601 ES V2 APPENDIX 10.1 ECIA_PART 2 OF 3
- 02601 ES V2 APPENDIX 10.1 ECIA_PART 3 OF 3
- 02601 ES V2 APPENDIX 10.3 BREEDING BIRD REPORT
- 02601 ES V2 APPENDIX 10.4 AIR QUALITY MODELLING FOR ECOLOGY ASSESSMENT INCLUDING
- 02601 ES V2 APPENDIX 11.1 HERITAGE ASSESSMENT
- 02601 ES V2 APPENDIX 11.2 GEOPHYSICAL SURVEY REPORT_PART 1 OF 3
- 02601 ES V2 APPENDIX 11.2 GEOPHYSICAL SURVEY REPORT_PART 2 OF 3
- 02601 ES V2 APPENDIX 11.2 GEOPHYSICAL SURVEY REPORT_PART 3 OF 3
- 02601 ES V2 APPENDIX 12.1 LVIA METHODOLOGY
- 02601 ES V2 APPENDIX 12.2 LVIA BASELINE ANALYSIS AND SUPPORTING FIGURES
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 1 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 2 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 3 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 4 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 5 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 6 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 7 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 8 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 9 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 10 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 11 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 12 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 13 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 14 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 15 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 16 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 17 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 18 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 19 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 20 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 21 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 22 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 23 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 24 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 25 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 26 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 27 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 28 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 29 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 30 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 31 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 32 OF 33
- 02601 ES V2 APPENDIX 12.3 LVIA VIEWPOINT PHOTOGRAPHY_PART 33 OF 33
- 02601 ES V2 APPENDIX 12.5 DETAILED ASSESSMENT
- 02601 ES V2 APPENDIX 12.6 LVIA CHARACTER GUIDANCE
- 02601 ES V2 APPENDIX 12.7 LVIA ENVIRONMENTAL COLOUR ASSESSMENT
- 02601 INDURENT PARK SOLIHULL ES V1 CONTENTS PAGE
- 02601 INDURENT PARK SOLIHULL ES V2 CONTENTS PAGE
- 02601_ES_V1_FIGURE 6.1 IMPACT AREAS
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 1 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 2 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 3 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 4 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 5 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 6 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 7 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 8 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 9 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 10 OF 11
- APPENDIX 12.4_LVIA_VERIFIED_VIEW_PHOTOMONTAGES_PART 11 OF 11
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Solihull for determination, against a statutory target of thirteen weeks. Over the last year Solihull decided outline applications in a median of 226 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Telecommunications Mast 1493135 Stratford Road Hockley Heath Solihull
Prior notification for a 30m telecommunication lattice mast.
Granted Prior approval 15 docs -
Blythe Valley Park Blythe Gate Shirley Solihull
Discharge Condition No.3 (Travel Plan) following planning approval PL/2019/01252/PPRM.
Granted Conditions 3 docs -
The Hub Central Boulevard Blythe Valley Park Blythe Gate Shirley Solihull
Amendments to planning permission dated 27.09.2019 (PL/2019/01252/PPRM) for: Erection of a new office building (Use Class B1), and technical centre (Use Class B2) with associated internal access road, vehicle calibration track, car parking, cycle storage, substations, landscaping and all other details required by Condition 3 relating to the reserved matters of layout, scale, appearance and landscaping pursuant to planning permission reference PL/2016/00863/MAOOT. Namely: Non material amendment for the addition of roof top stacks to the technical centre and associated development.
Granted Amendments 6 docs -
The Hub Central Boulevard Shirley Solihull B90 8BG
Amendments to planning permission dated 27.09.2019 (PL/2019/01252/PPRM) for: Erection of a new office building (Use Class B1), and technical centre (Use Class B2) with associated internal access road, vehicle calibration track, car parking, cycle storage, substations, landscaping and all other details required by Condition 3 relating to the reserved matters of layout, scale, appearance and landscaping pursuant to planning permission reference PL/2016/00863/MAOOT. Namely: non material amendment to amend condition 1 (Approved plans) and condition 2 (External elevations) to approve further details of water test building and magnetics test building.
Granted Amendments 10 docs -
Blythe Valley Park Blythe Gate Shirley Solihull
Advertisement consent for the erection of 3 No. wayfinding totems at Plot A3, Blythe Valley Park, Solihull.
Granted Advertising 11 docs
Other outline applications
In Solihull
-
PL/2026/01579/PIP Awaiting decision
Land Off Birchy Leasowes Lane Tidbury Green Solihull B90 1PU
Permission in principle for the erection of 2 No. dwellings with associated external works.
-
PL/2026/01543/PPOL Awaiting decision
11 Broadfern Road Knowle Solihull B93 9DE
Outline planning application for new dwelling in rear garden.
-
PL/2026/01438/PIP Awaiting decision
116 Lady Byron Lane Knowle Solihull B93 9BA
Permission in principle for the erection of 2 No. dwellings.
-
PL/2026/00576/PIP Refused
Land East Of Knowle Road Barston Solihull B92 0JL
Permission in principle for the demolition of existing buildings and redevelopment for up to five residential dwellings.
-
PL/2026/00476/PIP Refused
Land Off Knowle Road Eastcote Solihull B92 0JA
Permission in principle for the erection of up to 2 No. dwellings.