Skip to content
PlanIndex Get alerts
Menu

Planning application

Hob Farm Hob Lane Burton Green Solihull CV8 1QA

Awaiting decision Solihull PL/2026/00841/PPFL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use and conversion of a detached domestic garage to dwelling.

As published by the council, reference PL/2026/00841/PPFL

Application record

Reference
PL/2026/00841/PPFL
Status
Awaiting decision
Received
30 Apr 2026
Validated
5 Jun 2026
Ward
Balsall & Berkswell
Parish
Berkswell Parish Council
Postcode
CV8 1QA

Timeline

Dates from the published record

  1. 30 Apr 2026

    Received by Solihull

  2. 5 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 31 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Solihull took a median of 77 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • SMBC - HIGHWAYS Consultee Comment · 12 Aug 2026
  • SMBC - DRAINAGE & LLFA Consultee Comment · 03 Jul 2026
  • SMBC - HIGHWAYS Consultee Comment · 01 Jul 2026
  • EXISTING LAND SURVEY Drawing · 05 Jun 2026
  • PROPOSED LAYOUT Drawing · 05 Jun 2026
  • EXISTING ELEVATION, PROPOSED FLOOR PLANS AND PROPOSED SECTION Drawing · 19 May 2026
  • PROPOSED ELEVATIONS Drawing · 19 May 2026
  • EXISTING ELEVATIONS AND FLOOR PLANS Drawing · 19 May 2026
  • APPLICATION FORM REDACTED Application Form · 30 Apr 2026
  • LOCATION PLAN Drawing · 30 Apr 2026
  • PLANNING STATEMENT Report · 30 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Solihull for determination, against a statutory target of eight weeks. Over the last year Solihull's median decision took 77 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Solihull's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Lottery Cottage Hob Lane Burton Green Solihull CV8 1QA

    PL/2026/01497/DIS Submitted 12 Aug 2026 0m away

    Discharge of condition number 3 (Materials) following planning approval PL/2026/00166/MINFHO dated 24.3.2026

    Granted 3 docs
  • Stable View Beanit Farm Livery Hob Lane Burton Green Solihull CV7 7GX

    PL/2022/01410/MINFHO Submitted 30 Jun 2022 221m away

    Change of use of part of existing barn to proposed first floor atop existing flat, including new bedroom and bathroom.

    Granted Full applications 9 docs
  • Beanit Farm House Beanit Farm Hob Lane Burton Green Solihull CV7 7GX

    PL/2022/02310/PPFL Submitted 31 Oct 2022 325m away

    Erection of a domestic replacement curtilage building.

    Granted Full applications 14 docs
  • Pheasant Oak Farm Hob Lane Burton Green Solihull CV7 7GX

    PL/2022/02626/EIASCR Submitted 14 Dec 2022 472m away

    Environmental Impact Assessment Screening Opinion for the demolition of existing buildings and structures and outline planning permission with all matters reserved, except for access, for the development of the site for up to 270 residential dwellings (use class C3) and associated infrastructure, landscaping, new public realm and open space.

    Decided Outline Demolition 2 docs
  • Pheasants Oak Farm Hob Lane Burton Green Solihull CV7 7GX

    PL/2026/01386/DIS Submitted 24 Jul 2026 472m away

    89% historically approved · decision due ~18 Sep

    Discharge of conditions 11 (Arboricultural Method Statement) and 14 (External Lighting) following planning approval PL/2023/02214/PPOL.

    Awaiting decision 6 docs
  • Pheasants Oak Farm Hob Lane Burton Green Solihull CV7 7GX

    PL/2026/01238/DIS Submitted 3 Jul 2026 472m away

    89% historically approved · decision due ~28 Aug

    Discharge of conditions 6 (Design Code), 8 (materials), 12 (Hard and Soft Landscaping), 14 (External Lighting), 15 (CEMP), 16 (LEMP), 17 (Habitat Connectivity) 19 (Open Space and Play Area) 27 (Construction Management Plan) and 30 (Amphibian Protection measures) following planning approval PL/2023/02214/PPOL.

    Awaiting decision 45 docs