Planning application
Land At Ryton End Barston Solihull
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of self-build dwelling with associated parking, turning and amenity space.
As published by the council, reference PL/2026/00763/PPFL
Application record
- Reference
- PL/2026/00763/PPFL
- Type
- Minor Full Dwellings
- Status
- Awaiting decision
- Received
- 21 Apr 2026
- Validated
- 21 Apr 2026
- Parish
- Barston Parish Council
Site history
Applications at this address on the Solihull register
This site has had 2 applications since 2023: 0 approved, 1 refused.
-
PL/2023/02142/PPFL Refused
Land At Ryton End Barston Solihull
New affordable self build residential unit.
Timeline
Dates from the published record
-
21 Apr 2026
Received by Solihull
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Solihull took a median of 77 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- SMBC - POLICY AND SPATIAL PLANNING
- SMBC - DRAINAGE & LLFA
- SMBC - HIGHWAYS
- SMBC - CONTAMINATED LAND
- APPLICATION FORM REDACTED
- LOCATION PLAN
- EXISTING BLOCK PLAN
- PROPOSED BLOCK PLAN
- PLANNING, DESIGN AND ACCESS STATEMENT
- TREE SURVEY SCHEDULE
- PROPOSED ELEVATIONS 1
- PROPOSED ELEVATIONS 2
- PROPOSED FLOOR PLANS
- TYPICAL SECTION
- FRONT VIEW 3D
- REAR VIEW 3D
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Solihull for determination, against a statutory target of eight weeks. Over the last year Solihull decided full applications in a median of 190 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At Ryton End Barston Solihull
New affordable self build residential unit.
Refused Full applications New dwelling 18 docs -
Land West Of Ryton End Barston Solihull B92 0LA
Temporary planning permission (30 years) for the construction and operation of a Battery Energy Storage System (15MW) and associated infrastructure.
Refused Full applications 53 docs -
Blythe House Farm Barston Lane Barston Solihull B92 0LD
Renewal of permission PL/2017/03354/PPFL to allow continued siting of agricultural workers' mobile home for a further 3 years.
Granted Full applications 12 docs
Other full applications
In Solihull
-
PL/2026/01559/PPFL Awaiting decision
The Royal Star And Garter Homes 26 Tudor Coppice Solihull B91 3DE
Construction of new glazed terrace screening to the first floor.
-
PL/2026/00348/PPFL Granted
Olton Reservoir Warwick Road Olton Solihull
Erect fence and entrance gates.
-
PL/2026/01529/PPFL Awaiting decision
Waterside Heights Waterside Dickens Heath Solihull B90 1UD
Cladding remediation and fire safety works comprising the replacement of combustible external materials with non-combustible alternatives, including replacement spandrel panels, balcony decking, timber cladding and façade coverings, together with associated external alterations retaining a similar appearance to the existing building.
-
PL/2025/01590/PPFL Refused
78 Prospect Lane Solihull B91 1HS
Erect new two storey dwelling.
-
PL/2026/01512/PPFL Awaiting decision
Lloyds Campus 157 Creynolds Lane Cheswick Green Solihull B90 4ES
Full planning permission for demolition of existing on-site buildings and development of 48 new residential dwellings (Use Class C3) and associated car and cycle parking, access infrastructure and network within the site, landscaping, public realm, drainage, utilities, energy and waste facilities and infrastructure.