Skip to content
PlanIndex Get alerts
Menu

Planning application

West Of Burton Green Adjacent To An Existing National Grid Substation (Berkswell)

Withdrawn Solihull PL/2026/00214/HS2DIS HS2 Section 17 (DIS)

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Schedule 17 Bringing into use - Paragraph 9(1): Scheduled Work Numbers: 2/184 and 2/185 Footpath M186 Accommodation overbridge and realignment of footpath and access track.

As published by the council, reference PL/2026/00214/HS2DIS

Application record

Reference
PL/2026/00214/HS2DIS
Type
HS2 Section 17 (DIS)
Status
Unknown
Decision
Withdrawn
Received
2 Feb 2026
Validated
2 Feb 2026
Decided
24 Jul 2026
Ward
Meriden & Arden
Parish
Berkswell Parish Council

Site history

Applications at this address on the Solihull register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • West Of Burton Green Adjacent To An Existing National Grid Substation (Berkswell).

    Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising a three span accommodation overbridge approximately 59.6m in length and 6.25m in width that crosses the HS2 rail line, Earthworks around the abutments of the overbridge to fully conceal the concrete pile caps and tie the overbridge into the cutting slopes, Minor earthworks at either end of the overbridge to tie into the existing landscape, Minor earthworks to facilitate the realignment of Footpath M186, farm access roads and to create a new V-shaped ditch which is approximately 30.65m in length, 750mm deep with a side slope gradient of 1.2, and four vehicle restraint systems VRS approximately 0.75m high.

    Decided 15 Oct 2024

Timeline

Dates from the published record

  1. 2 Feb 2026

    Received by Solihull

  2. 23 Jul 2026

    Added to PlanIndex

  3. 24 Jul 2026

    Decision issued: Withdrawn

Who's behind it

Company information only, from the register and Companies House

High Speed Two (HS2) Limited Applicant, registered in Birmingham

Active · incorporated 2009 · Birmingham

64 applications on PlanIndex · across 8 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • REVISED PLANS SCHEDULE Other · 26 May 2026
  • COVERING LETTER ADDITIONAL INFORMATION Correspondence · 26 May 2026
  • SMBC LANDSCAPE Consultee Comment · 06 Mar 2026
  • SMBC ECOLOGY Consultee Comment · 05 Mar 2026
  • SMBC - DRAINAGE & LLFA Consultee Comment · 23 Feb 2026
  • SMBC - PUBLIC PROTECTION Consultee Comment · 19 Feb 2026
  • SMBC - HERITAGE ASSETS Consultee Comment · 12 Feb 2026
  • SMBC HERITAGE ASSETS Consultee Comment · 09 Feb 2026
  • SMBC HIGHWAYS Consultee Comment · 09 Feb 2026
  • SCHEDULE 17 BRINGING INTO USE Application Form · 02 Feb 2026
  • LETTER Correspondence · 02 Feb 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Solihull decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Solihull's portal will say. Our guide explains the common types.