Planning application
West Of Burton Green Adjacent To An Existing National Grid Substation (Berkswell).
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising a three span accommodation overbridge approximately 59.6m in length and 6.25m in width that crosses the HS2 rail line, Earthworks around the abutments of the overbridge to fully conceal the concrete pile caps and tie the overbridge into the cutting slopes, Minor earthworks at either end of the overbridge to tie into the existing landscape, Minor earthworks to facilitate the realignment of Footpath M186, farm access roads and to create a new V-shaped ditch which is approximately 30.65m in length, 750mm deep with a side slope gradient of 1.2, and four vehicle restraint systems VRS approximately 0.75m high.
As published by the council, reference PL/2024/01233/HS2DIS
Application record
- Reference
- PL/2024/01233/HS2DIS
- Type
- HS2 Section 17 (DIS)
- Status
- Decided
- Decision
- Approved
- Received
- 26 Jun 2024
- Validated
- 26 Jun 2024
- Decided
- 15 Oct 2024
- Ward
- Meriden & Arden
- Parish
- Berkswell Parish Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Solihull register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
PL/2026/00214/HS2DIS Withdrawn
West Of Burton Green Adjacent To An Existing National Grid Substation (Berkswell)
Schedule 17 Bringing into use - Paragraph 9(1): Scheduled Work Numbers: 2/184 and 2/185 Footpath M186 Accommodation overbridge and realignment of footpath and access track.
Timeline
Dates from the published record
-
26 Jun 2024
Received by Solihull
-
15 Oct 2024
Decision issued: Approved
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Solihull granted permission on 15 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Solihull's portal will say. Our guide explains the common types.