Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North Of Tythe Barn Lane Dickens Heath

Awaiting decision Solihull PL/2025/02329/PPFL Major Full Other

Works: Demolition Trees Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from sports club and grazing land to sports club (Class F2) with 3 pitches (1 floodlit) and 1 junior/training artificial grass pitch with floodlights together with the construction of a clubhouse/changing room, ancillary storage buildings, car and coach parking with lighting, sustainable drainage system, footway/cycleway, altered vehicular access to Tilehouse Lane; catch netting, landscaping including an outdoor play space/gym, fencing/gates and biodiversity enhancements, and demolition of existing buildings/structures and felling of trees subject of a tree preservation order.

As published by the council, reference PL/2025/02329/PPFL

Application record

Reference
PL/2025/02329/PPFL
Type
Major Full Other
Status
Awaiting decision
Received
16 Dec 2025
Validated
16 Dec 2025
Ward
Blythe
Parish
Dickens Heath Parish Council

Timeline

Dates from the published record

  1. 16 Dec 2025

    Received by Solihull

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 March 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Solihull took a median of 77 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Star Planning and Development Agent, a planning consultancy registered in Solihull

Active · incorporated 2002 · Solihull

12 applications on PlanIndex · across 7 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

49 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Solihull for determination, against a statutory target of thirteen weeks. Over the last year Solihull decided full applications in a median of 190 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Solihull

  • PL/2026/01559/PPFL Awaiting decision

    The Royal Star And Garter Homes 26 Tudor Coppice Solihull B91 3DE

    Construction of new glazed terrace screening to the first floor.

    21 Aug 2026 Full applications
  • Olton Reservoir Warwick Road Olton Solihull

    Erect fence and entrance gates.

    20 Feb 2026 Full applications
  • PL/2026/01529/PPFL Awaiting decision

    Waterside Heights Waterside Dickens Heath Solihull B90 1UD

    Cladding remediation and fire safety works comprising the replacement of combustible external materials with non-combustible alternatives, including replacement spandrel panels, balcony decking, timber cladding and façade coverings, together with associated external alterations retaining a similar appearance to the existing building.

    19 Aug 2026 Full applications
  • 78 Prospect Lane Solihull B91 1HS

    Erect new two storey dwelling.

    18 Aug 2025 Full applications
  • PL/2026/01512/PPFL Awaiting decision

    Lloyds Campus 157 Creynolds Lane Cheswick Green Solihull B90 4ES

    Full planning permission for demolition of existing on-site buildings and development of 48 new residential dwellings (Use Class C3) and associated car and cycle parking, access infrastructure and network within the site, landscaping, public realm, drainage, utilities, energy and waste facilities and infrastructure.

    17 Aug 2026 Full applications