Planning application

Proposed Motorway Service Area Solihull Road Hampton In Arden Solihull

Granted Solihull PL/2025/00718/DIS Discharge of Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge condition Nos. 8 (Highways) parts a, b, d & e and 24 (Drainage) following planning appeal APP/Q4625/W/21/3275290 in relation to planning application PL/2015/51409/PPOL.

As published by the council, reference PL/2025/00718/DIS

Application record

Reference
PL/2025/00718/DIS
Type
Discharge of Conditions
Status
Decided
Decision
Granted As published: Approved
Received
4 Apr 2025
Validated
4 Apr 2025
Decided
8 Jan 2026
Ward
Bickenhill
Parish
Hampton In Arden Parish Council
Decision by
Delegated Decision

Site history

Applications at this address on the Solihull register

This site has had 4 applications since 2025: 3 approved, 0 refused.

  • Proposed Motorway Service Area Solihull Road Hampton In Arden Solihull

    Non-material amendment to planning permission dated 11th March 2022 (APP/Q4625/W/21/3275290 after planning application PL/2015/51409/PPOL) for: Outline planning application for development of a motorway service area, associated infrastructure and landscaping, with defined means of access for consideration including building and engineering operations and associated works to facilitate access to and egress from the motorway service area to the M42 (north and southbound) and an underpass beneath Solihull Road. Namely : amendment to the wording of condition 13 (part h) to the following: '...h) With the exception of the highway drainage system to be adopted as part of the M42 highway, the scheme shall ensure that the site surface water drainage system does not discharge water into the Motorway Drainage System, unless otherwise agreed in writing with the Local Planning Authority in conjunction with National Highways.

    Decided 24 Apr 2026 Amendments
  • Proposed Motorway Service Area Solihull Road Hampton In Arden Solihull

    Variation of Condition 4 and 5 of planning permission dated 11th March 2022 (APP/Q/4625/W/21/3275290 after planning application PL/2015/51409/PPOL) for outline planning application for development of a motorway service area, associated infrastructure and landscaping, with defined means of access for consideration including building and engineering operations and associated works to facilitate access to and egress from the motorway service area to the M42 (north and southbound) and an underpass beneath Solihull Road; Namly: For changes to proposed ground levels, proposed maximum building heights (within the Fuel Filling Station area), circulation of the site, alternative roof designs for the amenity and hotel buildings and updates to reflect the DCO J5A National Highway scheme.

    Decided 11 May 2026 Amendments
  • PL/2025/00606/VAR Awaiting decision

    Proposed Motorway Service Area Solihull Road Hampton In Arden Solihull

    Variation of Condition 13 following planning appeal APP/Q4625/W/21/3275290 dated 11 March 2022 in relation to planning application PL/2015/51409/PPOL for an outline planning application for development of a motorway service area, associated infrastructure and landscaping, with defined means of access for consideration including building and engineering operations and associated works to facilitate access to and egress from the motorway service area to the M42 (north and southbound) and an underpass beneath Solihull Road. Namely: To reword condition to reflect the amended drainage strategy.

    Submitted 24 Mar 2025 Amendments

Timeline

Dates from the published record

  1. 4 Apr 2025

    Received by Solihull

  2. 8 Jan 2026

    Decision issued: Approved

  3. 23 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: PL/2015/51409/PPOL (Decided)

Who's behind it

Company information only, from the register and Companies House

Pegasus Group Ltd Agent

1,239 applications on PlanIndex · across 172 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Extra MSA Group Applicant

5 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

146 documents on file for this application

  • DCON REPORT Officer Report · 08 Jan 2026
  • DECISION NOTICE DIS. OF COND. APPROVAL Decision · 08 Jan 2026
  • SMBC - DRAINAGE & LLFA Consultee Comment · 10 Dec 2025
  • RESPONSE TO LLFA COMMENTS Correspondence · 13 Nov 2025
  • E-MAIL FROM AGENT RE LLFA RESPONSE Correspondence · 13 Nov 2025
  • LLFA SUPPORTING COMMENTS Consultee Comment · 13 Nov 2025
  • UPDATED NATIONAL HIGHWAY COMMENTS Consultee Comment · 30 Sep 2025
  • NATIONAL HIGHWAYS COMMENTS Consultee Comment · 07 Aug 2025
  • AGETNT LETTER RESPONDING TO NATIOANL HIGHWAYS COMMENTS Correspondence · 17 Jul 2025
  • NATIONAL HIGHWAYS COMMENTS Consultee Comment · 15 May 2025
  • E-MAIL TO AGENT RE LLFA COMMENTS Correspondence · 09 May 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 07 May 2025
  • APPLICATION FORM REDACTED Application Form · 04 Apr 2025
  • CULVERT CROSS SECTION Drawing · 04 Apr 2025
  • SHADOWBROOK CULVERT TECHNICAL NOTE Report · 04 Apr 2025
  • LETTER OF TECHNICAL APPROVAL PART 1 Correspondence · 04 Apr 2025
  • M42 MSA - DESIGN CERTIFICATE -SIGNED Report · 04 Apr 2025
  • GEOTECHNICAL CERTIFICATE NO. 2 Report · 04 Apr 2025
  • COMBINED PRELIMINARY SOURCES STUDY AND GROUND IN Report · 04 Apr 2025
  • COMBINED PRELIMINARY SOURCES STUDY AND GROUND IN Report · 04 Apr 2025
  • COMBINED PRELIMINARY SOURCES STUDY AND GROUND IN Report · 04 Apr 2025
  • COMBINED PRELIMINARY SOURCES STUDY AND GROUND IN Report · 04 Apr 2025
  • COMBINED PRELIMINARY SOURCES STUDY AND GROUND IN Report · 04 Apr 2025
  • NB DIVERGE PLAN PROFILE (LONG SECTION (NORTHB) Drawing · 04 Apr 2025
  • NB DIVERGE PLAN PROFILE (CHEVRON SIGN FORWARD Drawing · 04 Apr 2025
  • DIVERGE PLAN PROFILE (LONG SECTION (SOUTHBO) Drawing · 04 Apr 2025
  • CROSS SECTION DCO LINK ROAD SHEET 1 OF 1 Report · 04 Apr 2025
  • CROSS SECTION NORTHBOUND MERGE SHEET 1 OF 3 Report · 04 Apr 2025
  • CROSS SECTION NORTHBOUND MERGE SHEET 2 OF 3 Report · 04 Apr 2025
  • CROSS SECTION NORTHBOUND MERGE SHEET 3 OF 3 Report · 04 Apr 2025
  • CROSS SECTION SOUTHBOUND DIVERGE SHEET 1 OF Report · 04 Apr 2025
  • CROSS SECTION SOUTHBOUND DIVERGE SHEET 2 OF Report · 04 Apr 2025
  • MERGE PLAN PROFILE (LONG SECTION (NORTHBOUN) Drawing · 04 Apr 2025
  • CROSS SECTION SLTL SHEET 1 OF 1 Report · 04 Apr 2025
  • SOLIHULL ROAD PLAN PROFILE (LONG SECTION (SO Drawing · 04 Apr 2025
  • PLAN PROFILE LONG SECTION (SEGREGATED LE) Drawing · 04 Apr 2025
  • GENERAL ARRANGEMENT PLAN Drawing · 04 Apr 2025
  • HIGHWAY BOUNDARY PLAN Drawing · 04 Apr 2025
  • LONG SECTION (BASIN ACCESS-1) Drawing · 04 Apr 2025
  • LONG SECTION (BASIN ACCESS-2) Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE (SHEET 1 OF 4) Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE (SHEET 2 OF 4) Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE (SHEET 3 OF 4) Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE (SHEET 4 OF 4) Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE ROUNDABOUT (SHEE Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE ROUNDABOUT (SHEE Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE BASIN ACCESS-1 ( Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE BASIN ACCESS-2 Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ARTICULATED VEHICLE Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ARTICULATED VEHICLE Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ARTICULATED VEHICLE Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ARTICULATED VEHICLE Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ABNORMAL LOAD SHEET Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ABNORMAL LOAD SHEET Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ABNORMAL LOAD SHEET Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS ABNORMAL LOAD SHEET Drawing · 04 Apr 2025
  • SWEPT PATH ANALYSIS BASIN ACCESSES Drawing · 04 Apr 2025
  • CROSS SECTIONS KEY PLAN Drawing · 04 Apr 2025
  • CROSS SECTIONS TYPICAL Drawing · 04 Apr 2025
  • CROSS SECTION BASIN ACCESS-1 SHEET 1 OF 1 Report · 04 Apr 2025
  • CROSS SECTION BASIN ACCESS-2 SHEET 1 OF 1 Report · 04 Apr 2025
  • PAVEMENT DETAILS DRAWING - 1 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT DETAILS DRAWING - 2 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT DETAILS DRAWING - 3 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT LAYOUT DRAWING - 1 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT LAYOUT DRAWING - 2 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT LAYOUT DRAWING - 3 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT PSV AAV LAYOUT DRAWING - 1 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT PSV AAV LAYOUT DRAWING - 2 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT PSV AAV LAYOUT DRAWING - 3 OF 3 Drawing · 04 Apr 2025
  • PAVEMENT LAYOUT DRAWING - OVERALL Drawing · 04 Apr 2025
  • NB DIVERGE SLTL - SHEET PILE RETAINING W Drawing · 04 Apr 2025
  • ROAD MARKINGS - SHEET 1 OF 4 Drawing · 04 Apr 2025
  • ROAD MARKINGS - SHEET 2 OF 4 Drawing · 04 Apr 2025
  • ROAD MARKINGS - SHEET 3 OF 4 Drawing · 04 Apr 2025
  • ROAD MARKINGS - SHEET 4 OF 4 Drawing · 04 Apr 2025
  • M42 INTERIM RSA STAGE 2 DESIGNERS RESPONSE Report · 04 Apr 2025
  • M42 MSA - MSA ACCESS RSA2 - ISSUE (MSA ACCESS JUNCTION STAGE 2 ROAD SAFETY AUDIT Report · 04 Apr 2025
  • TRAFFIC SIGN FACE DETAILS SHEET 1 Drawing · 04 Apr 2025
  • TRAFFIC SIGN FACE DETAILS SHEET 2 Drawing · 04 Apr 2025
  • SIGNAGE LOCATION PLAN SHEET 1 Drawing · 04 Apr 2025
  • SIGNAGE LOCATION PLAN SHEET 2 Drawing · 04 Apr 2025
  • STAGE 2 ROAD SAFETY AUDIT Report · 04 Apr 2025
  • STAGE 2 ROAD SAFETY AUDIT RESPONSE REPORT Report · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT AND KEY Drawing · 04 Apr 2025
  • GENERAL ARRANGEMENT PLAN Drawing · 04 Apr 2025
  • ENGINEERING PLAN LAYOUT Drawing · 04 Apr 2025
  • ROAD SIGNS AND MARKINGS Drawing · 04 Apr 2025
  • SSD BUS STOPS SHEET 1 OF 2 Drawing · 04 Apr 2025
  • SSD BUS STOPS SHEET 2 OF 2 Drawing · 04 Apr 2025
  • KERBS AND PAVEMENT DETAILS Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT SHEET 20 OF 21 Drawing · 04 Apr 2025
  • STOPPING SIGHT DISTANCE BASIN ACCESS Drawing · 04 Apr 2025
  • MSA ACCESS ROAD BRIDGE AIP DOCUMENT Report · 04 Apr 2025
  • MSA ACCESS ROAD BRIDGE GENERAL ARRANGEMENT Drawing · 04 Apr 2025
  • OVERVIEW (ROAD LIGHTING GENERAL ARRANGEMENT Drawing · 04 Apr 2025
  • ROAD LIGHTING ELECTRICAL SCHEMATIC Drawing · 04 Apr 2025
  • ROAD LIGHTING GENERAL ARRANGEMENT SH Drawing · 04 Apr 2025
  • ROAD LIGHTING GENERAL ARRANGEMENT SHEET Drawing · 04 Apr 2025
  • ROAD LIGHTING GENERAL ARRANGEMENT SHEET Drawing · 04 Apr 2025
  • ROAD LIGHTING GENERAL ARRANGEMENT SHEET Drawing · 04 Apr 2025
  • ROAD LIGHTING GENERAL ARRANGEMENT SHEET Drawing · 04 Apr 2025
  • VEHICLE RESTRAINT SYSTEM - GENERAL PLAN Drawing · 04 Apr 2025
  • VEHICLE RESTRAINT SYSTEM - SHEET 1 OF 4 Drawing · 04 Apr 2025
  • VEHICLE RESTRAINT SYSTEM - SHEET 2 OF 4 Drawing · 04 Apr 2025
  • VEHICLE RESTRAINT SYSTEM - SHEET 3 OF 4 Drawing · 04 Apr 2025
  • VEHICLE RESTRAINT SYSTEM - SHEET 4 OF 4 Report · 04 Apr 2025
  • PROPOSED DRAINAGE STRATEGY Drawing · 04 Apr 2025
  • DRAINAGE - CATCHMENTS Drawing · 04 Apr 2025
  • DRAINAGE KEY PLAN LAYOUT Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 1 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 2 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 3 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 4 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 5 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 6 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 7 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 8 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 9 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 10 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 11 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 12 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 13 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 14 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 15 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 16 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 17 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 18 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 19 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 20 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE PLAN LAYOUT - SHEET 21 OF 21 Drawing · 04 Apr 2025
  • DRAINAGE DETAILS - SHEET 1 OF 4 Drawing · 04 Apr 2025
  • DRAINAGE DETAILS - SHEET 2 OF 4 Drawing · 04 Apr 2025
  • DRAINAGE DETAILS - SHEET 3 OF 4 Drawing · 04 Apr 2025
  • DRAINAGE DETAILS - SHEET 4 OF 4 Drawing · 04 Apr 2025
  • PIPE AND CHAMBER SCHEDULE Report · 04 Apr 2025
  • HEWRAT ASSESSMENT REPORT OPTION B Report · 04 Apr 2025
  • EXISTING FACILITIES Drawing · 04 Apr 2025
  • EXISTING PUBLIC TRANSPORT Drawing · 04 Apr 2025
  • EXISTING TRIP GENERATORS Drawing · 04 Apr 2025
  • WCH ASSESSMENT (D6) (WCH ASSESSMENT REPORT) Report · 04 Apr 2025
  • WCH REVIEW (I3) (WCH REVIEW REPORT) Report · 04 Apr 2025
  • DRAINAGE STRATEGY PART 1 Report · 04 Apr 2025
  • DRAINAGE STRATEGY PART 2 Drawing · 04 Apr 2025
  • DRAINAGE STRATEGY PART 3 Drawing · 04 Apr 2025
  • COVERING LETTER Correspondence · 04 Apr 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Solihull granted permission on 8 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Solihull

  • PL/2026/01665/DIS Awaiting decision

    Mell Square Solihull

    Discharge condition Nos. 52 - Phase 2 (Demolition Management Plan), 53 - Phase 2 (Demolition and Construction Ecological Management Plan), Part discharge of conditon 54 - Part 3 and Part 4 - Phase 2 (Contaminated land) and Informative 4 (Biodiversity Gain Plan - Phase 2) following planning approval PL/2025/00547/MAJFDW.

    Received 11 Sep, published by the council 8 Oct 2026 Conditions
  • PL/2026/01598/DIS Awaiting decision

    5 Marston Drive Kingshurst Solihull B37 6BD

    Discharge condition 12 (Demolition and Construction Environmental Management Plan), 15 (Construction Environmental Management Plan) and 22 (Construction Management Plan) following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)

    Received 28 Aug, published by the council 7 Sep 2026 Conditions
  • PL/2026/01588/DIS Awaiting decision

    47 Lady Byron Lane Knowle Solihull B93 9AX

    Discharge of condition 16 - Biodiversity of planning approval PL/2026/00624/PPFL- Replacment Dwelling - Approved 5.8.26.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • PL/2026/01586/DIS Awaiting decision

    Kingshurst Village Centre And Former Mountford Public House, Marston Drive, Over Green Drive, Gilson Way And Church Close

    Discharge condition No. 11 following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • PL/2026/01498/DIS Awaiting decision

    36 Temple Road Dorridge Solihull B93 8LF

    Discharge of conditions 3 (Materials), 4 (Hard and Soft Landscaping), 6 (Surface Water), 7 (Demolition and Construction Management Plan), 8 (Protection Barriers), 10 (Bats) and 11 (Bat box) for planning permission PL/2025/02384/VAR dated 03.06.2026 for Variation of condition No. 1 following planning approval dated 01.08.2022 reference PL/2022/00208/MINFDW for Erection of replacement detached dwelling.

    Received 13 Aug, published by the council 24 Aug 2026 Conditions