Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Catherine De Barnes Lane Catherine De Barnes Solihull

Awaiting decision Solihull PL/2025/00424/DIS Discharge of Conditions

Relates to PL/2020/02792/PPFL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of condition 17 (community use agreement) of planning permission PL/2020/02792/PPFL.

As published by the council, reference PL/2025/00424/DIS

Application record

Reference
PL/2025/00424/DIS
Type
Discharge of Conditions
Status
Awaiting decision
Received
5 Mar 2025
Validated
14 Mar 2025
Ward
Bickenhill
Parish
Hampton In Arden Parish Council

Site history

Applications at this address on the Solihull register

This site has had 4 applications since 2020: 1 approved, 0 refused.

  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    Non-material amendment for planning permission PL/2020/02792/PPFL dated 16th August 2021 for replacement facilities at the WGAA; amend surface treatment to southern overflow parking to unbound granular surface with bays marked with timber markers, amend northern section of car park to full asphalt surface with reduced depth of construction and no permeable paving/attenuation, internal kerbing omitted and replaced by road markings, removal of lighting from the overflow car park.

    Decided 28 Nov 2023 Amendments
  • PL/2023/02094/DIS Withdrawn

    Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    Discharge condition No. 23 (Surface Water Treatment) following planning approval PL/2020/02792/PPFL for demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Decided 28 Nov 2023 Conditions
  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    Demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Decided 16 Aug 2021 Full applications

Timeline

Dates from the published record

  1. 5 Mar 2025

    Received by Solihull

  2. 14 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Solihull took a median of 77 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    Demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Decided 16 Aug 2021 Full applications

Who's behind it

Company information only, from the register and Companies House

The Blue Iris Partnership Limited Agent, registered in Rickmansworth

Active · incorporated 2019 · Rickmansworth

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Solihull for determination, against a statutory target of eight weeks. Over the last year Solihull decided condition discharge and variation applications in a median of 142 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Warwickshire Gaelic Athletic Association Catherine De Barnes Lane Catherine De Barnes Solihull B92 0DE

    PL/2023/01982/DIS Submitted 20 Sep 2023 40m away

    Discharge of condition No. 3 (materials) on planning approval PL/2020/02792/PPFL for the demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Granted Conditions Demolition 4 docs
  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    PL/2023/02126/NONMC Submitted 11 Oct 2023 44m away

    Non-material amendment for planning permission PL/2020/02792/PPFL dated 16th August 2021 for replacement facilities at the WGAA; amend surface treatment to southern overflow parking to unbound granular surface with bays marked with timber markers, amend northern section of car park to full asphalt surface with reduced depth of construction and no permeable paving/attenuation, internal kerbing omitted and replaced by road markings, removal of lighting from the overflow car park.

    Withdrawn Amendments 7 docs
  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    PL/2020/02792/PPFL Submitted 25 Nov 2020 44m away

    Demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Granted Full applications Demolition 199 docs
    Major scheme
  • Land At Catherine De Barnes Lane Catherine De Barnes Solihull

    PL/2023/02094/DIS Submitted 6 Oct 2023 53m away

    Discharge condition No. 23 (Surface Water Treatment) following planning approval PL/2020/02792/PPFL for demolition of the existing and construction of a replacement clubhouse building, provision of a new all-weather pitch, reconfigured playing pitches and access improvements in connection with the Warwickshire Gaelic Athletic Association facility at Catherine-de-Barnes Lane in Solihull.

    Withdrawn Conditions Demolition 20 docs
  • Woodhouse Farm Catherine De Barnes Lane Catherine De Barnes Solihull B92 0DJ

    PL/2025/01404/PPFL Submitted 18 Jul 2025 215m away

    Installation and operation of a 49.9 MW ground mounted solar farm and 5MW BESS facility together with all associated works, equipment, necessary infrastructure and biodiversity enhancement areas.

    Refused Full applications
    Major scheme
  • Heath End House Catherine De Barnes Lane Catherine De Barnes Solihull B92 0DJ

    PL/2019/03065/PN Submitted 6 Dec 2019 218m away

    Prior notification of demolition of Heath End House and associated outbuildings.

    Granted Prior approval Demolition 6 docs

In Solihull

  • 11 Featherstone Close Shirley Solihull B90 3RL

    Discharge of Condition 2 (Replacement tree) planning permission PL/2026/00152/TPO dated 14.04.2026 to Fell and remove 1 No. small silver birch tree (betula pendula)

    22 Jul 2026 Conditions
  • 1 Woodside Way Solihull B91 1HB

    Discharge condition Nos. 3- Materials, 7-CMS and 8- Levels following planning approval PL/2026/00549/PPFL- Erect replacment dwelling approved on 24.6.26 .

    20 Jul 2026 Conditions
  • Bulls Head Barston Lane Barston Solihull B92 0JU

    Discharge condition Nos. 3-Materials and 4-Written Scheme of Investigation (WSI) for a programme of archaeological work following planning approval PL/2025/02352/PPFL -Rebuilding of dilapidated barn and conversion into additional restaurant space. Installation of new doors and windows to existing opening and formation of new openings to connect the barn with the existing garden area. New patio to be formed. APPROVED 30-3-26

    5 May 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of condition 7 - Parts 1 and 2 (Phase 1B - Contaminated Land), 50 (Phase 2 - Demolition Phase Plan), 51 (Photographic Record - Phase 2), 54 - Parts 1 and 2 (Phase 2 and Phase 1C - Contaminated Land) and Biodiversity Net Gain Plan - Phase 1 of PL/2025/00547/MAJFDW.

    22 Apr 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of Condition Nos 3 (Demolition Phasing Plan - Phase 1), 4 (Record of Analysis of Buildings - Demolition - Phase 1), 5 Demolition Management Plan - Phase 1), 6 (Demolition and Construction Ecological Management Plan- Phase 1), 7 (Contaminated Land - Phase 1A), 8 (Tree Protection - Phase 1), 51 (Record of Buildings - Drury Lane Retail Units), 52 (Demolition Plan- Drury Lane Retail Units) and 53 (Demolition and Construction Ecological Plan - Phase 1C) following planning approval PL/2025/00547/MAJFDW.

    2 Apr 2026 Conditions