Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

Awaiting decision Solihull PL/2024/02845/PPOL Major Outline Dwellings

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline application for the construction of up to 92 dwellings with private gardens and garages; removal of all existing hardstanding areas and structures; alterations to existing access onto Lavender Hall Lane; and provision of new roads, public open space and drainage works across the site (access via Lavender Hall Lane only to be approved at outline stage).

As published by the council, reference PL/2024/02845/PPOL

Application record

Reference
PL/2024/02845/PPOL
Type
Major Outline Dwellings
Status
Awaiting decision
Received
2 Dec 2024
Validated
20 Dec 2024
Ward
Meriden & Arden
Parish
Berkswell Parish Council
Postcode
CV7 7BN

Site history

Applications at this address on the Solihull register

This site has had 3 applications since 2022: 2 approved, 0 refused.

  • Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

    Submission under Schedule 17 (6) of the High Speed Rail (London-West Midlands) Act 2017 for approval of lorry routes to/ from the above site for works comprising and associated with the diversion of the following Severn Trent Water assets: WMI-4A-0010 Inbound: The access route for the works will be from the, M6 onto A446, M42 and A45 Coventry Road, at Stonebridge roundabout take the exit onto the A452 Kenilworth Road. Construction route to Access A will be after the second roundabout heading South, vehicles will take the exit from A452 Kenilworth Road and onto Park Lane, taking the right turn into the BBV works access and onto the BBV Haul Road, continuing until Lavender Hall Lane, heading straight on for Access A, where they will be guided to their final destination by the site team. For Access B, heading further South on the A452 past Park Lane the driver will take the next left turn from the A452 onto Hallmeadow Road, then at the roundabout take the first exit onto Lavender Hall Lane and then turn right into Access B. Outbound: The egress route for the works will be from Access B, taking the left turn onto the Lavender Hall Lane and making their way over the railway bridge, taking the 3rd exit on the roundabout onto Hallmeadow Road before exiting onto A452 Kenilworth Road, For Access A, straight across Lavender Hall Lane plant crossing and onto the BBV haul road, from there they will exit onto Park Lane and continue until the A452 Kenilworth Road, taking the third exit to keep to the A452 Kenilworth Road and continuing up to the Stonebridge Roundabout to take the exits for A45 Coventry Road, M42 and A446 to M6.

    Decided 21 Jul 2023
  • Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

    Submission under Schedule 17 (6) of the High Speed Rail (London-West Midlands) Act 2017 for approval of lorry routes to/ from the above site for works comprising and associated with the diversion of the following Severn Trent Water assets: WMI-4A-0010 Inbound: The access route for the works will be from the, M6 onto A446, M42 and A45 Coventry Road, at Stonebridge roundabout take the exit onto the A452 Kenilworth Road, after the second roundabout vehicles will take the exit from A452 Kenilworth Road and onto Park Lane, taking the right turn into the BBV works access and onto the BBV Haul Road, continuing until Lavender Hall Lane, heading straight on for Access A, for Access B vehicles will be exiting out of Access C to re-join the road and taking the left turn into Access B. Outbound: The egress route for the works will be from Access B, taking the left turn onto the Lavender Hall Lane, and making their way over the railway bridge onto Hallmeadow Lane, taking the 3rd exit on the roundabout to continue up Hallmeadow Lane before exiting onto A452 Kenilworth Road, For Access A, straight across Lavender Hall Lane plant crossing and onto the BBV haul road, from there they will exit onto Park Lane and continue until the A452 Kenilworth Road, taking the left turn to join and continuing to the Hallmeadow Road Roundabout, taking the third exit to keep to the A452 Kenilworth Road and continuing up to the Stonebridge Roundabout to take the exits for A45 Coventry Road, M42 and A446 to M6.

    Decided 11 Aug 2022

Timeline

Dates from the published record

  1. 2 Dec 2024

    Received by Solihull

  2. 20 Dec 2024

    Validated

    Checked as complete and ready for consideration.

  3. 1 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 March 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Solihull took a median of 72 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Stansgate Planning LLP Agent, a planning consultancy registered in Stratford-Upon-Avon

Dissolved · incorporated 2007 · Stratford-Upon-Avon

260 applications on PlanIndex · across 15 councils · 81% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

ICMI Associates Ltd Applicant, registered in Tamworth

Active · incorporated 2015 · Tamworth

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

145 documents on file for this application

  • NPPF ? UPDATE NOTE Report · 01 Sep 2026
  • SMBC ECOLOGY 11.03.26 Consultee Comment · 11 Mar 2026
  • SMBC PUBLIC PROTECTION ? AIR QUALITY 10.03.26 Consultee Comment · 10 Mar 2026
  • BIODIVERSITY NET GAIN ASSESSMENT (BASELINE) MARCH 2026 Report · 06 Mar 2026
  • GREY CRESTED NEWT SURVEY REPORT MARCH 2026 Report · 06 Mar 2026
  • TERRESTRIAL INVERTEBRATE SURVEY REPORT MARCH 2026 Report · 06 Mar 2026
  • THE STATUTORY BIODIVERSITY METRIC CALCULATION V3 Report · 06 Mar 2026
  • SMBC LANDSCAPE 05.03.26 Consultee Comment · 05 Mar 2026
  • COMMITTEE REPORT Committee Report · 05 Mar 2026
  • APPLICANT AIR QUALITY NOTE 1 OF 2 Consultee Comment · 27 Feb 2026
  • APPLICANT AIR QUALITY NOTE 2 OF 2 Consultee Comment · 27 Feb 2026
  • SMBC LANDSCAPE 26.02.26 Consultee Comment · 27 Feb 2026
  • SMBC ECOLOGY 27.02.26 Consultee Comment · 27 Feb 2026
  • SMBC PUBLIC PROTECTION ? AIR QUALITY 25.02.26 Consultee Comment · 26 Feb 2026
  • SMBC HIGHWAYS 24.02.26 Consultee Comment · 25 Feb 2026
  • SMBC HIGHWAYS 18.02.26 Consultee Comment · 19 Feb 2026
  • HS2 13.02.26 Consultee Comment · 16 Feb 2026
  • FRAMEWORK PLAN Drawing · 11 Feb 2026
  • BERKSWELL PARISH COUNCIL FEB 2026 Consultee Comment · 06 Feb 2026
  • APPLICANT ECOLOGY NOTE 02.02.26 Report · 02 Feb 2026
  • SMBC ECOLOGY 27.01.26 Consultee Comment · 28 Jan 2026
  • SMBC PUBLIC PROTECTION (CONTAMINATED LAND) 27.01.26 Report · 27 Jan 2026
  • PARAMETERS PLAN Drawing · 20 Jan 2026
  • PROPOSED SITE ACCESS AND FOOTWAY CONNECTIVITY SHEET 1 OF 2 Drawing · 20 Jan 2026
  • PROPOSED SITE ACCESS AND FOOTWAY CONNECTIVITY SHEET 2 OF 2 Drawing · 20 Jan 2026
  • AIR QUALITY ASSESSMENT (REVISION 2) Report · 20 Jan 2026
  • SMBC - AFFORDABLE HOUSING Consultee Comment · 20 Jan 2026
  • PRELIMINARY RISK ASSESSMENT (FINAL REPORT V3) Report · 20 Jan 2026
  • ILLUSTRATIVE LAYOUT Drawing · 08 Jan 2026
  • SMBC HIGHWAYS Consultee Comment · 19 Dec 2025
  • BAT SURVEY 2024 V2 Report · 09 Dec 2025
  • BNG (BASELINE ONLY FOR DEVELOPMENT) - FINAL V2 Report · 09 Dec 2025
  • ECOLOGICAL RESPONSE V1 Report · 09 Dec 2025
  • GCN SURVEY REPORT - FINAL V2 Report · 09 Dec 2025
  • THE STATUTORY BIODIVERSITY METRIC Report · 09 Dec 2025
  • SMBC PUBLIC PROTECTION ? AIR QUALITY 04.12.25 Consultee Comment · 09 Dec 2025
  • SMBC ECOLOGY 10.11.25 Consultee Comment · 11 Nov 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 20 Oct 2025
  • APPLICANT DRAINAGE NOTE 09.10.25 Report · 09 Oct 2025
  • ATTENUATION BASIN DETAIL Drawing · 09 Oct 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 01 Oct 2025
  • ENVIRONMENT AGENCY 19.09.25 Consultee Comment · 19 Sep 2025
  • AGENT RESPONSE TO SMBC AIR QUALITY COMMENTS Report · 12 Sep 2025
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY (SEPTEMBER 2025) Report · 12 Sep 2025
  • PRELIMINARY RISK ASSESSMENT Report · 02 Sep 2025
  • SMBC LANDSCAPE 07.08.25 Consultee Comment · 07 Aug 2025
  • SMBC - AFFORDABLE HOUSING Consultee Comment · 23 Jul 2025
  • SMBC URBAN DESIGN 15.07.25 Consultee Comment · 15 Jul 2025
  • DESIGN AND ACCESS STATEMENT Report · 09 Jul 2025
  • SUPERSEDED - PARAMETERS PLAN Drawing · 09 Jul 2025
  • SMBC - URBAN DESIGN Consultee Comment · 09 Jul 2025
  • SMBC PUBLIC PROTECTION ? AIR QUALITY 13.06.25 Consultee Comment · 23 Jun 2025
  • SMBC - AFFORDABLE HOUSING Consultee Comment · 17 Jun 2025
  • SMBC HISTORIC ENVIRONMENT 30.04.25 Consultee Comment · 10 Jun 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 09 Jun 2025
  • SMBC - URBAN DESIGN Consultee Comment · 04 Jun 2025
  • COVER LETTER 26 MAY 2025 Report · 27 May 2025
  • ATTENUATION CALCS B Report · 27 May 2025
  • DRAINAGE LAYOUT SHEET 1 Drawing · 27 May 2025
  • DRAINAGE LAYOUT SHEET 2 Drawing · 27 May 2025
  • DRAINAGE LAYOUT SHEET 3 Drawing · 27 May 2025
  • SUPERSEDED - PARAMETERS PLAN Drawing · 27 May 2025
  • SUPERSEDED - FRAMEWORK PLAN Drawing · 27 May 2025
  • CONCEPT LAYOUT Drawing · 27 May 2025
  • SUPERSEDED - ILLUSTRATIVE LAYOUT Drawing · 27 May 2025
  • OPEN SPACE AND BNG PLAN Drawing · 27 May 2025
  • VIEW FROM LISTED BUILDINGS TOWARDS PROPOSED DEVELOPMENT Drawing · 27 May 2025
  • SMBC - PUBLIC PROTECTION 21.05.25 Consultee Comment · 21 May 2025
  • SMBC HISTORIC ENVIRONMENT 30.04.25 Consultee Comment · 01 May 2025
  • SMBC PLANNING POLICY 22.04.25 Consultee Comment · 29 Apr 2025
  • HS2 09.04.25 Consultee Comment · 09 Apr 2025
  • SMBC - PUBLIC PROTECTION 03.04.25 Consultee Comment · 03 Apr 2025
  • SMBC LANDSCAPE 1 OF 2 26.03.2025 Consultee Comment · 31 Mar 2025
  • SMBC LANDSCAPE 2 OF 2 26.03.2025 Consultee Comment · 31 Mar 2025
  • ENVIRONMENT AGENCY 21.03.25 Consultee Comment · 24 Mar 2025
  • SMBC PUBLIC PROTECTION ? CONTAMINATED LAND 24.03.25 Consultee Comment · 24 Mar 2025
  • NOISE IMPACT ASSESSMENT MARCH 2025 Report · 19 Mar 2025
  • SMBC RIGHTS OF WAY Correspondence · 17 Mar 2025
  • TRANSPORT TECHNICAL NOTE 1 Report · 12 Mar 2025
  • BIRMINGHAM AND SOLIHULL ICB 10.03.25 Correspondence · 11 Mar 2025
  • HS2 5 OF 5 Consultee Comment · 06 Feb 2025
  • HS2 2 OF 5 Consultee Comment · 06 Feb 2025
  • HS2 3 OF 5 Consultee Comment · 06 Feb 2025
  • HS2 4 OF 5 Consultee Comment · 06 Feb 2025
  • HS2 1 OF 5 Consultee Comment · 06 Feb 2025
  • SMBC HISTORIC ENVIRONMENT Consultee Comment · 05 Feb 2025
  • BERKSWELL PARISH COUNCIL Consultee Comment · 05 Feb 2025
  • RICHARD LLOYD Objection Comment · 04 Feb 2025
  • THE OPEN SPACE SOCIETY Objection Comment · 04 Feb 2025
  • SMBC EDUCATION 1 OF 2. Consultee Comment · 31 Jan 2025
  • SMBC EDUCATION 2 OF 2 Consultee Comment · 31 Jan 2025
  • MR JAMES LUPTON Public Comment · 31 Jan 2025
  • SMBC - AFFORDABLE HOUSING Consultee Comment · 30 Jan 2025
  • SMBC - URBAN DESIGN Consultee Comment · 29 Jan 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 21 Jan 2025
  • SMBC - PUBLIC PROTECTION Consultee Comment · 20 Jan 2025
  • MR JAMES LUPTON Public Comment · 19 Jan 2025
  • SEVERN TRENT WATER 1 OF 3 Consultee Comment · 17 Jan 2025
  • SEVERN TRENT WATER 2 OF 3 Consultee Comment · 17 Jan 2025
  • SEVERN TRENT WATER 3 OF 3 Consultee Comment · 17 Jan 2025
  • WEST MIDLANDS POLICE 14.01.25 Correspondence · 15 Jan 2025
  • WEST MIDLANDS FIRE SERVICE Consultee Comment · 13 Jan 2025
  • ANDREW BURROW - MERIDEN WARD Consultee Comment · 13 Jan 2025
  • NETWORK RAIL Consultee Comment · 13 Jan 2025
  • PLAYING PITCH CONTRIBUTIONS - 3 OF 3 Consultee Comment · 09 Jan 2025
  • PLAYING PITCH CONTRIBUTIONS - 2 OF 3 Consultee Comment · 09 Jan 2025
  • PLAYING PITCH CONTRIBUTIONS - 1 OF 3 Consultee Comment · 09 Jan 2025
  • PLANNING STATEMENT. Report · 23 Dec 2024
  • APPLICATION FORM Report · 18 Dec 2024
  • SUPERSEDED - DESIGN AND ACCESS STATEMENT Report · 18 Dec 2024
  • TRANSPORT ASSESSMENT Report · 18 Dec 2024
  • OPEN SPACE AND BNG PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - ILLUSTRATIVE LAYOUT Drawing · 18 Dec 2024
  • SUPERSEDED - FRAMEWORK PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - PARAMETERS PLAN Drawing · 18 Dec 2024
  • CONSTRAINTS AND OPPORTUNITIES PLAN Drawing · 18 Dec 2024
  • SITE LOCATION PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - PROPOSED SITE ACCESS AND FOOTWAY CONNECTIVIT Drawing · 18 Dec 2024
  • PHASE I ASSESSMENT Report · 16 Dec 2024
  • PRELIMINARY GEO-ENVIRONMENTAL ASSESSMENT Report · 09 Dec 2024
  • APPLICATION FORM REDACTED Application Form · 02 Dec 2024
  • EXISTING STREET SCENE AND SITE SECTIONS Drawing · 02 Dec 2024
  • TOPOGRAPHICAL SURVEY Drawing · 02 Dec 2024
  • TOPOGRAPHICAL SURVEY Drawing · 02 Dec 2024
  • TOPOGRAPHICAL SURVEY Drawing · 02 Dec 2024
  • TOPOGRAPHICAL SURVEY Drawing · 02 Dec 2024
  • UTILITIES REPORT Report · 02 Dec 2024
  • HERITAGE STATEMENT Report · 02 Dec 2024
  • ARCHEOLOGICAL DESK-BASED ASSESSMENT Report · 02 Dec 2024
  • LETTER Correspondence · 02 Dec 2024
  • BIODIVERSITY NET GAIN Report · 02 Dec 2024
  • GREAT CRESTED NEWT SURVEY Report · 02 Dec 2024
  • REPTILE SURVEY REPORT Report · 02 Dec 2024
  • INVERTEBRATE SURVEY REPORT Report · 02 Dec 2024
  • STATUTORY BIODIVERSITY METRIC CALCULATION Report · 02 Dec 2024
  • PRELIMINARY ECOLOGICAL APPRAISSAL Report · 02 Dec 2024
  • FLOOD RISK ASSESSMENT Report · 02 Dec 2024
  • ARBORICULTURAL SURVEY REPORT Report · 02 Dec 2024
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 02 Dec 2024
  • AIR QUALITY ASSESSMENT Report · 02 Dec 2024
  • ILLUSTRATIVE LANDSCAPE MASTERPLAN Drawing · 02 Dec 2024
  • LANDSCAPE AND VISUAL APPRAISAL Report · 02 Dec 2024
  • BAT SURVEY 2024 Report · 02 Dec 2024
  • NOISE IMPACT ASSESSMENT AUGUST 2024 Report · 02 Dec 2024
  • OMITTED PRE-VALIDATION - PLANNING STATEMENT Report · 02 Dec 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Solihull for determination, against a statutory target of thirteen weeks. Over the last year Solihull decided outline applications in a median of 220 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Unit 3 Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

    PL/2019/02841/CLEUD Submitted 7 Nov 2019 100 yards away

    Certificate of lawful development for the existing Units 1-3 that have all been used for storing and distributing electrical lighting for use on television and theatre sets as part of business for a period of over 10 years. Please see enclosed covering letter and Statutory Declaration.

    Granted Lawful development 3 docs
  • Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

    PL/2022/01043/HS2DIS Submitted 17 May 2022 100 yards away

    Submission under Schedule 17 (6) of the High Speed Rail (London-West Midlands) Act 2017 for approval of lorry routes to/ from the above site for works comprising and associated with the diversion of the following Severn Trent Water assets: WMI-4A-0010 Inbound: The access route for the works will be from the, M6 onto A446, M42 and A45 Coventry Road, at Stonebridge roundabout take the exit onto the A452 Kenilworth Road, after the second roundabout vehicles will take the exit from A452 Kenilworth Road and onto Park Lane, taking the right turn into the BBV works access and onto the BBV Haul Road, continuing until Lavender Hall Lane, heading straight on for Access A, for Access B vehicles will be exiting out of Access C to re-join the road and taking the left turn into Access B. Outbound: The egress route for the works will be from Access B, taking the left turn onto the Lavender Hall Lane, and making their way over the railway bridge onto Hallmeadow Lane, taking the 3rd exit on the roundabout to continue up Hallmeadow Lane before exiting onto A452 Kenilworth Road, For Access A, straight across Lavender Hall Lane plant crossing and onto the BBV haul road, from there they will exit onto Park Lane and continue until the A452 Kenilworth Road, taking the left turn to join and continuing to the Hallmeadow Road Roundabout, taking the third exit to keep to the A452 Kenilworth Road and continuing up to the Stonebridge Roundabout to take the exits for A45 Coventry Road, M42 and A446 to M6.

    Granted 12 docs
  • Lavender Hall Farm Lavender Hall Lane Berkswell Solihull CV7 7BN

    PL/2023/01083/HS2DIS Submitted 17 May 2023 100 yards away

    Submission under Schedule 17 (6) of the High Speed Rail (London-West Midlands) Act 2017 for approval of lorry routes to/ from the above site for works comprising and associated with the diversion of the following Severn Trent Water assets: WMI-4A-0010 Inbound: The access route for the works will be from the, M6 onto A446, M42 and A45 Coventry Road, at Stonebridge roundabout take the exit onto the A452 Kenilworth Road. Construction route to Access A will be after the second roundabout heading South, vehicles will take the exit from A452 Kenilworth Road and onto Park Lane, taking the right turn into the BBV works access and onto the BBV Haul Road, continuing until Lavender Hall Lane, heading straight on for Access A, where they will be guided to their final destination by the site team. For Access B, heading further South on the A452 past Park Lane the driver will take the next left turn from the A452 onto Hallmeadow Road, then at the roundabout take the first exit onto Lavender Hall Lane and then turn right into Access B. Outbound: The egress route for the works will be from Access B, taking the left turn onto the Lavender Hall Lane and making their way over the railway bridge, taking the 3rd exit on the roundabout onto Hallmeadow Road before exiting onto A452 Kenilworth Road, For Access A, straight across Lavender Hall Lane plant crossing and onto the BBV haul road, from there they will exit onto Park Lane and continue until the A452 Kenilworth Road, taking the third exit to keep to the A452 Kenilworth Road and continuing up to the Stonebridge Roundabout to take the exits for A45 Coventry Road, M42 and A446 to M6.

    Granted 10 docs
  • The Triangle Lavender Hall Lane Berkswell Solihull CV7 7BN

    PL/2024/01342/PPFL Submitted 10 Jul 2024 100 yards away

    Installation of new water storage tank to serve existing irrigation system.

    Granted Full applications 9 docs
  • Fernbank Lavender Hall Lane Berkswell Solihull CV7 7BN

    PL/2023/00523/CLOPUD Submitted 8 Mar 2023 150 yards away

    Certificate of lawful development for a proposed installation of a lodge under the Caravan Act.

    Granted Lawful development 9 docs
  • 19 Wilmot Close Balsall Common Solihull CV7 7RG

    PL/2026/00544/MINFHO Submitted 19 Mar 2026 350 yards away

    90% historically approved · decision due ~9 Oct

    Garage enlargement following planning approval PL/2023/00339/MINFHO.

    Awaiting decision 8 docs

In Solihull

  • PL/2026/01579/PIP Awaiting decision

    Land Off Birchy Leasowes Lane Tidbury Green Solihull B90 1PU

    Permission in principle for the erection of 2 No. dwellings with associated external works.

    Received 26 Aug, published by the council 2 Sep 2026 Outline
  • PL/2026/01543/PPOL Awaiting decision

    11 Broadfern Road Knowle Solihull B93 9DE

    Outline planning application for new dwelling in rear garden.

    Received 19 Aug, published by the council 28 Aug 2026 Outline
  • PL/2026/01551/PIP Awaiting decision

    Land Off Hampton Road Knowle Solihull B93 0NX

    Permission in principle for the construction of up to 9 No. dwellings.

    Received 13 Aug, published by the council 14 Sep 2026 Outline
  • PL/2026/01438/PIP Awaiting decision

    116 Lady Byron Lane Knowle Solihull B93 9BA

    Permission in principle for the erection of 2 No. dwellings.

    Received 29 Jul, published by the council 10 Aug 2026 Outline
  • PL/2026/01337/PIP Awaiting decision

    Land Off Smiths Lane Knowle Solihull

    Permission in principle for the construction of up to 9 No. dwellings.

    Received 17 Jul, published by the council 19 Aug 2026 Outline