Planning application
Land East Of Balsall Common Village, Approximately 400M To The South East Of Berkswell Train Station
Relates to PL/2023/00400/HS2DIS
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge condition No. 2 (Materials) from PL/2023/00400/HS2DIS.
As published by the council, reference PL/2024/01351/S17DIS
Application record
- Reference
- PL/2024/01351/S17DIS
- Type
- HS2 Schedule 17 Discharge of Conditions
- Status
- Awaiting decision
- Received
- 12 Jul 2024
- Validated
- 12 Jul 2024
- Ward
- Meriden
- Parish
- Berkswell Parish Council
Site history
Applications at this address on the Solihull register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
PL/2023/00400/HS2DIS Granted
Land East Of Balsall Common Village, Approximately 400M To The South-east Of Berkswell Train Station
Plans and Specifications submission under Schedule 17 (part 1, paragraph 2) of the High Speed Rail (London - West Midlands) Act 2017 for works comprising: - A permanent railway underbridge (Carol Green Rail Underbridge) including 2 no. stairways and handrails, which will allow HS2 to cross over the top of an existing railway; - Acoustic panels either side of the railway underbridge (Carol Green Rail Underbridge); - Concrete parapet walls at both ends of the railway underbridge (Carol Green Rail Underbridge).
Timeline
Dates from the published record
-
12 Jul 2024
Received by Solihull
-
8 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 September 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Solihull took a median of 72 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
PL/2023/00400/HS2DIS Granted
Land East Of Balsall Common Village, Approximately 400M To The South-east Of Berkswell Train Station
Plans and Specifications submission under Schedule 17 (part 1, paragraph 2) of the High Speed Rail (London - West Midlands) Act 2017 for works comprising: - A permanent railway underbridge (Carol Green Rail Underbridge) including 2 no. stairways and handrails, which will allow HS2 to cross over the top of an existing railway; - Acoustic panels either side of the railway underbridge (Carol Green Rail Underbridge); - Concrete parapet walls at both ends of the railway underbridge (Carol Green Rail Underbridge).
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Solihull for determination, against a statutory target of eight weeks. Over the last year Solihull decided condition discharge and variation applications in a median of 104 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Solihull
-
PL/2026/01665/DIS Awaiting decision
Mell Square Solihull
Discharge condition Nos. 52 - Phase 2 (Demolition Management Plan), 53 - Phase 2 (Demolition and Construction Ecological Management Plan), Part discharge of conditon 54 - Part 3 and Part 4 - Phase 2 (Contaminated land) and Informative 4 (Biodiversity Gain Plan - Phase 2) following planning approval PL/2025/00547/MAJFDW.
-
PL/2026/01598/DIS Awaiting decision
5 Marston Drive Kingshurst Solihull B37 6BD
Discharge condition 12 (Demolition and Construction Environmental Management Plan), 15 (Construction Environmental Management Plan) and 22 (Construction Management Plan) following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)
-
PL/2026/01588/DIS Awaiting decision
47 Lady Byron Lane Knowle Solihull B93 9AX
Discharge of condition 16 - Biodiversity of planning approval PL/2026/00624/PPFL- Replacment Dwelling - Approved 5.8.26.
-
PL/2026/01586/DIS Awaiting decision
Kingshurst Village Centre And Former Mountford Public House, Marston Drive, Over Green Drive, Gilson Way And Church Close
Discharge condition No. 11 following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)
-
PL/2026/01498/DIS Awaiting decision
36 Temple Road Dorridge Solihull B93 8LF
Discharge of conditions 3 (Materials), 4 (Hard and Soft Landscaping), 6 (Surface Water), 7 (Demolition and Construction Management Plan), 8 (Protection Barriers), 10 (Bats) and 11 (Bat box) for planning permission PL/2025/02384/VAR dated 03.06.2026 for Variation of condition No. 1 following planning approval dated 01.08.2022 reference PL/2022/00208/MINFDW for Erection of replacement detached dwelling.