Planning application
Brough Lodge Fetlar Shetland
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change use of Brough Lodge and outbuildings from domestic to hotel, upgrade access track and parking area. Restore and upgrade fabric, install services including new septic tank.
As published by the council, reference 2026/158/PPF
Application record
- Reference
- 2026/158/PPF
- Type
- Planning Permission Full
- Status
- Pending Consideration
- Received
- 30 Jul 2026
- Validated
- 7 Aug 2026
- Ward
- Fetlar
- Parish
- FETLAR
Site history
Applications at this address on the Shetland Islands register
This site has had 3 applications since 2026.
-
2026/151/PPF Withdrawn
Brough Lodge Fetlar Shetland
Change use of Brough Lodge and outbuildings from domestic to hotel, upgrade access track and parking area. Restore and upgrade fabric, install services including new septic tank.
-
2026/149/LBC Awaiting decision
Brough Lodge Fetlar Shetland
Convert Brough Lodge to Small Hotel. Restore and upgrade fabric, structure, install services, carry out repairs and make alterations to main building, gardens and selected outbuildings
Timeline
Dates from the published record
-
30 Jul 2026
Received by Shetland Islands
-
5 Aug 2026
Added to PlanIndex
-
7 Aug 2026
Validated
Checked as complete and ready for consideration.
-
8 Aug 2026
Status changed to Pending Consideration
-
Decision
Awaiting decision
Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Shetland Islands took a median of 59 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 2026/151/PPF (Decided)
Who's behind it
Company information only, from the register and Companies House
Malcolmson Architects Agent, an architecture practice registered in Scalloway
Active · incorporated 2017 · Scalloway
48 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
42 documents on file for this application
- DRAIN/FLOOD - RECONSULTATION - COMMENTS
- PHASE 1 - PROPOSED SITE LAYOUT
- HES - COMMENTS
- ROADS - COMMENTS
- OUTDOOR ACCESS OFFICER - COMMENTS
- ARCHAEOLOGIST - COMMENTS
- MARINE PLANNING - COMMENTS
- DRAIN/FLOOD- COMMENTS RECONSULTATION
- PROPOSED DRAINAGE LAYOUT
- PROPOSED DRAINAGE DETAILS
- ARCHEOLOGICAL DESK BASED ASSESSMENT AND WALKOVER SURVEY
- EXISTING SITE LAYOUT
- EXISTING SITE ELEVATIONS
- EXISTING LODGE - FLOOR PLANS
- EXISTING LODGE - ELEVATIONS
- EXISTING LODGE - SECTIONS
- PHASE 1 - PROPOSED SITE LAYOUT
- PROPOSED LODGE - GA PLANS AND SECTIONS
- PROPOSED LODGE - ELEVATIONS
- PROPOSED LODGE - GF DETAILED LAYOUT
- PROPOSED LODGE - FF DETAILED LAYOUT
- PROPOSED LODGE - ROOF PLAN
- PHASE 1 DOWNTAKINGS - FLOOR PLANS
- PHASE 1 DOWNTAKINGS - ROOF PLAN
- PHASE 1 DOWNTAKINGS - ELEVATIONS
- OLD HAA - SITE PLANT BUILDINGS
- OUTBUILDING-SWITCHROOM-SUBSTATION
- LODGE ROOF DETAILS 1
- LODGE ROOF DETAILS 2
- LODGE GROUND FLOOR DETAIL
- WINDOW DETAILS 1
- WINDOW DETAILS 2
- LANDSCAPE PLAN
- PROPOSED 3D SITE LAYOUT
- PROPOSED SITE LAYOUT - EXTENDED
- APPENDICES FOR SUPPORTING STATEMENT
- SUPPORTING STATEMENT - CONSERVATION REPORT
- EXISTING PHOTOGRAPHIC SURVEY - LODGE INTERIOR
- STRUCTURAL ENGINEER REPORT
- A LOCATION PLAN
- APPLICATION PDF
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Shetland Islands for determination, against a statutory target of eight weeks. Over the last year Shetland Islands decided full applications in a median of 75 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Brough Lodge Fetlar Shetland
98% historically approved · decision due ~16 Sep
Convert Brough Lodge to Small Hotel. Restore and upgrade fabric, structure, install services, carry out repairs and make alterations to main building, gardens and selected outbuildings
Awaiting decision Heritage and listed buildings 38 docs
Other full applications
In Shetland Islands
-
026/188/PPF Awaiting decision
Land West Of Culsetter Park, Brae, Shetland
Full Planning Permission for the construction of new access road and associated drainage infrastructure; and Planning Permission in Principle for ten number 1-2 storey detached residential dwellings for Culsetter Park Phase 3 housing development
-
2026/183/PPF Awaiting decision
8 Fogralea Lerwick Shetland ZE1 0SE
Gable garage extension with alterations to a vehicular access.
-
2026/172/PPF Awaiting decision
Plot Lower Hillside Gulberwick Shetland
2 No. self-catering glamping pods, drainage works, and timber boundary fence 1.2M - 1.8M.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry