Planning application
Brough Lodge Fetlar Shetland
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Change use of Brough Lodge and outbuildings from domestic to hotel, upgrade access track and parking area. Restore and upgrade fabric, install services including new septic tank.
As published by the council, reference 2026/151/PPF
Application record
- Reference
- 2026/151/PPF
- Status
- Decided
- Decision
- Withdrawn
- Received
- 20 Jul 2026
- Validated
- 22 Jul 2026
- Decided
- 3 Aug 2026
- Ward
- Fetlar
Site history
Applications at this address on the Shetland Islands register
This site has had 3 applications since 2026.
-
2026/158/PPF Awaiting decision
Brough Lodge Fetlar Shetland
Change use of Brough Lodge and outbuildings from domestic to hotel, upgrade access track and parking area. Restore and upgrade fabric, install services including new septic tank.
-
2026/149/LBC Awaiting decision
Brough Lodge Fetlar Shetland
Convert Brough Lodge to Small Hotel. Restore and upgrade fabric, structure, install services, carry out repairs and make alterations to main building, gardens and selected outbuildings
Timeline
Dates from the published record
-
20 Jul 2026
Received by Shetland Islands
-
22 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
3 Aug 2026
Decision issued: Withdrawn
Related applications
Cases linked to this one on the register
- Application: 2026/149/LBC (Pending Consideration)
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
- CONSULTATION RESPONSE - COMMUNITY COUNCIL FETLAR
- OUTDOOR ACCESS - COMMENTS
- LANDSCAPE PLAN
- CONSULTATION RESPONSE - SIC MARINE PLANNING
- CONSULTATION RESPONSE - SIC DRAINAGE
- EXISTING SITE LAYOUT
- A LOCATION PLAN
- PHASE 1 PROPOSED SITE LAYOUT - EXTENDED
- PROPOSED DRAINAGE LAYOUT
- PROPOSED DRAINAGE DETAILS
- EXISTING ELEVATIONS
- ARCHAEOLOGICAL ASSEMENT
- EXISTING SITE ELEVATIONS
- EXISTING FLOOR PLANS
- EXISTING SECTIONS
- OUTBUILDING - SUBSTATION ELEVATIONS AND FLOOR PLAN
- PHASE 1 - PROPOSED SITE LAYOUT
- PROPOSED LODGE - PLANS AND SECTIONS
- PROPOSED LODGE - ELEVATIONS
- PROPOSED LODGE - DETAILED GROUND FLOOR PLAN
- PROPOSED LODGE - FIRST FLOOR DETAILED PLAN
- PROPOSED LODGE - ROOF PLAN
- DOWNTAKINGS - FLOOR PLANS
- DOWNTAKINGS - ROOF PLAN
- DOWNTAKINGS - ELEVATIONS
- OLD HAA - SITE PLANT BUILDING ELEVATIONS AND FLOOR PLAN
- LODGE ROOF DETAILS 1
- LODGE ROOF DETAILS 2
- LODGE GROUND FLOOR DETAIL
- LODGE WINDOW DETAILS 1
- LODGE WINDOW DETAILS 2
- LANDSCAPE PLAN
- PROPOSED 3D SITE LAYOUT
- SUPPORTING STATEMENT - CONSERVATION REPORT
- INTERIOR PHOTOGRAPHS
- APPLICATION SUMMARY PDF
- APPLICATION PDF
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Shetland Islands decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Shetland Islands's portal will say. Our guide explains the common types.