Planning application

Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

Granted Shetland Islands 2025/230/CLUP Certificate of lawful proposed

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed new switching compound module and local equipment room.

As published by the council, reference 2025/230/CLUP

Application record

Reference
2025/230/CLUP
Type
Certificate of lawful proposed
Status
Decided
Decision
Granted As published: Permitted Development
Received
9 Sep 2025
Validated
23 Sep 2025
Decided
20 Nov 2025
Ward
Delting
Parish
DELTING
Decision by
Delegated Decision
Postcode
ZE2 9TU

Site history

Applications at this address on the Shetland Islands register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    Decided 25 Aug 2026
  • 2024/245/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    To install guide wires and anchors for flare

    Decided 7 Nov 2024 Full applications

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by Shetland Islands

  2. 23 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 20 Nov 2025

    Decision issued: Permitted Development

  4. 28 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Aurora Planning Limited Agent, a planning consultancy registered in Stonehaven

Active · incorporated 2017 · Stonehaven

19 applications on PlanIndex · across 5 councils · 88% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Enquest Heather Limited Applicant, registered in London

Active · incorporated 1992 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • DECISION Decision · 20 Nov 2025
  • SCREENING OPINION Decision · 20 Nov 2025
  • APPLICATION FORM Application Form · 09 Sep 2025
  • EXISTING SITE PLAN Drawing · 09 Sep 2025
  • LOCATION PLAN Drawing · 09 Sep 2025
  • PROPOSED SITE PLAN Drawing · 09 Sep 2025
  • PROPOSED SUBSTATION 100 ELEVATIONS Drawing · 09 Sep 2025
  • PROPOSED SUBSTATION 100 PLAN Drawing · 09 Sep 2025
  • PROPOSED SUBSTATION 68 ELEVATIONS Drawing · 09 Sep 2025
  • PROPOSED SUBSTATION 68 PLAN Drawing · 09 Sep 2025
  • SUPPORTING STATEMENT Supporting Documents · 09 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 20 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    2025/317/PPF Submitted 19 Dec 2025 50 yards away

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    Granted 62 docs

In Shetland Islands

  • 2026/187/CLUP Awaiting decision

    Thule Bar Esplanade Lerwick Shetland ZE1 0LL

    Install 2 x2m Awnings above the front door entrance and side entrance.

    Received 3 Sep, published by the council 4 Sep 2026 Lawful development
  • 2026/053/CLUP Granted

    Norsecroft LADYSMITH ROAD Scalloway Shetland ZE1 0XD

    Certificate of lawfulIness for extension at the rear of the house 2m x 5.6m x 2m.

    Received 9 Mar, published by the council 28 Jul 2026 Lawful development
  • 2026/086/CLUP Granted

    Entrance to rear of St Olafs Church

    Install a new underground electricity cable to provide power to listed building St Olafs Church( LB18649) to replace overhead line, as part of undergrounding works related to Cullivoe road widening Scheme, Under Class 40 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended)

    Received 23 Apr, published by the council 28 Jul 2026 Lawful development
  • 2026/063/CLUP Granted

    To the south of the access road to Gaet-a-Gott.

    The construction of attenuation and overflow storage basins in order to reduce flood risk during high intensity rainfall events.

    Received 16 Mar, published by the council 28 Jul 2026 Lawful development
  • 2025/288/CLUP Granted

    2 Camp Brae Shetland ZE2 9BY

    Proposed development of a new ancillary detached garage 8.5M x 5.5M

    Received 11 Nov, published by the council 28 Jul 2026 Lawful development