Planning application
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed new switching compound module and local equipment room.
As published by the council, reference 2025/230/CLUP
Application record
- Reference
- 2025/230/CLUP
- Type
- Certificate of lawful proposed
- Status
- Decided
- Decision
- Permitted Development
- Received
- 9 Sep 2025
- Validated
- 23 Sep 2025
- Decided
- 20 Nov 2025
- Ward
- Delting
- Parish
- DELTING
- Decision by
- Delegated Decision
- Postcode
- ZE2 9TU
Site history
Applications at this address on the Shetland Islands register
This site has had 3 applications since 2024: 3 approved, 0 refused.
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2024/245/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
To install guide wires and anchors for flare
Timeline
Dates from the published record
-
9 Sep 2025
Received by Shetland Islands
-
23 Sep 2025
Validated
Checked as complete and ready for consideration.
-
20 Nov 2025
Decision issued: Permitted Development
-
28 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Aurora Planning Limited Agent, a planning consultancy registered in Stonehaven
Active · incorporated 2017 · Stonehaven
15 applications on PlanIndex · across 2 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordEnquest Heather Limited Applicant, registered in London
Active · incorporated 1992 · London
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
- DECISION
- SCREENING OPINION
- APPLICATION FORM
- EXISTING SITE PLAN
- LOCATION PLAN
- PROPOSED SITE PLAN
- PROPOSED SUBSTATION 100 ELEVATIONS
- PROPOSED SUBSTATION 100 PLAN
- PROPOSED SUBSTATION 68 ELEVATIONS
- PROPOSED SUBSTATION 68 PLAN
- SUPPORTING STATEMENT
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 20 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
Granted 62 docs
Other lawful development applications
In Shetland Islands
-
2026/053/CLUP Granted
Norsecroft LADYSMITH ROAD Scalloway Shetland ZE1 0XD
Certificate of lawfulIness for extension at the rear of the house 2m x 5.6m x 2m.
-
2026/086/CLUP Granted
Entrance to rear of St Olafs Church
Install a new underground electricity cable to provide power to listed building St Olafs Church( LB18649) to replace overhead line, as part of undergrounding works related to Cullivoe road widening Scheme, Under Class 40 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended)
-
2026/063/CLUP Granted
To the south of the access road to Gaet-a-Gott.
The construction of attenuation and overflow storage basins in order to reduce flood risk during high intensity rainfall events.
-
2025/288/CLUP Granted
2 Camp Brae Shetland ZE2 9BY
Proposed development of a new ancillary detached garage 8.5M x 5.5M
-
2024/225/CLUP Granted
A970 Lerwick To Sumburgh Road Between Its North And South Junctions With The Levenwick Loop Road
The re-alignment and widening of an existing public road.