Planning application

Entrance to rear of St Olafs Church

Granted Shetland Islands 2026/086/CLUP Certificate of lawful proposed

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Install a new underground electricity cable to provide power to listed building St Olafs Church( LB18649) to replace overhead line, as part of undergrounding works related to Cullivoe road widening Scheme, Under Class 40 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended)

As published by the council, reference 2026/086/CLUP

Application record

Reference
2026/086/CLUP
Type
Certificate of lawful proposed
Status
Decided
Decision
Permitted Development
Received
23 Apr 2026
Validated
23 Apr 2026
Decided
3 Jun 2026
Parish
YELL
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 23 Apr 2026

    Received by Shetland Islands

  2. 3 Jun 2026

    Decision issued: Permitted Development

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 04 Jun 2026
  • CLUP DECISION NOTICE Decision · 04 Jun 2026
  • APPLICATION PDF Application Form · 23 Apr 2026
  • A LOCATION PLAN Drawing · 23 Apr 2026
  • PLAN OF UNDERGROUND CABLE ROUTE AT 1_500 Drawing · 23 Apr 2026
  • PHOTO OF REAR OF BUILDING SHOWING DETAILS OF NEW PROPOSED CABLE Photo · 23 Apr 2026
  • PHOTO OF CHURCH AND GROUNDS Photo · 23 Apr 2026
  • PHOTO OF BUILDING AND GROUNDS Photo · 23 Apr 2026
  • SIGNED WAYLEAVE FROM THE CHURCH OF SCOTLAND Drawing · 23 Apr 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 3 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Sand Lodge Foreshore, Cullivoe, Yell, Shetland

    2026/008/WL Submitted 22 Apr 2026 476m away

    To install a submersible water pump in a protective rock gabion with associated pipework between MHWS and MLWS to supply water to a domestic water source heat pump system

    Granted 13 docs
  • Sandlodge Cullivoe Yell Shetland ZE2 9DD

    2026/088/PPF Submitted 30 Apr 2026 496m away

    Installation of a submersible pump and protective gabion on the foreshore to supply seawater for a domestic water source heat pump located at the rear of the dwellinghouse with pipework buried under public road.

    Granted Full applications 21 docs
    Domestic

In Shetland Islands

  • 2026/053/CLUP Granted

    Norsecroft LADYSMITH ROAD Scalloway Shetland ZE1 0XD

    Certificate of lawfulIness for extension at the rear of the house 2m x 5.6m x 2m.

    9 Mar 2026 Lawful development
  • 2026/063/CLUP Granted

    To the south of the access road to Gaet-a-Gott.

    The construction of attenuation and overflow storage basins in order to reduce flood risk during high intensity rainfall events.

    16 Mar 2026 Lawful development
  • 2025/288/CLUP Granted

    2 Camp Brae Shetland ZE2 9BY

    Proposed development of a new ancillary detached garage 8.5M x 5.5M

    11 Nov 2025 Lawful development
  • 2025/230/CLUP Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Proposed new switching compound module and local equipment room.

    9 Sep 2025 Lawful development
  • 2024/225/CLUP Granted

    A970 Lerwick To Sumburgh Road Between Its North And South Junctions With The Levenwick Loop Road

    The re-alignment and widening of an existing public road.

    3 Sep 2024 Lawful development