Skip to content
PlanIndex Get alerts
Menu

Planning application

Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

Granted Shetland Islands 2024/245/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To install guide wires and anchors for flare

As published by the council, reference 2024/245/PPF

Application record

Reference
2024/245/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
19 Sep 2024
Validated
19 Sep 2024
Decided
7 Nov 2024
Ward
Delting
Parish
DELTING
Decision by
Delegated Decision
Postcode
ZE2 9TU

Site history

Applications at this address on the Shetland Islands register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    Decided 25 Aug 2026 Full applications
  • 2025/230/CLUP Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Proposed new switching compound module and local equipment room.

    Decided 20 Nov 2025 Lawful development

Timeline

Dates from the published record

  1. 19 Sep 2024

    Received by Shetland Islands

  2. 7 Nov 2024

    Decision issued: Grant subject to conditions

  3. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Stonehaven

16 applications on PlanIndex · across 2 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 7 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Sullom Voe Oil Terminal Callbackness Mossbank Shetland

    2025/214/HRA Submitted 19 Aug 2025 363m away

    Habitats Regulations Appraisal in respect of the proposed removal of 6no. crude tanks, 3no. ballast tanks, a pipe track, contractors accommodation, LPG transfer skid and substation, and topside jetty infrastructure.

    Decided 15 docs

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications