Planning application
Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX
Works: Extension Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a two-storey front extension to office building, provision of cladding and removal of 1x window opening to first-floor
As published by the council, reference 26/00996/FUL
Application record
- Reference
- 26/00996/FUL
- Type
- Full Planning Application
- Status
- Awaiting decision
- Received
- 7 Apr 2026
- Validated
- 7 Apr 2026
- Ward
- Mosborough
- Postcode
- S20 3GX
Site history
Applications at this address on the Sheffield register
This site has had 3 applications since 2026: 1 approved, 0 refused.
-
26/02228/FUL Granted
Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX
Demolition of existing ground floor canteen/amenities building, parts storage building and first-floor part storage building and erection of a two-storey building and erection of an open sided steel stockholding facility (Application under Section 73 to remove condition 9 (BREEAM) imposed by planning permission 25/00899/FUL)
-
25/00899/COND1 Decided
Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX
Application to approve details in relation to condition no(s) 3 (Ground Investigations and Groundworks), 4 (Remediation Strategy Report), 8 (Predicted Energy Needs), and 10 (External Material Details) as imposed by planning permission 25/00899/FUL
Timeline
Dates from the published record
-
7 Apr 2026
Received by Sheffield
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 54 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Sheffield for determination, against a statutory target of eight weeks. Over the last year Sheffield decided full applications in a median of 76 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX
Application to approve details in relation to condition no(s) 3 (Ground Investigations and Groundworks), 4 (Remediation Strategy Report), 8 (Predicted Energy Needs), and 10 (External Material Details) as imposed by planning permission 25/00899/FUL
Decided Conditions 14 docs -
Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX
Demolition of existing ground floor canteen/amenities building, parts storage building and first-floor part storage building and erection of a two-storey building and erection of an open sided steel stockholding facility (Application under Section 73 to remove condition 9 (BREEAM) imposed by planning permission 25/00899/FUL)
Granted Full applications Demolition -
Units 2 & 3 White Rose Business Park 15 Meadowbrook Park Sheffield S20 3AB
Change of use from Industrial unit to Personal Training Studio ( Gym) and retention of 2 external roller shutter doors
Granted Full applications 8 docs -
Land Adjacent Therco Ltd Rother Valley Way Sheffield S20 3RW
Application under Sec 73 to vary condition 2. (list of approved drawings) imposed by 18/02439/FUL (Erection of manufacturing facility (Use Class B2) with integral offices and showroom and provision of parking) to allow design changes, eliminate phased construction and changes to accommodation of public drain
Granted Full applications 21 docs -
Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW
Erection of 2 fire water tanks, pumphouse, 2 valve houses and other ancillary plant and equipment to support the operation of the community renewable energy facility
Granted Full applications 14 docs -
Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW
90% historically approved · decision due ~3 Nov
Application to approve details in relation to condition numbers: 3 (Detailed Battery Safety Management Plan (DBSMP)), 5 (Biodiversity Construction Environmental Management Plan (Biodiversity CEMP)) and the Statutory Biodiversity Net Gain condition relating to planning permission 26/00871/FUL
Awaiting decision Conditions 7 docs
Other full applications
In Sheffield
-
26/01562/FUL Granted
29 Whiteley Wood Road Sheffield S11 7FF
Demolition of detached garage and erection of dwellinghouse (self build) within side curtilage of existing dwellinghouse (29 Whiteley Wood Road), involving erection of wall and fencing to denote curtilage division, associated parking and landscaping and alterations to existing vehicular driveway
-
26/00969/FUL Granted
Cecil Square Mosque 14 - 24 Cecil Square Sheffield S2 4NT
Erection of first floor extension, associated internal alterations, installation of new facing materials including render and cladding and provision of external bin storage area
-
26/02057/FUL Granted
Sculpt Fitness Studios Ltd Clough Bank Works Clough Bank Sheffield S2 4EA
Erection of single-storey extension to gym
-
26/02071/FUL Refused
Far Whiteley Farm Hangram Lane Sheffield S11 7TQ
Erection of timber framed canopy/ gazebo
-
26/02175/FUL Refused
573 City Road Sheffield S2 1GL
Provision of dropped kerb and parking area to dwellinghouse