Land Adjacent Therco Ltd Rother Valley Way Sheffield S20 3RW

Granted Sheffield 21/00796/FUL Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under Sec 73 to vary condition 2. (list of approved drawings) imposed by 18/02439/FUL (Erection of manufacturing facility (Use Class B2) with integral offices and showroom and provision of parking) to allow design changes, eliminate phased construction and changes to accommodation of public drain

As published by the council, reference 21/00796/FUL

Application record

Reference
21/00796/FUL
Type
Full Planning Application
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
23 Feb 2021
Validated
23 Feb 2021
Decided
15 Sep 2021
Ward
Mosborough
Decision by
Delegated decision
Postcode
S20 3RW

Timeline

Dates from the published record

  1. 23 Feb 2021

    Received by Sheffield

  2. 15 Sep 2021

    Decision issued: Grant Conditionally

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Sheffield granted permission on 15 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Storage Building White Waters Station Road Halfway Sheffield S20 3RW

    14/01662/AFPN Submitted 6 May 2014 250 yards away

    Prior approval of proposed change of use of agricultural building to a flexible use (storage and distribution)

    Granted Other 6 docs
  • Woolley Bros (Wholesale Meats) Ltd Rother Valley Way Sheffield S20 3RW

    20/01625/FUL Submitted 4 May 2020 250 yards away

    Application to allow the level of the ground floor to be lower, amend building design, and revise parking, access, drainage and landscaping details (Application under Section 73 to vary conditions 2 and 5 (List of approved documents; highway improvements), and remove conditions 3, 4 and 6 (drainage; construction access; landscape details) of planning permission no. 17/04168/FUL (Extension to building to form meat cutting, processing and chilling facilities with associated parking and servicing areas))

    Granted Full applications Extension 41 docs
  • Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW

    26/00871/COND1 Submitted 8 Sep 2026 250 yards away

    90% historically approved · decision due ~3 Nov

    Application to approve details in relation to condition numbers: 3 (Detailed Battery Safety Management Plan (DBSMP)), 5 (Biodiversity Construction Environmental Management Plan (Biodiversity CEMP)) and the Statutory Biodiversity Net Gain condition relating to planning permission 26/00871/FUL

    Decided 7 docs
  • Stagecoach Rother Valley Way Sheffield S20 3RW

    26/02632/FUL Submitted 4 Sep 2026 250 yards away

    89% historically approved · decision due ~3 Nov

    Proposed electrification works including a RMU, 2no. Transformers, 2 feeder panels and new ground mounted EV chargers

    Awaiting decision Full applications 16 docs
  • Massey Truck Engineering Ltd Station Road Halfway Sheffield S20 3GX

    26/00996/FUL Submitted 7 Apr 2026 300 yards away

    89% historically approved · decision due ~2 Jun

    Erection of a two-storey front extension to office building, provision of cladding and removal of 1x window opening to first-floor

    Awaiting decision Full applications Extension Windows or glazing 16 docs
  • Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW

    23/02361/FUL Submitted 21 Jul 2023 300 yards away

    Erection of 2 fire water tanks, pumphouse, 2 valve houses and other ancillary plant and equipment to support the operation of the community renewable energy facility

    Granted Full applications 14 docs

In Sheffield

  • 26/02552/FUL Decided

    26 Toppham Road Sheffield S8 7NW

    Erection of single-storey side extension to dwellinghouse

    Received 26 Aug, published by the council 7 Sep 2026 Full applications
  • 26/03062/FUL Awaiting decision

    142 Hallowmoor Road Sheffield S6 4XD

    Erection of hip to gable extension with rear dormer window and front roof lights to form 2nd floor habitable space, single/two-storey side extension with ground-floor external covered area, provision of dropped kerb and new driveway to dwellinghouse

    Received 13 Oct, published by the council 19 Oct 2026 Full applications
  • 26/03047/FUL Awaiting decision

    96 Gervase Drive Sheffield S8 7PN

    Erection of two/single-storey rear extension to dwellinghouse

    Received 12 Oct, published by the council 19 Oct 2026 Full applications
  • 26/03050/FUL Awaiting decision

    49 Parkhead Road Sheffield S11 9RA

    Erection of single-storey rear extension, two-storey font/side extension and conversion of garage, infill of carport and alterations to rear raised patio of dwellinghouse

    Received 12 Oct, published by the council 19 Oct 2026 Full applications
  • 26/03055/FUL Awaiting decision

    12 Morland Drive Sheffield S14 1SY

    Erection of external fire escape staircase and alterations to door and window openings

    Received 12 Oct, published by the council 19 Oct 2026 Full applications