Planning application
Weston Tower West Bar Green Sheffield S1 2DA
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing building and erection of part 27, 13 and 10 storey building comprising 316 homes (Use Class C3), and commercial floorspace (Use Class E), together with landscaping and associated infrastructure
As published by the council, reference 25/03233/FUL
Application record
- Reference
- 25/03233/FUL
- Type
- Full Planning Application
- Status
- Awaiting decision
- Received
- 30 Oct 2025
- Validated
- 30 Oct 2025
- Ward
- City
- Postcode
- S1 2DA
Timeline
Dates from the published record
-
30 Oct 2025
Received by Sheffield
-
20 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 49 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
16 applications on PlanIndex · across 11 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
100 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Paradise House 35 Paradise Street Sheffield S3 8PZ
92% historically approved · decision due ~7 Oct
1 non illuminated logo facia sign, 2 non illuminated individual letter signs, 1 non illuminated projecting double sided sign and 3 window vinyls
Awaiting decision Advertising Windows or glazing -
95 Queen Street City Centre Sheffield S1 1GN
Erection of second floor extension to form 3no additional apartments (Use Class C3)
Granted Full applications New dwelling Extension 20 docs -
12 Paradise Square Sheffield S1 2DE
Internal alterations including installation of a spiral staircase, compartmentation works, alterations to lightwell and installation of roof window in rear roofslope
Granted Heritage and listed buildings Windows or glazing 20 docs -
12 Paradise Square Sheffield S1 2DE
Omission of dormer window on rear elevation and steps to lightwell, and internal reconfiguring on floors 2 and 3 (Non-material amendment to planning permission 18/03213/FUL)
Granted Amendments Loft or dormer Windows or glazing 5 docs -
St Philip's The Printhouse 21 - 23 North Church Street Sheffield S1 2DH
Application under Sec 73 to vary condition 6. imposed by 13/02646/FUL to allow an extension to the hours during which amplified sound and live music is permitted (Amended Description)
Granted Full applications Extension 19 docs -
North Church House 84 Queen Street City Centre Sheffield S1 2DW
Application to allow glazed balcony system in lieu of parapet wall (Application under Section 73 to vary condition no(s) 2 (approved plans); As imposed by planning permission 22/00711/FUL - Amendments to the approved design in order to comply with current fire regulations (Application under Section 73 to vary condition no. 2 (Approved Plans) as imposed by planning permission no. 19/03371/FUL - Removal of mansard roof and erection of 2-storey roof extension comprising 18 no. apartments (use class C3), formation of roof terrace and associated alterations, including relocation of entrance and additional and replacement windows, to facilitate the residential use of the building (9 no. additional units plus 49 no. units with extant ORPN approval totalling a 58 no. unit development))
Granted Full applications New dwelling Extension +2 14 docsMajor scheme
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse