Planning application
Wharncliffe Works Green Lane Shalesmoor Sheffield S3 8SE
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of the roof of existing building and erection of a 4 storey building comprising of ground floor office accommodation, 2 x 4-bedroom and 1 x 3-bedroom apartments within the retained walls (Application under Section 73 to vary condition no(s) 2 (approved plans) as imposed by planning permission 18/03814/FUL)
As published by the council, reference 26/02512/FUL
Application record
- Reference
- 26/02512/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 20 Aug 2026
- Validated
- 25 Aug 2026
- Ward
- City
- Postcode
- S3 8SE
Comment by 5 October 2026
The council is taking comments on this application until then. Have your say on Sheffield's portal.
Timeline
Dates from the published record
-
20 Aug 2026
Received by Sheffield
-
25 Aug 2026
Validated
Checked as complete and ready for consideration.
-
30 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 49 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Wharncliffe Works Green Lane Shalesmoor Sheffield S3 8SE
92% historically approved · decision due ~20 Oct
Removal of the roof of existing building and erection of a 4 storey building comprising of ground floor office accommodation, 2 x 4-bedroom and 1 x 3-bedroom apartments within the retained walls (Application under Section 73 to vary condition non no(s) 2 (approved plans) as imposed by planning permission 18/03815/LBC)
Awaiting decision Heritage and listed buildings New dwelling 3 docs -
Site Of Former Green Lane Works Green Lane Shalesmoor Sheffield S3 8SE
Application to approve details in relation to Condition Nos. 4/5. External materials; 8. Energy measures; 9. Highway improvements; 20. Vehicular access arrangements; 27. Site investigation report; 37. Landscape scheme; 43. Surface water drainage; relating to planning permission no. 12/01401/FUL
Withdrawn Conditions 29 docs -
22 Cornish Place Cornish Street Sheffield S6 3AF
92% historically approved · decision due ~28 Jul
Like-for-like replacement of 6no. windows with double glazed timber framed windows
Decided Heritage and listed buildings Windows or glazing -
VorV Wharncliffe Works Cornish Street Sheffield S6 3FB
92% historically approved · decision due ~23 May
Internal works to building including Installation of mezzanine floor, internal partitions, new stairs and enlarged roof opening
Awaiting decision Heritage and listed buildings 17 docs -
Site Of Former 318-322 Shalesmoor Sheffield S3 8UL
Application to approve details in relation to condition number(s): 19 (Signage), 25 (Public Art), 26 (Refuse Strategy) and 28 (Travel Plan) imposed by planning permission 17/02005/FUL
Decided Conditions 7 docs -
R M Walker Construction 18 Dun Fields Sheffield S3 8SP
Application to approve details in relation to condition number 21. Public Art; Relating to planning permission 16/02703/FUL
Decided Conditions 7 docs
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse