Skip to content
PlanIndex Get alerts
Menu

Planning application

Wharncliffe Works Green Lane Shalesmoor Sheffield S3 8SE

Awaiting decision Sheffield 26/02512/FUL Full applications

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Removal of the roof of existing building and erection of a 4 storey building comprising of ground floor office accommodation, 2 x 4-bedroom and 1 x 3-bedroom apartments within the retained walls (Application under Section 73 to vary condition no(s) 2 (approved plans) as imposed by planning permission 18/03814/FUL)

As published by the council, reference 26/02512/FUL

Application record

Reference
26/02512/FUL
Category
Full applications
Status
Awaiting decision
Received
20 Aug 2026
Validated
25 Aug 2026
Ward
City
Postcode
S3 8SE

Comment by 5 October 2026

The council is taking comments on this application until then. Have your say on Sheffield's portal.

Timeline

Dates from the published record

  1. 20 Aug 2026

    Received by Sheffield

  2. 25 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Wharncliffe Works Green Lane Shalesmoor Sheffield S3 8SE

    26/02565/LBC Submitted 25 Aug 2026 0m away

    92% historically approved · decision due ~20 Oct

    Removal of the roof of existing building and erection of a 4 storey building comprising of ground floor office accommodation, 2 x 4-bedroom and 1 x 3-bedroom apartments within the retained walls (Application under Section 73 to vary condition non no(s) 2 (approved plans) as imposed by planning permission 18/03815/LBC)

    Awaiting decision Heritage and listed buildings New dwelling 3 docs
  • Site Of Former Green Lane Works Green Lane Shalesmoor Sheffield S3 8SE

    13/00703/COND Submitted 1 Mar 2013 0m away

    Application to approve details in relation to Condition Nos. 4/5. External materials; 8. Energy measures; 9. Highway improvements; 20. Vehicular access arrangements; 27. Site investigation report; 37. Landscape scheme; 43. Surface water drainage; relating to planning permission no. 12/01401/FUL

    Withdrawn Conditions 29 docs
  • 22 Cornish Place Cornish Street Sheffield S6 3AF

    26/01634/LBC Submitted 2 Jun 2026 51m away

    92% historically approved · decision due ~28 Jul

    Like-for-like replacement of 6no. windows with double glazed timber framed windows

    Decided Heritage and listed buildings Windows or glazing
  • VorV Wharncliffe Works Cornish Street Sheffield S6 3FB

    25/01007/LBC Submitted 28 Mar 2025 56m away

    92% historically approved · decision due ~23 May

    Internal works to building including Installation of mezzanine floor, internal partitions, new stairs and enlarged roof opening

    Awaiting decision Heritage and listed buildings 17 docs
  • Site Of Former 318-322 Shalesmoor Sheffield S3 8UL

    17/02005/COND7 Submitted 14 Oct 2019 109m away

    Application to approve details in relation to condition number(s): 19 (Signage), 25 (Public Art), 26 (Refuse Strategy) and 28 (Travel Plan) imposed by planning permission 17/02005/FUL

    Decided Conditions 7 docs
  • R M Walker Construction 18 Dun Fields Sheffield S3 8SP

    16/02703/COND7 Submitted 21 Oct 2019 149m away

    Application to approve details in relation to condition number 21. Public Art; Relating to planning permission 16/02703/FUL

    Decided Conditions 7 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications