Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Pexton Road Sheffield S4 7DA

Granted Sheffield 14/03965/FUL Full Planning Application

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations, including dormer windows, to rear outbuilding to create annexe accommodation on ground floor with storage above (retrospective application)

As published by the council, reference 14/03965/FUL

Application record

Reference
14/03965/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
27 Oct 2014
Validated
27 Oct 2014
Decided
8 Jun 2018
Ward
Burngreave
Decision by
Delegated decision
Postcode
S4 7DA

Timeline

Dates from the published record

  1. 27 Oct 2014

    Received by Sheffield

  2. 8 Jun 2018

    Decision issued: Grant Conditionally

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Telecommunications Mast On Roof Of 8 Pexton Road Sheffield S4 7DA

    26/01766/FULTEL Submitted 12 Jun 2026 0m away

    92% historically approved · decision due ~7 Aug

    Upgrade of existing telecommunications base station including removal and replacement of 5.0m stub tower supporting 6no. antennas with 7.5m stub tower supporting 6no. antennas, 2no. 0.3m dishes, removal of 1no. equipment cabinet, installation of 2no. equipment cabinets, and ancillary development

    Decided
  • 33 Pexton Road Sheffield S4 7DA

    19/03426/HPN Submitted 17 Sep 2019 12m away

    Single-storey rear extension - the extension is 6 metres from the rear of the original dwellinghouse, ridge height no more than 3.6 metres and height to the eaves of 2.2 metres

    Granted Prior approval Extension Roofing 9 docs
    Small domestic
  • 45 Sturton Road Sheffield S4 7DE

    26/01637/FUL Submitted 2 Jun 2026 74m away

    92% historically approved · decision due ~5 Aug

    Demolition of garage, erection of single-storey detached annex

    Decided Full applications Demolition
    Small domestic
  • 197 Abbeyfield Road Sheffield S4 7AW

    26/01851/FUL Submitted 18 Jun 2026 179m away

    92% historically approved · decision due ~17 Aug

    Erection of two-storey rear extension to dwellinghouse with external steps

    Decided Full applications Extension
    Domestic
  • 199 Abbeyfield Road Sheffield S4 7AW

    26/02173/FUL Submitted 20 Jul 2026 179m away

    92% historically approved · decision due ~21 Sep

    Erection of two-storey rear extension including formation of external steps to dwellinghouse

    Awaiting decision Full applications Extension
    Domestic
  • 22 Devon Road Sheffield S4 7AJ

    23/04038/FUL Submitted 22 Dec 2023 179m away

    Demolition of attached side garage and erection of a 2 storey side extension (amended description)

    Granted Full applications Extension Demolition 6 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications