Planning application
19/03426/HPN
33 Pexton Road Sheffield S4 7DA
Proposal
Single-storey rear extension - the extension is 6 metres from the rear of the original dwellinghouse, ridge height no more than 3.6 metres and height to the eaves of 2.2 metres
As published by the council, reference 19/03426/HPN
Timeline
Dates from the published record
-
17 Sep 2019
Received by Sheffield
-
14 Oct 2019
Decision issued: Prior Approval not Required
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
26/01766/FULTEL Awaiting decision
Telecommunications Mast On Roof Of 8 Pexton Road Sheffield S4 7DA
Upgrade of existing telecommunications base station including removal and replacement of 5.0m stub tower supporting 6no. antennas with 7.5m stub tower supporting 6no. antennas, 2no. 0.3m dishes, removal of 1no. equipment cabinet, installation of 2no. equipment cabinets, and ancillary development
-
26/01637/FUL Awaiting decision
45 Sturton Road Sheffield S4 7DE
Demolition of garage, erection of single-storey detached annex
-
23/04038/FUL Granted
22 Devon Road Sheffield S4 7AJ
Demolition of attached side garage and erection of a 2 storey side extension (amended description)
-
23/02924/FUL Refused
58 Earl Marshal Road Sheffield S4 8LA
Retention of alterations to building to allow change of use from dwellings to 4no. apartments (Resubmission of 22/04545/FUL)
-
26/01851/FUL Awaiting decision
197 Abbeyfield Road Sheffield S4 7AW
Erection of two-storey rear extension to dwellinghouse with external steps
-
18/04637/COND4 Decided
Site Of Former 2 Crabtree Road Sheffield S5 7BB
Application to approve details in relation to condition number(s): 14 & 15 (Highways Improvements), 16 (South-Western Footway / Internal Access Road), 17 (Surfacing) and 18 (Drainage) imposed by planning pemission 18/04637/FUL
Other prior approval applications
In Sheffield
-
26/01773/HPN Granted
150 Ferrars Road Sheffield S9 1SA
Single-storey rear extension - the extension will be 4.275 metres from the rear of the original dwellinghouse, ridge height no more than 3.615 metres and height to the eaves of 2.75 metres
-
26/01826/HPN Refused
41 Hallam Grange Road Sheffield S10 4BH
Single-storey rear extension to dwellinghouse - the extension is 6.00 metres from the rear of the original dwellinghouse, ridge height no more than 3.76 metres and the height of the eaves is 2.260 metres
-
26/02198/HPN Awaiting decision
166 Cartmell Road Sheffield S8 0NN
Single-storey rear extension - the extension will be 3.7 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and height to the eaves of 2.75 metres
-
26/01602/PVPN Granted
3 Storth Hollow Croft Sheffield S10 3HW
Installation of solar panels to roof of dwellinghouse
-
26/01783/HPN Granted
35 Yoredale Avenue Sheffield S35 2ZW
Single-storey rear extension - the extension will be 4.5 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and height to the eaves of 3 metres