Planning application
Eccles Substation Coldstream Scottish Borders
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of underground grid cable Connection and electronic communications line
As published by the council, reference 24/01035/CLPU
Application record
- Reference
- 24/01035/CLPU
- Type
- Certificate of Lawful Proposed Use
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 2 Sep 2024
- Validated
- 2 Sep 2024
- Decided
- 29 Oct 2024
- Ward
- Mid Berwickshire
- Parish
- Leitholm, Eccles & Birgham C.C
- Decision by
- Delegated Decision (Part 3's)
Timeline
Dates from the published record
-
2 Sep 2024
Received by Scottish Borders
-
29 Oct 2024
Decision issued: Approved
-
31 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Scottish Borders granted permission on 29 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land North Of Eccles Substation Eccles Coldstream Scottish Borders
Extension to the existing substation and erection of two hybrid synchronous compensators
Granted Full applications Extension 95 docs -
Land West Of Eccles Sub Station Coldstream Scottish Borders
Proposed battery storage system with a capacity of in excess of 50 Mw and associated work
Decided Outline 9 docs -
Eccles II Battery Energy Storage System Land West Of Eccles Sub Station Coldstream Scottish Borders
Battery Energy Storage System with an export capacity of up to 500 MW, located west of Eccles Substation
Granted 110 docs -
Battery Storage Facility Coldstream Scottish Borders
Battery Electricity Storage System (BESS) and Associated Infrastructure
Granted 172 docs -
Land West Of Eccles Sub Station Coldstream Scottish Borders
Proposed Development would provide grid stability services to the National Grid - option 1 synchronous compensator or Option 2 battery storage
Decided Outline 11 docs -
Bishops Dal Battery Energy Storage Scheme Land South Of Eccles Substation Coldstream Scottish Borders
Battery Energy Storage System (BESS), Substation, Transformers and Associated Infrastructure
Granted 100 docs
Other lawful development applications
In Scottish Borders
-
26/01145/CLEU Granted
Third Floor Flat 10C Canongate Jedburgh Scottish Borders TD8 6AJ
Existing use as short-term let accommodation
-
26/01267/CLPU Awaiting decision
2 Galalaw Road Hawick Scottish Borders TD9 8DT
Proposed child minding business to be operated from dwellinghouse
-
26/01264/CLPU Awaiting decision
Broadmeadows Farm Yarrowford Selkirk Scottish Borders
Temporary sitting of shipping container for storage
-
26/00840/FUL Granted
1 Sheriffmuir Lyne Peebles Scottish Borders EH45 8NP
Partial demolition and rebuild of existing garage
-
26/00766/CLPU Granted
School House Gifford Road Longformacus Duns Scottish Borders TD11 3NZ
Alterations to windows