Planning application
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of a detached carport.
As published by the council, reference 2026/1062/FUL
Application record
- Reference
- 2026/1062/FUL
- Category
- Full applications
- Status
- Registered
- Received
- 26 Aug 2026
- Validated
- 26 Aug 2026
- Ward
- Exton Ward
- Parish
- Ashwell Parish Council
- Decision by
- Delegated Decision
- Postcode
- LE15 7SR
Timeline
Dates from the published record
-
26 Aug 2026
Received by Rutland
-
27 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rutland took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in St. Albans
3 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Rutland for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
91% historically approved · decision due ~27 Oct
Alteration and lowering of the sitting room window. Middle section to incorporate a door.
Awaiting decision Windows or glazing 15 docs -
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
External alterations to include 2 no. additional rooflights to the south elevation. Replace dormer window(s) on South & North elevations. Removal of existing velux window to East elevation. Painting of windows.
Granted Full applications Loft or dormer Windows or glazing 27 docs -
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
Internal & external alterations to include 2 no. additional rooflights to the south elevation. Replace dormer window(s) on South & North elevations. Removal of existing velux window to East elevation. Painting of windows. Creation of new ensuite to bedroom 7 and new doorway (D9). Creation of a laundry room and new internal doorway (D7). Creation of ensuite to master bedroom to include new doorway (D8) & removal of chimneybreast. Installation of new cloakroom to boot room. Raise height of existing chimney breast to allow for Aga and extract unit. Creation of cloakroom and cupboard to study. Creation of bathroom and kitchenette on second floor.
Granted Heritage and listed buildings Loft or dormer Windows or glazing 29 docs -
Gallery House 2 Ashwell Hall Stables Ashwell Rutland LE15 7LH
T1 Yew reduced by 3 metres all round to keep the tree in a reasonable shape and size for its location
Granted Trees 5 docs -
East Lodge 1 Ashwell Hall Stables Ashwell Rutland LE15 7LH
T1 Lime reduced by 4 metres and sides reduced in to match to ensure tree keeps to a reasonable size for its location
Granted Trees 5 docs -
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
Replacement of a existing timber & upvc capped glazed roof structure above the dining room with Anthracite powder coated aluminium frame glazed roof.
Granted Heritage and listed buildings Windows or glazing 16 docs
Other full applications applications
In Rutland
-
2026/1088/FUL Awaiting decision
1 Tippings Lane Barrowden Rutland LE15 8EW
Installation of new entrance gates & fencing to front of property.
-
2026/1075/FUL Awaiting decision
Silver Birches 3B Top Road Ridlington Rutland LE15 9AX
Demolition of conservatory and construction of single storey family room
-
2025/1635/FUL Withdrawn
Land To The South Of Stonecrop House 5A Top Street Wing Rutland
Installation of 14 no. photovoltaic panels along the north edge of a vegetable growing area.
-
2026/1059/FUL Awaiting decision
66 Stockerston Road Uppingham Rutland LE15 9UD
Single-storey extension to the existing bungalow to provide a garage.
-
2026/1055/FUL Awaiting decision
34 Church Street Langham Rutland LE15 7JE
Various external works including changing windows and front door, cladding, insulating the gables, change to roof tiles and addition of solar panels. Reinstate original driveway entrance, installation of post and rail fence.