Skip to content
PlanIndex Get alerts
Menu

Planning application

East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR

Awaiting decision Rutland 2026/1062/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of a detached carport.

As published by the council, reference 2026/1062/FUL

Application record

Reference
2026/1062/FUL
Category
Full applications
Status
Registered
Received
26 Aug 2026
Validated
26 Aug 2026
Ward
Exton Ward
Parish
Ashwell Parish Council
Decision by
Delegated Decision
Postcode
LE15 7SR

Timeline

Dates from the published record

  1. 26 Aug 2026

    Received by Rutland

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Rutland took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in St. Albans

3 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Rutland for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR

    2026/1093/LBA Submitted 1 Sep 2026 0m away

    91% historically approved · decision due ~27 Oct

    Alteration and lowering of the sitting room window. Middle section to incorporate a door.

    Awaiting decision Windows or glazing 15 docs
  • East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR

    2024/0909/FUL Submitted 19 Aug 2024 40m away

    External alterations to include 2 no. additional rooflights to the south elevation. Replace dormer window(s) on South & North elevations. Removal of existing velux window to East elevation. Painting of windows.

    Granted Full applications Loft or dormer Windows or glazing 27 docs
  • East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR

    2024/0910/LBA Submitted 19 Aug 2024 40m away

    Internal & external alterations to include 2 no. additional rooflights to the south elevation. Replace dormer window(s) on South & North elevations. Removal of existing velux window to East elevation. Painting of windows. Creation of new ensuite to bedroom 7 and new doorway (D9). Creation of a laundry room and new internal doorway (D7). Creation of ensuite to master bedroom to include new doorway (D8) & removal of chimneybreast. Installation of new cloakroom to boot room. Raise height of existing chimney breast to allow for Aga and extract unit. Creation of cloakroom and cupboard to study. Creation of bathroom and kitchenette on second floor.

    Granted Heritage and listed buildings Loft or dormer Windows or glazing 29 docs
  • Gallery House 2 Ashwell Hall Stables Ashwell Rutland LE15 7LH

    2025/1263/PTA Submitted 3 Oct 2025 41m away

    T1 Yew reduced by 3 metres all round to keep the tree in a reasonable shape and size for its location

    Granted Trees 5 docs
  • East Lodge 1 Ashwell Hall Stables Ashwell Rutland LE15 7LH

    2025/1300/PTA Submitted 13 Oct 2025 42m away

    T1 Lime reduced by 4 metres and sides reduced in to match to ensure tree keeps to a reasonable size for its location

    Granted Trees 5 docs
  • East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR

    2025/1011/LBA Submitted 15 Aug 2025 44m away

    Replacement of a existing timber & upvc capped glazed roof structure above the dining room with Anthracite powder coated aluminium frame glazed roof.

    Granted Heritage and listed buildings Windows or glazing 16 docs

In Rutland

  • 2026/1088/FUL Awaiting decision

    1 Tippings Lane Barrowden Rutland LE15 8EW

    Installation of new entrance gates & fencing to front of property.

    2 Sep 2026 Full applications
  • 2026/1075/FUL Awaiting decision

    Silver Birches 3B Top Road Ridlington Rutland LE15 9AX

    Demolition of conservatory and construction of single storey family room

    31 Aug 2026 Full applications
  • 2025/1635/FUL Withdrawn

    Land To The South Of Stonecrop House 5A Top Street Wing Rutland

    Installation of 14 no. photovoltaic panels along the north edge of a vegetable growing area.

    15 Dec 2025 Full applications
  • 2026/1059/FUL Awaiting decision

    66 Stockerston Road Uppingham Rutland LE15 9UD

    Single-storey extension to the existing bungalow to provide a garage.

    26 Aug 2026 Full applications
  • 2026/1055/FUL Awaiting decision

    34 Church Street Langham Rutland LE15 7JE

    Various external works including changing windows and front door, cladding, insulating the gables, change to roof tiles and addition of solar panels. Reinstate original driveway entrance, installation of post and rail fence.

    26 Aug 2026 Full applications