Skip to content
PlanIndex Get alerts
Menu

Planning application

38 Ash Road Aldershot Hampshire GU12 4EZ

Granted Rushmoor 21/00297/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear/side extension

As published by the council, reference 21/00297/FUL

Application record

Reference
21/00297/FUL
Type
Full Application
Status
Decided
Decision
Permission Granted
Received
14 Apr 2021
Validated
14 Apr 2021
Decided
13 May 2021
Ward
Aldershot Park
Decision by
Delegated
Postcode
GU12 4EZ

Timeline

Dates from the published record

  1. 14 Apr 2021

    Received by Rushmoor

  2. 13 May 2021

    Decision issued: Permission Granted

  3. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

39 applications on PlanIndex · across 4 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 52 Ash Road Aldershot Hampshire GU12 4EZ

    20/00125/FULPP Submitted 14 Feb 2020 48m away

    Erection of a single storey side and rear extension

    Granted Full applications Extension 17 docs
    Small domestic
  • 16 Ash Road Aldershot Hampshire GU12 4EZ

    20/00546/PDCPP Submitted 28 Jul 2020 57m away

    CERTIFICATE OF LAWFULNESS FOR PROPOSED DEVELOPMENT: Loft conversion to include L shaped rear dormer with 2 bedrooms and a shower room

    Decided Outline Loft or dormer 16 docs
  • 27 Gillian Close Aldershot Hampshire GU12 4HU

    20/00408/FULPP Submitted 18 Jun 2020 94m away

    Erection of a single-storey side/rear extension, front porch, garden room and retention of a tree house in the rear garden

    Granted Full applications Extension Trees 18 docs
    Small domestic
  • Garages To The Rear Of 13 To 23 Ash Road Aldershot Hampshire

    24/00429/FULPP Submitted 17 Jul 2024 108m away

    Erection of a pair of two-storey semi-detached 3-bedroom dwellings with continued use of existing vehicular access to Ash Road between Nos.19 & 21 Ash Road following demolition of twelve garages and an old derelict cottage (amended scheme to withdrawn application 24/00100/FULPP with amended plans received 3 September 2024)

    Granted Full applications Demolition 27 docs
  • 5 Coleman Road Aldershot Hampshire GU12 4BY

    20/00746/FULPP Submitted 6 Oct 2020 116m away

    Erection of a single storey rear extension and replacement of existing flat roof with new pitched roof

    Granted Full applications Extension 6 docs
    Small domestic
  • 16A Brighton Road Aldershot Hampshire GU12 4HQ

    20/00214/FULPP Submitted 26 Mar 2020 121m away

    Erection of a single storey rear extension

    Granted Full applications Extension 10 docs
    Small domestic

In Rushmoor

  • 26/00409/FULPP Decided

    116 Chapel Lane Farnborough Hampshire GU14 9BL

    Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.

    17 Jul 2026 Full applications
  • 26/00443/FUL Awaiting decision

    6A Alexandra Road Farnborough Hampshire GU14 6DA

    Front extension

    4 Aug 2026 Full applications
  • 26/00433/FUL Awaiting decision

    3 Churchill Avenue Aldershot Hampshire GU12 4JR

    Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area

    30 Jul 2026 Full applications
  • 26/00425/FUL Awaiting decision

    Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ

    Erection of a detached outbuilding

    28 Jul 2026 Full applications
  • 25/00257/FULPP Granted

    Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA

    Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area

    7 May 2025 Full applications