Skip to content
PlanIndex Get alerts
Menu

Planning application

Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ

Awaiting decision Rushmoor 26/00425/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a detached outbuilding

As published by the council, reference 26/00425/FUL

Application record

Reference
26/00425/FUL
Category
Full applications
Status
Registered
Received
28 Jul 2026
Validated
28 Jul 2026
Ward
Rowhill
Decision by
Delegated
Postcode
GU11 3LZ

Timeline

Dates from the published record

  1. 28 Jul 2026

    Received by Rushmoor

  2. 4 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Rushmoor took a median of 42 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 30 Ayling Lane Aldershot Hampshire GU11 3LZ

    20/00507/PDCPP Submitted 14 Jul 2020 0m away

    Lawful Development Certificate: Double hip to gable roof extension and rear crown roof dormer to facilitate a loft conversion

    Decided Outline Extension Loft or dormer 16 docs
  • Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ

    26/00426/LBC2 Submitted 28 Jul 2026 0m away

    96% historically approved · decision due ~24 Sep

    Erection of a detached outbuilding

    Awaiting decision 7 docs
  • 51 Ayling Lane Aldershot Hampshire GU11 3LZ

    20/00228/TPO Submitted 31 Mar 2020 38m away

    G1 Macracarpa Cypress - overall crown pruning by up to 1.5m, to suitable growth points (G1 of TPO461)

    Granted Trees 7 docs
  • Friars Keep 41 Manor Road Aldershot Hampshire GU11 3DG

    21/00149/CATPP Submitted 1 Mar 2021 51m away

    T1 Front Garden - 25% overall reduction of the tree and remove dead branches. T2 and T3 Rear Garden - two sycamore trees reduce by 30% (trees with within Cargate Avenue Conservation Area)

    Granted Trees 7 docs
  • 30 Ayling Lane Aldershot Hampshire GU11 3LZ

    21/00036/EDCPP Submitted 18 Jan 2021 52m away

    Lawful Development Certificate for an existing development: Double hip to gable crown roof rear dormer to include 3 rooflights to the front elevation and 2 UPVC windows to the rear elevation

    Decided Lawful development Loft or dormer Windows or glazing 10 docs
  • 37 Ayling Lane Aldershot Hampshire GU11 3LZ

    24/00572/FULPP Submitted 17 Sep 2024 58m away

    Erection of two-storey and single-storey front, side and rear extensions - alternative to development approved under planning permission 23/00685/FULPP

    Granted Full applications Extension
    Small domestic

In Rushmoor

  • 26/00409/FULPP Decided

    116 Chapel Lane Farnborough Hampshire GU14 9BL

    Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.

    17 Jul 2026 Full applications
  • 26/00443/FUL Awaiting decision

    6A Alexandra Road Farnborough Hampshire GU14 6DA

    Front extension

    4 Aug 2026 Full applications
  • 26/00433/FUL Awaiting decision

    3 Churchill Avenue Aldershot Hampshire GU12 4JR

    Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area

    30 Jul 2026 Full applications
  • 25/00257/FULPP Granted

    Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA

    Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area

    7 May 2025 Full applications
  • 25/00620/FULPP Withdrawn

    177 Ash Road Aldershot Hampshire GU12 4DB

    Two storey side and single storey first floor side/rear extensions; roof extension with gable ends and rear dormers and internal and external alterations including installation of windows to create additional 3no 1-bed flats (total of 8) in mixed use building

    18 Nov 2025 Full applications