Planning application
52 Ash Road Aldershot Hampshire GU12 4EZ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey side and rear extension
As published by the council, reference 20/00125/FULPP
Application record
- Reference
- 20/00125/FULPP
- Type
- Full App via planning portal
- Status
- Decided
- Decision
- Permission Granted
- Received
- 14 Feb 2020
- Validated
- 14 Feb 2020
- Decided
- 30 Apr 2020
- Ward
- Aldershot Park
- Decision by
- Service Mananger
- Postcode
- GU12 4EZ
Timeline
Dates from the published record
-
14 Feb 2020
Received by Rushmoor
-
30 Apr 2020
Decision issued: Permission Granted
-
4 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in The Sands Farnham
39 applications on PlanIndex · across 9 councils · 84% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
38 Ash Road Aldershot Hampshire GU12 4EZ
Erection of a single storey rear/side extension
Granted Full applications Extension 9 docsSmall domestic -
27 Gillian Close Aldershot Hampshire GU12 4HU
Erection of a single-storey side/rear extension, front porch, garden room and retention of a tree house in the rear garden
Granted Full applications Extension Trees 18 docsSmall domestic -
5 Coleman Road Aldershot Hampshire GU12 4BY
Erection of a single storey rear extension and replacement of existing flat roof with new pitched roof
Granted Full applications Extension 6 docsSmall domestic -
16 Ash Road Aldershot Hampshire GU12 4EZ
CERTIFICATE OF LAWFULNESS FOR PROPOSED DEVELOPMENT: Loft conversion to include L shaped rear dormer with 2 bedrooms and a shower room
Decided Outline Loft or dormer 16 docs -
2A Institute Road Aldershot Hampshire GU12 4DA
Formation of a hipped to gable roof to form a dormer within rear facing roof slope, roof lights within front facing roof slope to provide living space within the loft
Granted Full applications Loft or dormer 20 docs -
Garages To The Rear Of 13 To 23 Ash Road Aldershot Hampshire
Erection of a pair of two-storey semi-detached 3-bedroom dwellings with continued use of existing vehicular access to Ash Road between Nos.19 & 21 Ash Road following demolition of twelve garages and an old derelict cottage (amended scheme to withdrawn application 24/00100/FULPP with amended plans received 3 September 2024)
Granted Full applications Demolition 27 docs
Other full applications applications
In Rushmoor
-
26/00409/FULPP Decided
116 Chapel Lane Farnborough Hampshire GU14 9BL
Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.
-
26/00443/FUL Awaiting decision
6A Alexandra Road Farnborough Hampshire GU14 6DA
Front extension
-
26/00433/FUL Awaiting decision
3 Churchill Avenue Aldershot Hampshire GU12 4JR
Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area
-
26/00425/FUL Awaiting decision
Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ
Erection of a detached outbuilding
-
25/00257/FULPP Granted
Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA
Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area