Planning application
R26/0566
Parcel E (Miller Homes), Houlton (Rugby Radio Station), Key Phase 4, Watling Street, Rugby, CV23 0AS
Proposal
Application for the approval of details relating to condition 4 (raised landscape bays) of R25/0549 (for the erection of 216 dwellings)
As published by the council, reference R26/0566
Timeline
Dates from the published record
-
8 Jun 2026
Received by Rugby
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Rugby for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
R26/0170 Awaiting decision
Parcel E (Miller Homes), Houlton (Rugby Radio Station), Key Phase 4, Watling Street, Rugby, CV23 0AS
Details of condition 17 (Code of Construction Practice) of R17/0022. Outline application for an urban extension to Rugby for up to 6,200 dwellings together with up to 12,000sqm retail (A1), up to 3,500sqm financial services (A2) and restaurants (A3 - A5), up to 3,500sqm for a hotel (C1), up to 2,900sqm of community uses (D1), up to 3,100sqm assembly and leisure uses (D2), 31 hectares (up to 106,000sqm) of commercial and employment space (B1, B2 and B8), and ancillary facilities; a mixed use district centre and 3 subsidiary local centres including retention and re-use of the existing buildings known as 'C' Station (Grade II listed), 'A' Station and some existing agricultural buildings; a secondary school and 3 primary schools; public art; green infrastructure including formal and informal open space and amenity space; retention of existing hedgerows, areas of ridge and furrow and grassland; new woodland areas, allotments and areas for food production, wildlife corridors; supporting infrastructure (comprising utilities including gas, electricity, water, sewerage, telecommunications, and diversions as necessary); sustainable drainage systems including ponds, lakes and water courses; a link road connecting the development to Butlers Leap, estate roads and connections to the surrounding highway, cycleway and pedestrian network; ground remodelling; any necessary demolition and any ground works associated with the removal of any residual copper matting, with all matters reserved for future determination except the three highway junctions on the A428, the two junctions on the A5 and the link road junctions at Butlers Leap and Hillmorton Lane Variation of condition 5 attached to outline planning permission R11/0699 dated 21/05/2014 to cover minor material changes to the approved Parameter Plans and Development Specification and deletion and/or amendment of conditions already discharged to reflect approvals already granted pursuant to the outline planning permission.
-
R26/0327 Awaiting decision
Parcel 23 (Morris Homes), Houlton (Rugby Radio Station), Key Phase 4, Watling Street, Rugby, CV23 0AS
Erection of 78 dwellings and associated works and development including access roads, parking and garages (application for approval of reserved matters relating to access, appearance, landscaping, layout and scale pursuant to outline planning permission R17/0022).
-
R26/0156 Refused
1, Anthorn Close, Rugby, CV23 1EU
Variation of condition 2 and 3 of R24/1133 to revise plans, drawings and materials as changes during construction. (Proposed single storey side extension.)
Other conditions applications
In Rugby
-
R26/0720 Awaiting decision
LANDSCAPE VIEW, MAIN STREET, WILLEY, RUGBY, CV23 0SH
Details of conditions 3 (External Materials), 9 (Drainage Strategy) and 12 (Biodiversity Management Plan) of R26/0277. 1no. 4 bedroom self build dwelling with associated driveway and attached double garage.
-
R26/0711 Awaiting decision
LAND AT PADGE HALL FARM, WATLING STREET, BURBAGE
Details of condition 8 (Employment and Training Statement) of R24/0081. (Variation of Condition 1-plans, 14- Surface Water Drainage Scheme, 46- approved detail including drainage and 48- flood risk assessment attached to R21/0985 (Hybrid planning application comprising: Outline application (all matters reserved except for site access from the A5) for the demolition of existing structures and the erection of distribution and industrial buildings (Use Class B2 and B8) including ancillary offices and associated earthworks, infrastructure and landscaping, and highways improvements at Dodwells roundabout; a Full application for the development of a distribution building (Use Class B8), including ancillary offices with associated access, hard standing, parking, and on plot landscaping. The proposals include improvements to the existing railway bridge on the A5 Watling Street including increased height clearance. This is a cross boundary application with Hinckley and Bosworth Borough Council and Nuneaton and Bedworth Borough Council (EIA development.) dated 20th December 2023.
-
R26/0712 Awaiting decision
LAND AT PADGE HALL FARM, WATLING STREET, BURBAGE
Details of condition 3 (Materials) of R24/0081. (Variation of Condition 1-plans, 14- Surface Water Drainage Scheme, 46- approved detail including drainage and 48- flood risk assessment attached to R21/0985 (Hybrid planning application comprising: Outline application (all matters reserved except for site access from the A5) for the demolition of existing structures and the erection of distribution and industrial buildings (Use Class B2 and B8) including ancillary offices and associated earthworks, infrastructure and landscaping, and highways improvements at Dodwells roundabout; a Full application for the development of a distribution building (Use Class B8), including ancillary offices with associated access, hard standing, parking, and on plot landscaping. The proposals include improvements to the existing railway bridge on the A5 Watling Street including increased height clearance. This is a cross boundary application with Hinckley and Bosworth Borough Council and Nuneaton and Bedworth Borough Council (EIA development.) dated 20th December 2023.
-
R26/0703 Awaiting decision
1 CALDECOTT STREET, RUGBY, CV21 3TH
Details of conditions 3 (Materials), 4 (Boundary Treatment) and 12 (Bat & Bird Box) of R26/0132. (1no. replacement dwellinghouse on the footprint of a previously existing lawful residential property and other associated works.)
-
R26/0700 Awaiting decision
Boots Farm, Straight Mile, Bourton-on-Dunsmore, Warwickshire, CV23 9QQ
Details of condition 5 (Drainage) of R23/0421. (Open storage and parking of HGV tractor units/trailers and siting of a security hut for a temporary period of 5 years.)