Skip to content
PlanIndex Get alerts
Menu

Planning application

R25/0901

HILLMORTON WHARF, CRICK ROAD, RUGBY, CV21 4PW

Awaiting decision Rugby Conditions

Proposal

Details of condition 5 (Materials), 23 (Lighting), 11 (Surface Water Scheme), 12 (Management and Maintenance Scheme) 19 (Air Quality) and 8 (Bin and Cycle Store) of R24/0638 (Use of Land for the Siting of 23 no. Mobile Timber Holiday Lodges with Associated Works)

As published by the council, reference R25/0901

Timeline

Dates from the published record

  1. 8 Oct 2025

    Received by Rugby

  2. 13 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rugby for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • R23/0261 Granted

    THE WATERSIDE, CRICK ROAD, RUGBY, CV21 4PW

    The retention of existing temporary telecommunications base station for a further 12 months consisting of 1No. 28m high temporary mast supporting 3No. antenna apertures & 1No. 600mm dish; installation of 6No. cabinets; ancillary development thereto.

    24 Feb 2023 79m away Outline
  • R26/0575 Awaiting decision

    14, Moors Lane, Rugby, Warwickshire, CV23 1BT

    Installation of air source heat pump to rear of property

    4 Jun 2026 464m away Outline
  • R25/0992 Awaiting decision

    10, Sidings Way, Rugby, CV21 4PR

    Proposed landscaping/levelling of garden.

    10 Nov 2025 499m away Outline

In Rugby

  • R26/0720 Awaiting decision

    LANDSCAPE VIEW, MAIN STREET, WILLEY, RUGBY, CV23 0SH

    Details of conditions 3 (External Materials), 9 (Drainage Strategy) and 12 (Biodiversity Management Plan) of R26/0277. 1no. 4 bedroom self build dwelling with associated driveway and attached double garage.

    27 Jul 2026 Conditions
  • R26/0711 Awaiting decision

    LAND AT PADGE HALL FARM, WATLING STREET, BURBAGE

    Details of condition 8 (Employment and Training Statement) of R24/0081. (Variation of Condition 1-plans, 14- Surface Water Drainage Scheme, 46- approved detail including drainage and 48- flood risk assessment attached to R21/0985 (Hybrid planning application comprising: Outline application (all matters reserved except for site access from the A5) for the demolition of existing structures and the erection of distribution and industrial buildings (Use Class B2 and B8) including ancillary offices and associated earthworks, infrastructure and landscaping, and highways improvements at Dodwells roundabout; a Full application for the development of a distribution building (Use Class B8), including ancillary offices with associated access, hard standing, parking, and on plot landscaping. The proposals include improvements to the existing railway bridge on the A5 Watling Street including increased height clearance. This is a cross boundary application with Hinckley and Bosworth Borough Council and Nuneaton and Bedworth Borough Council (EIA development.) dated 20th December 2023.

    23 Jul 2026 Conditions
  • R26/0712 Awaiting decision

    LAND AT PADGE HALL FARM, WATLING STREET, BURBAGE

    Details of condition 3 (Materials) of R24/0081. (Variation of Condition 1-plans, 14- Surface Water Drainage Scheme, 46- approved detail including drainage and 48- flood risk assessment attached to R21/0985 (Hybrid planning application comprising: Outline application (all matters reserved except for site access from the A5) for the demolition of existing structures and the erection of distribution and industrial buildings (Use Class B2 and B8) including ancillary offices and associated earthworks, infrastructure and landscaping, and highways improvements at Dodwells roundabout; a Full application for the development of a distribution building (Use Class B8), including ancillary offices with associated access, hard standing, parking, and on plot landscaping. The proposals include improvements to the existing railway bridge on the A5 Watling Street including increased height clearance. This is a cross boundary application with Hinckley and Bosworth Borough Council and Nuneaton and Bedworth Borough Council (EIA development.) dated 20th December 2023.

    23 Jul 2026 Conditions
  • R26/0703 Awaiting decision

    1 CALDECOTT STREET, RUGBY, CV21 3TH

    Details of conditions 3 (Materials), 4 (Boundary Treatment) and 12 (Bat & Bird Box) of R26/0132. (1no. replacement dwellinghouse on the footprint of a previously existing lawful residential property and other associated works.)

    21 Jul 2026 Conditions
  • R26/0700 Awaiting decision

    Boots Farm, Straight Mile, Bourton-on-Dunsmore, Warwickshire, CV23 9QQ

    Details of condition 5 (Drainage) of R23/0421. (Open storage and parking of HGV tractor units/trailers and siting of a security hut for a temporary period of 5 years.)

    20 Jul 2026 Conditions