Planning application
Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction and operation of 17 wind turbines with a maximum height to the tip of the blade of 180 metres (above ordnance datum), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm.
As published by the council, reference 2025/0267
Application record
- Reference
- 2025/0267
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 2 Jul 2025
- Validated
- 7 Aug 2025
- Ward
- Hareholme And Waterfoot
Timeline
Dates from the published record
-
2 Jul 2025
Received by Rossendale
-
7 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rossendale took a median of 84 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
337 documents on file for this application
- T PICKUP - OBJECTION & REGULATION 25 REQUEST REDACTED
- T PICKUP - FIGURE 1 - CUMULATIVE ZONE OF THEORETICAL VISIBILITY
- T PICKUP - APPENDIX B - SETTLEMENTS WITHIN THE OVERLAP
- T PICKUP - APPENDIX A - METHOD NOTE AND VERIFICATION
- NATIONAL HIGHWAYS - COMMENTS 12.06.2026
- A BILLINGSLEY - OBJECTION - ANALYSIS OF INTERCONNECTION ROADS SCOUT MOOR 2
- JBA CONSULTING COMMENTS
- A GERDES - OBJECTION
- NATIONAL HIGHWAYS - COMMENTS 11.03.2026 REDACTED
- LCC PUBLIC RIGHTS OF WAY - COMMENTS
- METRICA - COMMENTS
- NATURAL ENGLAND - (UPDATED COMMENTS)
- LCC MINERALS PLANNING TEAM - COMMENTS
- BURY DEVELOPMENT MANAGEMENT - COMMENTS.
- NATURAL ENGLAND - COMMENTS
- NATIONAL HIGHWAYS COMMENTS
- LLFA - FURTHER COMMENTS
- GROWTH LANCASHIRE - COMMENTS
- A RAWSTERNE - OBJECTION 08.12.2025 01 SCOUT MOOR NOISE OBJECTION LETTER
- A RAWSTERNE - OBJECTION 08.12.2025 02 CONTENTS PAGE - GROS CONS REF 2025_0267 SC
- A RAWSTERNE - OBJECTION 08.12.2025 03 GROSVENOR CONSULTANCY REF 2025_0267 SCOUT
- A RAWSTERNE - OBJECTION 08.12.2025 04 ANNEX 1. GROS CONS - SCOUT MOOR 2 - RESIDE
- A RAWSTERNE - OBJECTION 08.12.2025 05 ANNEX 1A. GROS CONS -SCOUT MOOR 2 - RESIDE
- A RAWSTERNE - OBJECTION 08.12.2025 06 ANNEX 2 SCOUT MOOR INWG_WP1_11_NOV_2015_ D
- A RAWSTERNE - OBJECTION 08.12.2025 07 ANNEX 3 SCOUT MOOR 2 - IOA VOL. 37. PT.2 2
- A RAWSTERNE - OBJECTION 08.12.2025 08 ANNEX 4. GROS CONS SCOUT MOOR 2 RITA HOLME
- A RAWSTERNE - OBJECTION 08.12.2025 09 ANNEX 5. GROS CONS - SCOUT MOOR 2 IARO-COM
- A RAWSTERNE - OBJECTION 08.12.2025 10 ANNEX 6. GROS CONS SCOUT MOOR 2 INWG ANALY
- A RAWSTERNE - OBJECTION 08.12.2025 11 ANNEX 7. GROS CONS SCOUT MOOR 2 - IARO RES
- A RAWSTERNE - OBJECTION 08.12.2025 12 ANNEX 8. CROS CONS SCOUT MOOR 2. PEER REVI
- A RAWSTERNE - OBJECTION 08.12.2025 13 ANNEX 9. GROS CONS SCOUT MOOR 2. MEETING M
- A RAWSTERNE - OBJECTION 08.12.2025 14 ANNEX 10. GROS CONS SCOUT MOOR 2. IARO CHA
- A RAWSTERNE - OBJECTION 08.12.2025 15 ANNEX 11. CROS CONS SCOUT MOOR 2- IRE-2024
- A RAWSTERNE - OBJECTION 08.12.2025 16 ANNEX 11A GROS CONS SCOUT MOOR 2. EXTRACTS
- A RAWSTERNE - OBJECTION 08.12.2025 17 ANNEX 12. GROS CONS SCOUT MOOR 2. 2025_IEH
- A RAWSTERNE - OBJECTION 08.12.2025 18 ANNEX 12A. GROS CONS SCOUT MOOR 2 - EXTRAC
- A RAWSTERNE - OBJECTION 08.12.2025 19 ANNEX 13. GROS CONS SCOUT MOOR 2. WTN DANI
- A RAWSTERNE - OBJECTION 08.12.2025 20 ANNEX 14. GROS CONS SCOUT MOOR 2. FINNISH
- BARTON AERODROME - COMMENTS
- A & A GIBSON - OBJECTION REDACTED
- FRIENDS OF THE EARTH - SUPPORTING COMMENT
- RSPB - COMMENTS REDACTED
- HYNDBURN BC - COMMENTS REDACTED
- I & M TATTERSALL - OBJECTION REDACTED
- P SUTHERLAND - OBJECTION
- PETER DAWSON - OBJECTION
- JOANNE ASH - OBJECTION
- LCC HIGHWAYS - COMMENTS
- LANCASHIRE WILDLIFE TRUST - COMMENTS
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 02.11.2025 REDACTED
- N MORRELL - OBJECTION
- NORDEN AREA FORUM - OBJECTION
- JANE MURPHY - OBJECTION
- OBJECTION S THORPE
- OBJECTION K THORPE
- KAREN COWLEY - OBJECTION
- MARGARET TURNER - OBJECTION
- J HIGNETT - FURTHER OBJECTION REDACTED
- C HIGNETT - FURTHER OBJECTION REDACTED
- PAUL BUCHANAN - OBJECTION
- ECOLOGY - COMMENTS
- ROSSENDALE CIVIC TRUST - COMMENTS
- J COLLINS - OBJECTION - SUPPORTING DOCUMENTS - NOT REDACTED AS REQUESTED BY J CO
- J COLLINS - OBJECTION - PUBLIC SUBMISSIONS ON SCOUT MOORE IIM - NOT REDACTED AS
- J COLLINS - OBJECTION - COVER LETTER - NOT REDACTED AS REQUESTED BY J COLLINS
- NATIONAL TRUST - COMMENTS REDACTED
- UNITED UTILITIES - COMMENTS
- MET OFFICE - COMMENTS
- SUSAN HARRISON - OBJECTION
- APPLICANT RESPONSE TO PUBLIC QUERIES
- ANN ELMER - REDACTED - OBJECTION
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 07.10.2025 REDACTED
- J NEWCOMBE - FURTHER OBJECTION
- S DAVISON - OBJECTION
- K BENTHAM - OBJECTION REDACTED
- GARDENS TRUST - COMMENTS REDACTED
- SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENT
- SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT
- HISTORIC ENGLAND - COMMENTS
- MHCLG EMAIL 20TH AUGUST 2025
- MHCLG EMAIL 27TH AUGUST 2025
- MHCLG EMAIL 29TH SEPTEMBER 2025
- NBH BRIDLEWAYS ASSOCIATION - COMMENTS
- W WRIGHT - OBJECTION
- SMWFII CARBON CALCULATOR
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 29.09.2025 REDACTED
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 27.09.2025 REDACTED
- ENVIRONMENTAL PROTECTION - COMMENTS
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 26.09.2025 REDACTED
- LCC HISTORIC ENVIRONMENT TEAM - COMMENTS REDACTED
- LLFA RESPONSE
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 24.09.2025 REDACTED
- S & C HIGGINBOTHAM - OBJECTION
- M HIGGINBOTHAM - OBJECTION
- E DALBY - OBJECTION
- JOHN BURNS - OBJECTION
- RBC CLIMATE CHANGE - COMMENTS REDACTED
- ENVIRONMENT AGENCY - COMMENTS
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 22.09.2025 REDACTED
- JOHN NEWCOMBE ON BEHALF OF THE P&BFCA VILLAGE HERITAGE ASSET - OBJECTION
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 20.09.2025 REDACTED
- THE COAL AUTHORITY - COMMENTS
- MAG SAFEGUARDING - COMMENTS
- POLICE ARCHITECTURAL LIAISON - COMMENTS
- J HIGNETT - OBJECTION REDCATED
- C HIGNETT - OBJECTION REDACTED
- C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - FURTHER OBJECTION REDACTED
- HEALTH & SAFETY EXECUTIVE - FURTHER COMMENTS
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 REDACTED
- COUNCIL OF BRITISH ARCHAEOLOGY - COMMENTS REDACTED
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 1
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT B
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 2 ATTACHMENT A
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 3
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 4
- A RAWSTERNE ON BEHALF OF RMNF - OBJECTION 10.09.2025 5
- HEALTH & SAFETY EXECUTIVE - COMMENTS
- A RAWSTERNE ON BEHALF OF ROOLEY MOOR NEIGHBOURHOOD FORUM-OBJECTION REDACTED
- NATS SAFEGUARDING - COMMENTS
- BOLTON COUNCIL - COMMENTS
- BURNLEY COUNCIL - FURTHER COMMENTS
- BURNLEY COUNCIL - COMMENTS REDACTED
- CANAL & RIVER TRUST - COMMENTS
- NEIL GRAYSON - OBJECTION
- C PEAT FOREST OF ROSSENDALE BRIDLEWAYS ASSOCIATION - OBJECTION REDACTED
- DAVID TRIVETT - FURTHER OBJECTION
- S FLETCHER - OBJECTION
- K FLETCHER - OBJECTION
- J WHITEHEAD ON BEHALF OF SAY NO TO SCOUT MOOR 2 GROUP - OBJECTION
- DAVID TRIVETT - OBJECTION
- RMNF - OBJECTION
- DATED JULY 2025 - OUTLINE DECOMMISSIONING STRATEGY
- DATED JULY 2025 - SECTION 106 HEAD OF TERMS
- BNG ADDENDUM
- VISUALISATIONS (CH)
- OWNERSHIP SCHEDULE
- T HUNTER - SUPPORT
- DATED JULY 2025 - PLANNING DESIGN AND ACCESS STATEMENT
- APPLICATION FORM REDACTED
- COVERING LETTER
- SK01 REV P1 - SITE LOCATION PLAN
- SK02 REV P1 - INFRASTRUCTURE LAYOUT
- SK03 REV P1 - INFRASTRUCTURE LAYOUT - CONSTRUCTION PHASE
- SK04 REV P2 - INFRASTRUCTURE LAYOUT - OPERATIONAL PHASE
- SK16 REV 2 - CROSSING PLAN & SECTION
- SK17 REV 2 - CROSSING PLAN VIEW
- SK18 REV 2 - CROSSING CONSTRUCTION DETAIL
- SK19 REV 2 - ACCESS DESIGN GA
- SK21 REV 2 - LAYDOWN AND JUNCTION GA
- SK20 REV 2 - ACCESS DESIGN SWEPT PATH
- SK22 REV 2 - LAYDOWN AND JUNCTION SWEPT PATH
- SK15 REV 2 - TYPICAL WATERCOURSE CROSSING METHODS
- SK14 REV 2 - TYPICAL TRACK DETAILS
- SK13 REV 2 - TYPICAL COMPOUND FENCING
- SK12 REV 2 - TYPICAL CONSTRUCTION COMPOUND
- SK11 REV 2 - INDICATIVE ONSITE SUBSTATION ELEVATION
- SK10 REV 2 - INDICATIVE ONSITE SUBSTATION LAYOUT
- SK09 REV 2 - TYPICAL CABLE TRENCH DETAIL
- SK08 REV 2 - TYPICAL CRANE HARDSTANDING DETAIL
- SK07 REV 2 - TYPICAL TURBINE FOUNDATION DETAIL
- SK06 REV 2 - TYPICAL TURBINE ELEVATION
- SK05 REV P1 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONING PLAN
- VERSION 6 (DATED 20/05/2025) - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS PO
- 230509 REV S01 - DRAINAGE STRATEGY
- 8706 HMMP REV 3 - HABITAT MANAGEMENT AND MONITORING PLAN (REV 3)
- 8706 MRMP REV 5 - MOORLAND RESORATION AND MANAGEMENT PLAN (REV 5)
- DATED JUNE 2025 - OUTDOOR ACCESS MANAGEMENT & ENHANCEMENT PLAN
- J10-15729B-10 F2 - AIR QUALITY ASSESSMENT
- DATED 07 MAY 2025 - AVIATION AND MET RADAR IMPACT ASSESSMENT
- FIGURE 3A - RESIDENTIAL VISUAL AMENITY ASSESSMENT
- FIGURE 3B - RESIDENTIAL VISUAL AMENITY ASSESSMENT
- 130125 REV P03 - FLOOD RISK ASSESSMENT
- DATED JUNE 2025 - HEALTH IMPACT ASSESSMENT
- 109692-PEF-ZZ-XX-RP-GG-7002 P03 - MINERAL RESOURCE ASSESSMENT
- 109692-PEF-ZZ-XX-RP-GG-6001 P03 - PRELIMINARY RISK ASSESSMENT
- DATED JUNE 2005 - RESIDENTIAL VISUAL AMENITY ASSESSMENT (RVAA)
- ANNEX 3 - RESIDENTIAL VISUAL AMENITY ASSESSMENT DETAILED PROPERTY ASSESSMENT SHE
- FIGURE 1 - RESIDENTIAL VISUAL AMENITY ASSESSMENT
- FIGURE 2 - RESIDENTIAL VISUAL AMENITY ASSESSMENT
- DATED JUNE 2025 - RESIDENTIAL VISUAL AMENITY ASSESSMENT VISUALS
- DATED JUNE 2025 - SUSTAINABILITY ENERGY & CLIMATE CHANGE STATEMENT
- 13110B ISSUE 03 - TELECOMMUNICATIONS IMPACT ASSESSMENT
- 250330 V2 - TRANSPORT ASSESSMENT
- DATED JUNE 2025 - ECONOMIC AND SOCIAL BENEFITS STATEMENT
- 109692-PEF-ZZ-XX-RP-GT-6001 P01 - MINING RISK ASSESSMENT
- 01137 SMII ES V4 - NON-TECHNICAL SUMMARY
- 01137 SMII ES V3 - ENVIRONMENTAL MANAGEMENT PLAN
- 01137 SMII ES V2 APPENDIX 1.1 - REQUIRED INFORMATION
- 01137 SMII ES V2 - CONTENTS PAGE
- 01137 SMII ES V2 APPENDIX 9.4 - GCN TECHNICAL APPENDIX
- 01137 SMII ES V2 APPENDIX 9.3 - BAT SURVEYS TECHNICAL APPENDIX
- 01137 SMII ES V2 APPENDIX 9.2 - PROTECTED SPECIES TECHNICAL APPENDIX
- 01137 SMII ES V2 APPENDIX 9.1
- 01137 SMII ES V2 APPENDIX 7.2 - OPERATIONAL NOISE REPORT
- 01137 SMII ES V2 APPENDIX 7.1 - CONSTRUCTION NOISE REPORT
- 01137 SMII ES V2 APPENDIX 6.1 - TRANSPORT ASSESSMENT
- 01137 SMII ES V2 APPENDIX 2.3 - NON-STATUTORY CONSULTATION COMMENTS
- 01137 SMII ES V2 APPENDIX 2.2 - STATUTORY CONSULTATION COMMENTS
- 01137 SMII ES V2 APPENDIX 2.1 - EIA SCOPING REPORT
- 01137 SMII ES V2 APPENDIX 15.1 - CARBON CALCULATOR INPUT DATA & RESULTS
- 01137 SMII ES V2 APPENDIX 14.9 - PEAT CONDITION ASSESSMENT
- 01137 SMII ES V2 APPENDIX 14.8 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMS
- 01137 SMII ES V2 APPENDIX 14.7 - PUBLIC WATER SUPPLY ASSESSMENT
- 01137 SMII ES V2 APPENDIX 14.6 - PRIVATE WATER SUPPLY ASSESSMENT
- 01137 SMII ES V2 APPENDIX 14.5 - WATERCOURSE CROSSING INVENTORY
- 01137 SMII ES V2 APPENDIX 14.4 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT
- 01137 SMII ES V2 APPENDIX 14.3 - OUTLINE PEAT MANAGEMENT PLAN
- 01137 SMII ES V2 APPENDIX 14.2 - PEAT SURVEY REPORT
- 01137 SMII ES V2 APPENDIX 14.1 - GOOD PRACTICE METHODS
- 01137 SMII ES V2 APPENDIX 13.1 - ARCHAEOLOGICAL DESK BASED ASSESSMENT
- 01137 SMII ES V2 APPENDIX 12.2-12.6 - NEARBY DESIGNATED HERITAGE ASSETS STUDY
- 01137 SMII ES V2 APPENDIX 12.1 - HERITAGE ASSESSMENT
- 01137 SMII ES V2 APPENDIX 11.5 - LANDSCAPE SENSITIVITY
- 01137 SMII ES V2 APPENDIX 11.4 - VIEWPOINT ANALYSIS
- 01137 SMII ES V2 APPENDIX 11.3 - LANDSCAPE CHARACTER BASELINE
- 01137 SMII ES V2 APPENDIX 11.2 - VISUALS METHODOLOGY
- 01137 SMII ES V2 APPENDIX 11.1 - LVIA METHODOLOGY
- 01137 SMII ES V2 APPENDIX 10.3 - ORNITHOLOGY REPORT YEAR 3
- 01137 SMII ES V2 APPENDIX 10.2 - ORNITHOLOGY REPORT YEAR 2
- 01137 SMII ES V2 APPENDIX 10.1 - ORNITHOLOGY REPORT YEAR 1
- 01137 SMII ES V2 APPENDIX 1.2 - SCHEDULE OF COMPETENCE
- 01137 SMII ES V1 FIGURE 9.8 - PEATLAND RESTORATION PROPOSALS
- 01137 SMII ES V1 FIGURE 9.7 - POST DEVELOPMENT HABITATS
- 01137 SMII ES V1 FIGURE 9.6 - EDNA RESULTS
- 01137 SMII ES V1 FIGURE 9.5 - BAT STATIC LOCATIONS
- 01137 SMII ES V1 FIGURE 9.3 - NVC BASELINE FIGURE
- 01137 SMII ES V1 FIGURE 9.2 - UKHAB BASELINE FIGURE
- 01137 SMII ES V1 FIGURE 9.1B - DESIGNATED SITES WITHIN 10KM
- 01137 SMII ES V1 FIGURE 9.1A - DESIGNATED SITES WITHIN 10KM
- 01137 SMII ES V1 FIGURE 8.1 - SHADOW FLICKER ASSESSMENT LOCATIONS
- 01137 SMII ES V1 FIGURE 7.1 - CONSTRUCTION NOISE ASSESSMENT
- 01137 SMII ES V1 FIGURE 4.23 - INFRASTRUCTURE LAYOUT - INDICATIVE DECOMMISSIONIN
- 01137 SMII ES V1 FIGURE 4.22 - PROPOSED INDICATIVE FENCING LAYOUT WITH ACCESS PO
- 01137 SMII ES V1 FIGURE 4.21 - TYPICAL WATER CROSSING METHODS
- 01137 SMII ES V1 FIGURE 4.20 - TYPICAL TRACK DETAILS
- 01137 SMII ES V1 FIGURE 4.19 - TYPICAL COMPOUND FENCING
- 01137 SMII ES V1 FIGURE 4.18 - TYPICAL CONSTRUCTION COMPOUND
- 01137 SMII ES V1 FIGURE 4.17 - INDICATIVE ONSITE SUBSTATION ELEVATION
- 01137 SMII ES V1 FIGURE 4.16 - INDICATIVE ONSITE SUBSTATION LAYOUT
- 01137 SMII ES V1 FIGURE 4.15 - TYPICAL CABLE TRENCH DETAIL
- 01137 SMII ES V1 FIGURE 4.14 - TYPICAL CRANE HARDSTANDING
- 01137 SMII ES V1 FIGURE 4.13 - TYPICAL TURBINE FOUNDATION DETAIL
- 01137 SMII ES V1 FIGURE 4.12 - TYPICAL TURBINE ELEVATION
- 01137 SMII ES V1 FIGURE 4.11 - AVIATION LIGHTING PLAN
- 01137 SMII ES V1 FIGURE 4.10 - LAYDOWN AREA AND JUNCTION SWEPT PATH ASSESSMENT
- 01137 SMII ES V1 FIGURE 4.09 - ACCESS DESIGN SWEPT PATH ASSESSMENT
- 01137 SMII ES V1 FIGURE 4.08 - LAYDOWN AREA AND JUNCTION GENERAL ARRANGEMENT
- 01137 SMII ES V1 FIGURE 4.07 - ACCESS DESIGN GENERAL ARRANGEMENT
- 01137 SMII ES V1 FIGURE 4.06 - CROSSING CONSTRUCTION DETAIL
- 01137 SMII ES V1 FIGURE 4.05 - CROSSING PLAN & LONGITUDINAL SECTION
- 01137 SMII ES V1 FIGURE 4.04 - PLAN VIEW
- 01137 SMII ES V1 FIGURE 4.03 - INFRASTRUCTURE LAYOUT - OPERATIONAL STAGE
- 01137 SMII ES V1 FIGURE 4.02 - INFRASTRUCTURE LAYOUT - CONSTRUCTION STAGE
- 01137 SMII ES V1 FIGURE 4.01 - INFRASTRUCTURE LAYOUT
- VISUALISATIONS (NS)
- 01137 SMII ES V1 - CONTENTS PAGE
- 01137 SMII ES V1 - CHAPTER 9 ECOLOGY
- 01137 SMII ES V1 - CHAPTER 8 SHADOW FLICKER
- 01137 SMII ES V1 - CHAPTER 7 NOISE AND VIBRATION
- 01137 SMII ES V1 - CHAPTER 6 TRANSPORT AND ACCESS
- 01137 SMII ES V1 - CHAPTER 5 CONSIDERATION OF ALTERNATIVES
- 01137 SMII ES V1 - CHAPTER 4 DEVELOPMENT SPECIFICATION
- 01137 SMII ES V1 - CHAPTER 3 ASSESSMENT BOUNDARY CONTEXT 010625
- 01137 SMII ES V1 - CHAPTER 2 APPROACH TO EIA
- 01137 SMII ES V1 - CHAPTER 17 SUMMARY
- 01137 SMII ES V1 - CHAPTER 16 ASSESSMENT OF CUMULATIVE EFFECTS
- 01137 SMII ES V1 - CHAPTER 15 CLIMATE CHANGE
- 01137 SMII ES V1 - CHAPTER 14 HYDROLOGY, HYDROGEOLOGY AND PEA
- 01137 SMII ES V1 - CHAPTER 13 ARCHAEOLOGY
- 01137 SMII ES V1 - CHAPTER 12 BUILT HERITAGE
- 01137 SMII ES V1 - CHAPTER 11 LANDSCAPE AND VISUAL
- 01137 SMII ES V1 - CHAPTER 10 ORNITHOLOGY
- 01137 SMII ES V1 - CHAPTER 1 INTRODUCTION
- 01137 SMII ES V1 FIGURE 10.1A - DESIGNATED SITES WITHIN 10KM - ORNITHOLOGY
- 01137 SMII ES V1 FIGURE 10.1B - NON-STATUTORY DESIGNATIONS WITHIN 2KM - ORNITHOL
- 01137 SMII ES V1 FIGURE 10.2 - BREEDING BIRD SURVEY RESULTS 2022
- 01137 SMII ES V1 FIGURE - BREEDING BIRD SURVEY RESULTS 2023
- 01137 SMII ES V1 FIGURE 10.4 - BREEDING BIRD SURVEY RESULTS
- 01137 SMII ES V1 FIGURE 10.5 OR 013B - BREEDING BIRD SURVEY RESULTS 2023 - SKYLA
- 01137 SMII ES V1 FIGURE 10.6 OR 037B - BREEDING BIRD SURVEY RESULTS 2024 - SKYLA
- 01137 SMII ES V1 FIGURE 10.14 OR 004C - VANTAGE POINT LOCATIONS AND VIEWSHEDS
- 01137 SMII ES V1 FIGURE 10.13 OR 048A - VANTAGE POINT SURVEY RESULTS - WATERFOWL
- 01137 SMII ES V1 FIGURE 10.12 OR 056A - VANTAGE POINT SURVEY RESULTS - KESTREL (
- 01137 SMII ES V1 FIGURE 10.11 OR 047A - VANTAGE POINT SURVEY RESULTS - RAPTORS (
- 01137 SMII ES V1 FIGURE 10.10 OR 046B - VANTAGE POINT SURVEY RESULTS - WADERS (A
- 01137 SMII ES V1 FIGURE 16.2 - CUMULATIVE SHADOW FLICKER ASSESSMEN
- 01137 SMII ES V1 FIGURE 16.1 - CUMULATIVE PROJECT PLAN
- 01137 SMII ES V1 FIGURE 14.1 - HYDROLOGICAL SETTING
- 01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREAS
- 01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENT
- 01137 SMII ES V1 FIGURE 14.2 - SOILS AND PEAT MAPPING
- 01137 SMII ES V1 FIGURE 14.3 - SUPERFICIAL GEOLOGY
- 01137 SMII ES V1 FIGURE 14.4 - BEDROCK GEOLOGY
- 01137 SMII ES V1 FIGURE 14.5 - HYDROLOGICAL FEATURES
- 01137 SMII ES V1 FIGURE 14.5A - HYDROLOGICAL FEATURES
- 01137 SMII ES V1 FIGURE 14.5B - HYDROLOGICAL FEATURES
- 01137 SMII ES V1 FIGURE 14.5C - HYDROLOGICAL FEATURES
- 01137 SMII ES V1 FIGURE 14.5D - HYDROLOGICAL FEATURES
- 01137 SMII ES V1 FIGURE 14.6 - HYDROLOGICAL REGIME
- 01137 SMII ES V1 FIGURE 14.7 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMS
- 01137 SMII ES V1 FIGURE 14.8 - PEAT DEPTH OF PENETRATION AND PROBE LOCATIONS
- 01137 SMII ES V1 FIGURE 14.9 - ESTIMATED PEAT DEPTH
- 01137 SMII ES V1 FIGURE 14.10 - PEAT RESTORATION AREAS
- 01137 SMII ES V1 FIGURE 14.11 - PEATLAND CONDITION ASSESSMENT
- 01137 SMII ES V1 FIGURE 11.1 - LANDSCAPE CONTEXT - 45KM
- 01137 SMII ES V1 FIGURE 11.10 - DESIGN ANALYSIS - 5KM
- 01137 SMII ES V1 FIGURE 11.11 - AVIATION LIGHTING ZTV ? BARE EARTH - 10KM
- 01137 SMII ES V1 FIGURE 11.12 - BARE EARTH ZTV WITH LANDSCAPE CHARACTER 10KM
- 01137 SMII ES V1 FIGURE 11.13 - BARE EARTH ZTV WITH VISUAL RECEPTORS
- 01137 SMII ES V1 FIGURE 11.14 - BARE EARTH ZTV WITH DESIGNATIONS - 10KM
- 01137 SMII ES V1 FIGURE 11.15 - CUMULATIVE ZTV OPERATIONAL WITH SCOUT MOOR II
- 01137 SMII ES V1 FIGURE 11.2 - EXISTING LIGHT ENVIRONMENT -20KM
- 01137 SMII ES V1 FIGURE 11.3 - CUMULATIVE SEARCH AREA 45KM
- 01137 SMII ES V1 FIGURE 11.4 - CUMULATIVE LOCATION PLAN 20KM
- 01137 SMII ES V1 FIGURE 11.5 - BARE EARTH BLADE TIP ZTV 45KM
- 01137 SMII ES V1 FIGURE 11.6 - BARE EARTH HUB HEIGHT ZTV 45KM
- 01137 SMII ES V1 FIGURE 11.7 - ZTV TO BLADE TIP WITH SCREENING 45KM
- 01137 SMII ES V1 FIGURE 11.8 - ZTV TO HUB HEIGHT WITH SCREENING 45KM
- 01137 SMII ES V1 FIGURE 11.9A - LOCAL LANDSCAPE CHARACTER - 20KM
- 01137 SMII ES V1 FIGURE 11.9B - LOCAL LANDSCAPE CHARACTER KEY - 20KM
- 01137 SMII ES V1 FIGURE 12.1 - 1851 ORDNANCE SURVEY 6 INCH
- 01137 SMII ES V1 FIGURE 12.10 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIN
- 01137 SMII ES V1 FIGURE 12.11 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIN
- 01137 SMII ES V1 FIGURE 12.2 - 1894-95 ORDNANCE SURVEY 6 INCH
- 01137 SMII ES V1 FIGURE 12.3 - 1930-31 ORDNANCE SURVEY 6 INCH
- 01137 SMII ES V1 FIGURE 12.4 - HERITAGE ASSET PLAN (15KM STUDY AREA)
- 01137 SMII ES V1 FIGURE 12.5 - HERITAGE ASSET PLAN WITH BARE EARTH BLADE TIP ZTV
- 01137 SMII ES V1 FIGURE 12.6 - HERITAGE ASSET PLAN WITH BARE EARTH HUB HEIGHT ZT
- 01137 SMII ES V1 FIGURE 12.7 - HERITAGE ASSET PLAN WITH BLADE TIP WITH SCREENING
- 01137 SMII ES V1 FIGURE 12.8 - HERITAGE ASSET PLAN WITH HUB HEIGHT WITH SCREENIN
- 01137 SMII ES V1 FIGURE 12.9 - HERITAGE ASSET PLAN WITH ASSETS ASSESSED WITHIN T
- DATED JULY 2025 SCOUT MOOR II - STATEMENT OF COMMUNITY INVOLVEMENT
- SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX A - CONDITION ASSESSM
- SCOUT MOOR II - BIODIVERSITY NET GAIN ASSESSMENT (APPENDIX B - STATUTORY BNG MET
- 01137 SMII ES V1 FIGURE 7.3 CUMULATIVE WIND TURBINES
- 01137 SMII ES V1 FIGURE 7.2 OPERATIONAL NOISE ASSESSMENT AND NOISE MONITORING LO
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Rossendale for determination, against a statutory target of eight weeks. Over the last year Rossendale decided full applications in a median of 101 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Rossendale
-
2026/0138 Granted
Land At Rossendale Golf Club Ewood Lane Haslingden Rossendale Lancashire BB4 6LH
Erection of a steel framed storage building, materials storage bunkers, a vehicle washdown facility and creation of 4No greenstaff car parking spaces within a secure compound together with associated drainage improvement works and landscaping.
-
2025/0458 Granted
530-532 Burnley Road Crawshawbooth Rossendale Lancashire BB4 8NE
Full: Change of use of the buildings from a mixed use consisting of Class E and Class C3 to a Class C3 only use, consisting of 3 residential dwellings. The change of use is facilitated by the addition of a first-floor rear extension and changes to the buildings existing fenestration. Off street parking spaces to be provided to the rear.
-
2025/0327 Granted
Land Bounded By Kingsway, Holcombe Road And Grane Road Helmshore Rossendale BB4 4QH
Erection of new production facility (Use Class B2/B8) and head office (Use Class E(g)(i)), with associated landscaping, parking, storage areas and the creation of a new vehicular access from Holcombe Road.
-
2026/0181 Granted
143A Burnley Road East Waterfoot Rossendale Lancashire BB4 9DF
Full: Change of Use of 1st floor from Residential to Commercial (Class E)
-
2026/0136 Granted
26 Deardengate Haslingden Rossendale Lancashire BB4 5QJ
Full Application: External fabric repairs, window replacement and shop front repairs.