Planning application
3 Parkhurst Grove Horley Surrey RH6 8EN
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed single storey rear extension with pitched roof and velux windows. Proposed single storey front extension with pitched roof. New side extension to existing garage.
As published by the council, reference 25/02256/F
Application record
- Reference
- 25/02256/F
- Type
- Full planning
- Status
- Decided (Approved)
- Decision
- Approved with Conditions
- Received
- 2 Feb 2026
- Validated
- 2 Feb 2026
- Decided
- 25 Mar 2026
- Ward
- Horley West And Sidlow
- Parish
- Horley Town Council
- Decision by
- Principal Planning Officer
- Postcode
- RH6 8EN
Timeline
Dates from the published record
-
2 Feb 2026
Received by Reigate and Banstead
-
25 Mar 2026
Decision issued: Approved with Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
18 Grove Road Horley Surrey RH6 8EL
Demolition of conservatory and construction of single storey rear extension.
Granted Householder Extension Demolition 11 docsSmall domestic -
30 Grove Road Horley Surrey RH6 8EL
Single storey rear extension with half forming conservatory.
Refused Lawful development Extension 11 docsSmall domestic -
Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX
Submission of fast charge socket information pursuant to condition 6 of permission 20/00690/F. Proposed detached bungalow.
Granted Conditions 6 docs -
Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX
Submission of pedestrian site lines information pursuant to condition 7 of permission 20/00690/F. Proposed detached bungalow.
Granted Conditions 6 docs -
Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX
Submission of bin storage information pursuant to condition 9 of permission 20/00690/F. Proposed detached bungalow.
Granted Conditions 6 docs -
28 Grove Road Horley Surrey RH6 8EL
MODIFIED SPECIFICATION SEE CONDITION 2 T6: Maidenhair Tree (Ginkgo biloba) in front garden crown lift upto 2 metres by removing secondary growth only (not primary limbs and branches) .
Granted Trees 6 docs
Other full applications applications
In Reigate and Banstead
-
26/00866/F Awaiting decision
Recreation Ground Garratts Lane Banstead Surrey SM7 2EA
The creation of a permeable parking area in the Garton field.
-
26/01325/F Awaiting decision
Orchard Bungalow Beechen Lane Lower Kingswood Surrey KT20 6RY
Conversion of single residential dwelling house (bungalow) into two residential dwellings.
-
26/01399/F Awaiting decision
Flat 2 Whisperer Villa Yattendon Road Horley Surrey RH6 7BS
Loft Conversion.
-
26/01304/F Awaiting decision
Earlswood Scout Group HQ Earlswood Road Redhill Surrey RH1 6HE
Demolition of existing Scout Hall to provide a new purpose-built Scout Hall over 2 levels meeting accessibility requirements. Works include part demolition of extensions to the existing separate Art Matters hall and improvements to the main hall including accessible WC and access. External works include formalising existing parking and enhancing landscaping across the wider site.
-
26/00691/F Refused
BNP Care La Luz 4 High Street Tadworth Surrey KT20 5SD
Demolition of rear extensions, conservatory and partition walls at ground floor level. Construction of 2 single storey rear extensions and glass-roofed conservatory between. Construction of side extension at first floor level on southeast flank with new dormer window. Main roof extensions at rear and on southeast flank, each with new dormer windows. Alteration to fire escape staircase from first floor level. Installation of new lift serving all 3 floors. New rear terrace and ramp to garden. Soft landscaping to front parking area. As amended on 29/06/2026, 20/07/2026 and on 14/08/2026.