Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Parkhurst Grove Horley Surrey RH6 8EN

Granted Reigate and Banstead 25/02256/F Full planning

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey rear extension with pitched roof and velux windows. Proposed single storey front extension with pitched roof. New side extension to existing garage.

As published by the council, reference 25/02256/F

Application record

Reference
25/02256/F
Type
Full planning
Status
Decided (Approved)
Decision
Approved with Conditions
Received
2 Feb 2026
Validated
2 Feb 2026
Decided
25 Mar 2026
Ward
Horley West And Sidlow
Parish
Horley Town Council
Decision by
Principal Planning Officer
Postcode
RH6 8EN

Timeline

Dates from the published record

  1. 2 Feb 2026

    Received by Reigate and Banstead

  2. 25 Mar 2026

    Decision issued: Approved with Conditions

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18 Grove Road Horley Surrey RH6 8EL

    22/02360/HHOLD Submitted 26 Oct 2022 45m away

    Demolition of conservatory and construction of single storey rear extension.

    Granted Householder Extension Demolition 11 docs
    Small domestic
  • 30 Grove Road Horley Surrey RH6 8EL

    21/01242/CLP Submitted 1 Jun 2021 65m away

    Single storey rear extension with half forming conservatory.

    Refused Lawful development Extension 11 docs
    Small domestic
  • Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX

    20/00690/DET06 Submitted 30 Mar 2023 86m away

    Submission of fast charge socket information pursuant to condition 6 of permission 20/00690/F. Proposed detached bungalow.

    Granted Conditions 6 docs
  • Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX

    20/00690/DET07 Submitted 30 Mar 2023 86m away

    Submission of pedestrian site lines information pursuant to condition 7 of permission 20/00690/F. Proposed detached bungalow.

    Granted Conditions 6 docs
  • Ringwood 85 Parkhurst Road Horley Surrey RH6 8EX

    20/00690/DET09 Submitted 30 Mar 2023 86m away

    Submission of bin storage information pursuant to condition 9 of permission 20/00690/F. Proposed detached bungalow.

    Granted Conditions 6 docs
  • 28 Grove Road Horley Surrey RH6 8EL

    26/00876/TPO Submitted 21 May 2026 87m away

    MODIFIED SPECIFICATION SEE CONDITION 2 T6: Maidenhair Tree (Ginkgo biloba) in front garden crown lift upto 2 metres by removing secondary growth only (not primary limbs and branches) .

    Granted Trees 6 docs

In Reigate and Banstead

  • 26/00866/F Awaiting decision

    Recreation Ground Garratts Lane Banstead Surrey SM7 2EA

    The creation of a permeable parking area in the Garton field.

    Full applications
  • 26/01325/F Awaiting decision

    Orchard Bungalow Beechen Lane Lower Kingswood Surrey KT20 6RY

    Conversion of single residential dwelling house (bungalow) into two residential dwellings.

    Full applications
  • 26/01399/F Awaiting decision

    Flat 2 Whisperer Villa Yattendon Road Horley Surrey RH6 7BS

    Loft Conversion.

    Full applications
  • 26/01304/F Awaiting decision

    Earlswood Scout Group HQ Earlswood Road Redhill Surrey RH1 6HE

    Demolition of existing Scout Hall to provide a new purpose-built Scout Hall over 2 levels meeting accessibility requirements. Works include part demolition of extensions to the existing separate Art Matters hall and improvements to the main hall including accessible WC and access. External works include formalising existing parking and enhancing landscaping across the wider site.

    Full applications
  • 26/00691/F Refused

    BNP Care La Luz 4 High Street Tadworth Surrey KT20 5SD

    Demolition of rear extensions, conservatory and partition walls at ground floor level. Construction of 2 single storey rear extensions and glass-roofed conservatory between. Construction of side extension at first floor level on southeast flank with new dormer window. Main roof extensions at rear and on southeast flank, each with new dormer windows. Alteration to fire escape staircase from first floor level. Installation of new lift serving all 3 floors. New rear terrace and ramp to garden. Soft landscaping to front parking area. As amended on 29/06/2026, 20/07/2026 and on 14/08/2026.

    8 May 2026 Full applications