Planning application
Land Parcel At 525252 145106 Ironsbottom Sidlow Surrey
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed application for 3 stables, and associated works including new vehicular access, drainage works at access to introduce culvert and new gates set back from access. As amended on 10/12/2024, 20/02/2025, 15/01/2026,19/01/2026, 19/02/2026 and on 09/04/2026.
As published by the council, reference 24/01851/F
Application record
- Reference
- 24/01851/F
- Type
- Full planning
- Status
- Awaiting decision
- Received
- 12 Dec 2024
- Validated
- 12 Dec 2024
- Ward
- Horley West And Sidlow
- Parish
- Salfords And Sidlow Parish Council
- Decision by
- Head of Places and Planning
Timeline
Dates from the published record
-
12 Dec 2024
Received by Reigate and Banstead
-
30 Jul 2026
Added to PlanIndex
-
21 Aug 2026
Status changed to Awaiting decision
Previously Registered.
-
Decision
Awaiting decision
Decision expected by 6 February 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Reigate and Banstead took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Planning by Design Agent, a planning consultancy registered in London
Active · incorporated 2021 · London
331 applications on PlanIndex · across 140 councils · 77% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Reigate and Banstead for determination, against a statutory target of eight weeks. Over the last year Reigate and Banstead decided full applications in a median of 63 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Reigate and Banstead
-
26/01706/F Awaiting decision
116 Fir Tree Road Banstead Surrey SM7 1NH
Change of use from HMO to C3 single dwelling house which the property used to be along with double storey rear extension, first floor side extension, loft conversion with rear dormer and front skylight.
-
26/01463/F Awaiting decision
Horley Bowling Club Bowling Green Horley Recreation Ground Brighton Road Horley Surrey RH6 8DA
Relocation and replacement of the existing storage shed within the grounds of Horley Bowling Club comprising the installation of two new timber storage sheds and associated bases.
-
26/01620/F Awaiting decision
46 Albert Road Horley Surrey RH6 7JA
Alterations to the existing detached garage/outbuilding, including replacement roof and associated external alterations, to facilitate the use of part of the building as a small-scale home-based nail studio ancillary to the residential use of the property, with the remainder retained as domestic storage.
-
26/01678/F Awaiting decision
Flat 2 29A Nork Way Banstead Surrey SM7 1PB
Conversion of first floor 1 bedroom flat to extend the dental practice.
-
26/01512/F Awaiting decision
The Oakwood School Balcombe Road Horley Surrey RH6 9AE
Installation of 2nr single storey Portakabin buildings to be used as teaching accommodation for a period of 1 year.