Skip to content
PlanIndex Get alerts
Menu

Planning application

Tranche SW3 Eagle Way Hampton Vale Peterborough

Granted Peterborough 10/00829/ADV Advertisement Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of non-illuminated V board sign and 2 flag poles

As published by the council, reference 10/00829/ADV

Application record

Reference
10/00829/ADV
Type
Advertisement Application
Status
Decided
Decision
Granted As published: Permitted
Received
25 Jun 2010
Validated
25 Jun 2010
Decided
19 Aug 2010
Ward
Orton With Hampton
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Site history

Applications at this address on the Peterborough register

This site has had 5 applications since 2010: 2 approved, 0 refused.

  • 10/01418/DISCHG Decided

    Tranche SW3 Eagle Way Hampton Vale Peterborough

    Discharge of conditions C5 (materials), C6 (levels/drainage and surfacing materials of roads and footways), C8 (street lighting), C13 (Pedestrian gates), C15 (Foul and surface water drainage), C17 (Fire hydrants) & C21(Levels) of permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided 2 Jun 2011 Conditions
  • 11/00046/NONMAT Decided

    Tranche SW3 Eagle Way Hampton Vale Peterborough

    Non-material amendment to planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure - Amendment to entrance door position, handing and fenestration to plot 17

    Decided 8 Feb 2011 Amendments
  • 10/01451/DISCHG Decided

    Tranche SW3 Eagle Way Hampton Vale Peterborough

    Discharge of conditions 5 (materials), 6 (roads and footways), 8 (street lighting), 15 (drainage) and 21 (levels) of planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided 17 Dec 2010 Conditions
  • 10/00444/FUL Granted

    Tranche SW3 Eagle Way Hampton Vale Peterborough

    Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided 17 Aug 2010 Full applications

Timeline

Dates from the published record

  1. 25 Jun 2010

    Received by Peterborough

  2. 19 Aug 2010

    Decision issued: Permitted

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Peterborough granted permission on 19 August 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    11/00046/NONMAT Submitted 12 Jan 2011 50 yards away

    Non-material amendment to planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure - Amendment to entrance door position, handing and fenestration to plot 17

    Decided Amendments Windows or glazing 4 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/01418/DISCHG Submitted 3 Mar 2011 50 yards away

    Discharge of conditions C5 (materials), C6 (levels/drainage and surfacing materials of roads and footways), C8 (street lighting), C13 (Pedestrian gates), C15 (Foul and surface water drainage), C17 (Fire hydrants) & C21(Levels) of permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided Conditions 8 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/00444/FUL Submitted 18 May 2010 50 yards away

    Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Granted Full applications 86 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/01451/DISCHG Submitted 22 Oct 2010 50 yards away

    Discharge of conditions 5 (materials), 6 (roads and footways), 8 (street lighting), 15 (drainage) and 21 (levels) of planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided Conditions 12 docs
    Major scheme
  • Land Between Eagle Way And The Orton Brickworks Access London Road Peterborough

    07/01794/FUL Submitted 14 Nov 2007 50 yards away

    Renewal of planning permission 05/01883/FUL for construction of temporary access road

    Granted Full applications 2 docs
  • Tranche SW5 Eagle Way Hampton Vale Peterborough

    10/00305/REM Submitted 20 Apr 2010 50 yards away

    Approval of access, appearance, layout, landscape and scale for construction of 19 dwellings

    Granted Reserved matters 68 docs
    Major scheme

In Peterborough

  • 26/002794/ADV Granted

    Unit B1 Brotherhood Shopping Park Brotherhood Close Walton Peterborough PE4 6ZR

    New flex faced light box at high level, Internally illuminated fascia sign above

    Received 19 Aug, published by the council 20 Aug 2026 Advertising
  • 26/002959/ADV Awaiting decision

    25 - 26 Long Causeway Peterborough PE1 1YJ

    Installation of 1x fascia sign, 1x projecting sign, 1x internal digital display

    25 Sep 2026 Advertising
  • 26/002705/ADV Granted

    Cygnet Road Cygnet Park Phorpres Way Hampton Peterborough PE7 8FD

    1 x internally illuminated monolith

    Received 4 Aug, published by the council 8 Aug 2026 Advertising
  • 26/002859/ADV Awaiting decision

    Rontec Wansford, A47 Nene Close, Wansford, Peterborough, PE8 6LB

    Erection of two illuminated small format advertising displays

    Received 7 Sep, published by the council 9 Sep 2026 Advertising
  • 26/002514/ADV Awaiting decision

    7 Midgate Peterborough PE1 1TN

    Installation of 1.no new shop front Halo illuminated sign

    Received 4 Sep, published by the council 6 Sep 2026 Advertising