Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Between Eagle Way And The Orton Brickworks Access London Road Peterborough

Granted Peterborough 05/01883/FUL Planning Application (Full)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Renewal of planning permission 00/01009/FUL for temporary access road

As published by the council, reference 05/01883/FUL

Application record

Reference
05/01883/FUL
Type
Planning Application (Full)
Status
Decided
Decision
Granted As published: Permitted
Received
24 Nov 2005
Validated
24 Nov 2005
Decided
19 Jan 2006
Ward
Orton With Hampton
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Site history

Applications at this address on the Peterborough register

This site has had 2 applications since 2005: 2 approved, 0 refused.

  • 07/01794/FUL Granted

    Land Between Eagle Way And The Orton Brickworks Access London Road Peterborough

    Renewal of planning permission 05/01883/FUL for construction of temporary access road

    Decided 7 Jan 2008 Full applications

Timeline

Dates from the published record

  1. 24 Nov 2005

    Received by Peterborough

  2. 19 Jan 2006

    Decision issued: Permitted

  3. 15 Nov 2026

    Added to PlanIndex

Documents

2 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Peterborough granted permission on 19 January 2006, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Between Eagle Way And The Orton Brickworks Access London Road Peterborough

    07/01794/FUL Submitted 14 Nov 2007 50 yards away

    Renewal of planning permission 05/01883/FUL for construction of temporary access road

    Granted Full applications 2 docs
  • Tranche SW5 Eagle Way Hampton Vale Peterborough

    10/00305/REM Submitted 20 Apr 2010 50 yards away

    Approval of access, appearance, layout, landscape and scale for construction of 19 dwellings

    Granted Reserved matters 68 docs
    Major scheme
  • Tranche SW5 Eagle Way Hampton Vale Peterborough

    10/01507/DISCHG Submitted 17 Dec 2010 50 yards away

    Discharge of condition C19 (fire hydrants) of permission 10/00305/REM - Approval of access, appearance, layout, landscape and scale for construction of 19 dwellings

    Decided Conditions 1 doc
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    11/00046/NONMAT Submitted 12 Jan 2011 50 yards away

    Non-material amendment to planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure - Amendment to entrance door position, handing and fenestration to plot 17

    Decided Amendments Windows or glazing 4 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/01418/DISCHG Submitted 3 Mar 2011 50 yards away

    Discharge of conditions C5 (materials), C6 (levels/drainage and surfacing materials of roads and footways), C8 (street lighting), C13 (Pedestrian gates), C15 (Foul and surface water drainage), C17 (Fire hydrants) & C21(Levels) of permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided Conditions 8 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/00444/FUL Submitted 18 May 2010 50 yards away

    Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Granted Full applications 86 docs
    Major scheme

In Peterborough

  • 26/002854/FUL Refused

    Green Drove Farm, Thorney Dyke, Thorney, PE6 0RG

    Change of use of land from agricultural to residential amenity space including new garage

    Received 2 Sep, published by the council 19 Sep 2026 Full applications
  • 26/002999/FUL Withdrawn

    Limes Farm, Main Street, Barnack, Stamford, PE9 3DN

    Demolition of farm buildings

    Received 1 Oct, published by the council 5 Oct 2026 Full applications
  • 26/002938/FUL Withdrawn

    8, Empson Road, Peterborough, PE1 5UP

    Change of use from Class B2 (General Industrial) to Class B8 (Storage and Distribution) and siting of 39 storage containers within the external areas of the site

    Received 21 Sep, published by the council 2 Oct 2026 Full applications
  • 26/002730/FUL Granted

    Unit 1, The Broadlands, Peterborough, PE1 5GJ

    Installation of external vehicle wash bay and new external lighting columns and associated works

    Received 7 Aug, published by the council 13 Aug 2026 Full applications
  • 26/003159/FUL Awaiting decision

    709, Lincoln Road, Peterborough, PE1 3HD

    Dormer on rear side of roof

    Received 10 Nov, published by the council 15 Nov 2026 Full applications