Planning application

Tranche SW3 Eagle Way Hampton Vale Peterborough

Granted Peterborough 10/00444/FUL Planning Application (Full)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

As published by the council, reference 10/00444/FUL

Application record

Reference
10/00444/FUL
Type
Planning Application (Full)
Status
Decided
Decision
Permitted
Received
18 May 2010
Validated
18 May 2010
Decided
17 Aug 2010
Ward
Orton With Hampton
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Timeline

Dates from the published record

  1. 18 May 2010

    Received by Peterborough

  2. 17 Aug 2010

    Decision issued: Permitted

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

86 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    11/00046/NONMAT Submitted 12 Jan 2011 0m away

    Non-material amendment to planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure - Amendment to entrance door position, handing and fenestration to plot 17

    Decided Amendments Windows or glazing 4 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/01418/DISCHG Submitted 3 Mar 2011 0m away

    Discharge of conditions C5 (materials), C6 (levels/drainage and surfacing materials of roads and footways), C8 (street lighting), C13 (Pedestrian gates), C15 (Foul and surface water drainage), C17 (Fire hydrants) & C21(Levels) of permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided Conditions 8 docs
    Major scheme
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/00829/ADV Submitted 25 Jun 2010 0m away

    Installation of non-illuminated V board sign and 2 flag poles

    Granted Advertising 5 docs
  • Tranche SW3 Eagle Way Hampton Vale Peterborough

    10/01451/DISCHG Submitted 22 Oct 2010 0m away

    Discharge of conditions 5 (materials), 6 (roads and footways), 8 (street lighting), 15 (drainage) and 21 (levels) of planning permission 10/00444/FUL - Construction of 24 units comprising of 1x 5 bed, 9 x 4 bed, 3 x 3 bed houses and 9 x 2 bed/1 x 1 bed in apartment block and 1 x 2 bed apartment over garage, with associated infrastructure

    Decided Conditions 12 docs
    Major scheme
  • Tranche SW5 Eagle Way Hampton Vale Peterborough

    10/00305/REM Submitted 20 Apr 2010 45m away

    Approval of access, appearance, layout, landscape and scale for construction of 19 dwellings

    Granted Reserved matters 68 docs
    Major scheme
  • Tranche SW5 Eagle Way Hampton Vale Peterborough

    10/01507/DISCHG Submitted 17 Dec 2010 45m away

    Discharge of condition C19 (fire hydrants) of permission 10/00305/REM - Approval of access, appearance, layout, landscape and scale for construction of 19 dwellings

    Decided Conditions 1 doc
    Major scheme

In Peterborough

  • 25/01181/FUL Granted

    Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF

    Change of use of land to a private car park serving Christ the Servant King Chur

    26 Jan 2026 Full applications
  • 26/002197/FUL Granted

    Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ

    Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes

    7 Apr 2026 Full applications
  • 26/002397/FUL Granted

    Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN

    Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)

    20 May 2026 Full applications
  • 26/002836/FUL Status unknown

    15 South Parade Peterborough PE3 6BG

    13-unit residential development consisting of 9 flats, 4 maisonettes, and associ

    3 Sep 2026 Full applications
  • 26/002499/FUL Refused

    Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ

    Workshop building associated with existing vehicle repair workshop (retrospectiv

    24 Jun 2026 Full applications