Planning application
Northlight Pendle Northlight Parade Brierfield Lancashire BB9 5EG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Full: Change of use of Unit 1 from Commercial, Business and Service (Use Class E) to Storage and Distribution (Use Class B8) and external alterations to form a new roller-shutter entrance and a personnel door with external steps.
As published by the council, reference 26/0494/FUL
Application record
- Reference
- 26/0494/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 24 Jul 2026
- Validated
- 4 Aug 2026
- Ward
- Brierfield West & Reedley
- Parish
- Brierfield Town Council
- Postcode
- BB9 5EG
Timeline
Dates from the published record
-
24 Jul 2026
Received by Pendle
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Pendle took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Colne
9 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Pendle for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
The Substation, Northlight Parade, Brierfield, Lancashire BB9 5NH
Listed Building Consent: External and internal refurbishment to building to form a new distillery and bar.
Granted Heritage and listed buildings 16 docs -
The Substation Northlight Parade, Brierfield, Lancashire, BB9 5NH
Full: External and internal refurbishment to building to form a new distillery and bar.
Granted Full applications 29 docs -
The Substation Northlight Parade Brierfield Lancashire
Listed Building Consent: Internal fit out as a coffee shop, display of internally illuminated external signage and 3 no. external wall mounted condensers.
Granted Heritage and listed buildings 41 docs -
The Substation Northlight Parade Brierfield Lancashire
Listed Building Consent: External and internal refurbishment of the existing substation to form a new coffee shop.
Granted Heritage and listed buildings 16 docs -
Northlight Glen Way Brierfield Nelson Lancashire BB9 5NH
Full: Variation of Condition: Vary Condition 2 (Plan Numbers) of Listed Building Consent 17/0460/LBC.
Granted Amendments 61 docs -
Northlight Pendle Northlight Parade Brierfield Lancashire BB9 5EG
87% historically approved · decision due ~29 Sep
Listed Building Consent: External alterations to form a new roller-shutter entrance and a personnel door with external steps alongside internal alterations including the installation of a mezzanine floor.
Awaiting decision Heritage and listed buildings 21 docs
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.