Planning application
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of air source heat pump, ductwork, condenser and associated works. Insertion of timber screen to side elevation. Alterations to roof and installation of insulation. Alterations to fenestration.
As published by the council, reference 25/03382/FUL
Application record
- Reference
- 25/03382/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 19 Dec 2025
- Validated
- 19 Dec 2025
- Ward
- Osney And St. Thomas Ward
- Decision by
- Delegated decision
- Postcode
- OX1 1HU
Site history
Applications at this address on the Oxford register
This site has had 5 applications since 2025: 1 approved, 0 refused.
-
23/02805/CND2 Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition(s) 5 (Further details - new windows and doors), 7 (Further details - flue finish) and 8 (Method statements) of listed building consent 23/02805/LBC.
-
23/02804/CND Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 3 (Window and door details) of planning permission 23/02804/FUL.
-
25/03379/LBC Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Targeted refurbishment works to include upgrades to the building fabric to improve thermal efficiency; removal of internal mezzanine floor, alterations to WC area; strengthening of roof structure to enable insulation and the reinstatement of slates, new rooflights, reconstruction of part of northern elevation, upgraded MEP services, installation of flues, new windows and doors (revised description).
-
23/02805/CND Granted
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 4 (Historic Building Recording ) of listed building consent 23/02805/LBC
Timeline
Dates from the published record
-
19 Dec 2025
Received by Oxford
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Oxford took a median of 37 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Oxford for determination, against a statutory target of eight weeks. Over the last year Oxford decided full applications in a median of 64 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
97% historically approved · decision due ~3 Mar
Details submitted in compliance with condition(s) 5 (Further details - new windows and doors), 7 (Further details - flue finish) and 8 (Method statements) of listed building consent 23/02805/LBC.
Awaiting decision Conditions Windows or glazing 7 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
97% historically approved · decision due ~13 Feb
Details submitted in compliance with condition 3 (Window and door details) of planning permission 23/02804/FUL.
Awaiting decision Conditions Windows or glazing 12 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 4 (Historic Building Recording ) of listed building consent 23/02805/LBC
Granted Conditions 3 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
98% historically approved · decision due ~13 Feb
Targeted refurbishment works to include upgrades to the building fabric to improve thermal efficiency; removal of internal mezzanine floor, alterations to WC area; strengthening of roof structure to enable insulation and the reinstatement of slates, new rooflights, reconstruction of part of northern elevation, upgraded MEP services, installation of flues, new windows and doors (revised description).
Awaiting decision Heritage and listed buildings Loft or dormer Windows or glazing 35 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
Installation of exterior lighting on the building window edges.
Withdrawn Full applications Windows or glazing 26 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
External refurbishment and installation of external lighting
Withdrawn Heritage and listed buildings 27 docs
Other full applications
In Oxford
-
26/02081/FUL Awaiting decision
36 Kennett Road Oxford Oxfordshire OX3 7BJ
Demolition of rear conservatory and erection of a single storey rear extension.
-
26/02069/FUL Awaiting decision
28 Rymers Lane Oxford Oxfordshire OX4 3LB
Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). Provision of bin and bike stores.
-
26/02065/FUL Awaiting decision
16 Norham Road Oxford Oxfordshire OX2 6SF
Installation of front gates (Retrospective).
-
26/02071/FUL Awaiting decision
The William R Miller Building Dawson Street Oxford Oxfordshire OX4 1GF
Installation of 38no. of PV panels to existing roof and associated works.
-
26/02075/FUL Awaiting decision
Oxford University Press Great Clarendon Street Oxford Oxfordshire OX2 6DP
Installation of air conditioning units and associated works.