Planning application
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Works: Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Targeted refurbishment works to include upgrades to the building fabric to improve thermal efficiency; removal of internal mezzanine floor, alterations to WC area; strengthening of roof structure to enable insulation and the reinstatement of slates, new rooflights, reconstruction of part of northern elevation, upgraded MEP services, installation of flues, new windows and doors (revised description).
As published by the council, reference 25/03379/LBC
Application record
- Reference
- 25/03379/LBC
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 19 Dec 2025
- Validated
- 19 Dec 2025
- Ward
- Osney And St. Thomas Ward
- Decision by
- Delegated decision
- Postcode
- OX1 1HU
Site history
Applications at this address on the Oxford register
This site has had 5 applications since 2025: 1 approved, 0 refused.
-
23/02805/CND2 Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition(s) 5 (Further details - new windows and doors), 7 (Further details - flue finish) and 8 (Method statements) of listed building consent 23/02805/LBC.
-
23/02804/CND Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 3 (Window and door details) of planning permission 23/02804/FUL.
-
25/03382/FUL Awaiting decision
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Installation of air source heat pump, ductwork, condenser and associated works. Insertion of timber screen to side elevation. Alterations to roof and installation of insulation. Alterations to fenestration.
-
23/02805/CND Granted
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 4 (Historic Building Recording ) of listed building consent 23/02805/LBC
Timeline
Dates from the published record
-
19 Dec 2025
Received by Oxford
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Oxford took a median of 47 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Oxford for determination, against a statutory target of eight weeks. Over the last year Oxford decided heritage and listed building applications in a median of 65 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
98% historically approved · decision due ~3 Mar
Details submitted in compliance with condition(s) 5 (Further details - new windows and doors), 7 (Further details - flue finish) and 8 (Method statements) of listed building consent 23/02805/LBC.
Awaiting decision Conditions Windows or glazing 7 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
98% historically approved · decision due ~13 Feb
Details submitted in compliance with condition 3 (Window and door details) of planning permission 23/02804/FUL.
Awaiting decision Conditions Windows or glazing 12 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
Details submitted in compliance with condition 4 (Historic Building Recording ) of listed building consent 23/02805/LBC
Granted Conditions 3 docs -
Jam Factory 4 Hollybush Row Oxford Oxfordshire OX1 1HU
85% historically approved · decision due ~13 Feb
Installation of air source heat pump, ductwork, condenser and associated works. Insertion of timber screen to side elevation. Alterations to roof and installation of insulation. Alterations to fenestration.
Awaiting decision Full applications Windows or glazing 37 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
Installation of exterior lighting on the building window edges.
Withdrawn Full applications Windows or glazing 26 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
External refurbishment and installation of external lighting
Withdrawn Heritage and listed buildings 27 docs
Other heritage and listed building applications
In Oxford
-
26/02453/LBC Awaiting decision
8 Walton Street Oxford Oxfordshire OX1 2HG
Replacement of rear single storey extension glass roof with a natural slate roof, raising by 125mm and retaining the two rooflights.
-
26/02432/LBC Awaiting decision
91 Woodstock Road Oxford Oxfordshire OX2 6HL
Extension of existing boundary wall, replacement of existing boundary fence with a boundary wall
-
26/00953/LBC Refused
The Manor House 3 Mill Lane Iffley Oxford Oxfordshire OX4 4EJ
Demolition of existing lean-to structure and extension to side (north) and first floor rear (east) extension. Erection of a single storey side and rear extension. Insertion of 1no. first floor window to rear (east) elevation and alterations to rear porch. Insertion of 1no. window to side (north) elevation. Repairs to boundary wall and associated works. Internal alterations, including minor alterations to plan form at ground floor, and thermal upgrade works and underfloor heating on all floors. (Amended description)
-
26/02406/LBC Awaiting decision
15 Park Town Oxford Oxfordshire OX2 6SN
Alterations to fenestration.
-
26/02401/LBC Awaiting decision
29 Park Town Oxford Oxfordshire OX2 6SN
Alterations to fenestration.