Planning application
Kirbister Mill, Orphir, Orkney KW17 2RA
Works: Roofing Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Convert mill to house including works to re-roof, replacement windows and doors, install solar panels, replace rainwater goods and internal alterations
As published by the council, reference 26/149/LB
Application record
- Reference
- 26/149/LB
- Type
- Listed Building
- Status
- Awaiting decision
- Received
- 19 May 2026
- Validated
- 16 Jun 2026
- Ward
- Kirkwall West & Orphir
- Parish
- Orphir Community Council
- Postcode
- KW17 2RA
Site history
Applications at this address on the Orkney Islands register
This site has had 2 applications since 2026.
-
26/150/PP Awaiting decision
Kirbister Mill, Orphir, Orkney KW17 2RA
Convert mill to a house
Timeline
Dates from the published record
-
19 May 2026
Received by Orkney Islands
-
16 Jun 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Orkney Islands took a median of 103 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Crawford Architecture Agent, an architecture practice
45 applications on PlanIndex · across 3 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- Historic Environment Scotland
- Orkney Heritage Society
- Listed Building Consent
- Window and Door Detail
- Location and Site Plan
- Invalid Letter
- Existing Floor & Elevation Plan
- Existing Floor & Elevation Plan
- Existing Site Plan
- Proposed Ground Floor Plan
- Proposed First Floor Plan
- Proposed Elevations
- Site Section
- Proposed Site Plan
- Listed Building
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Orkney Islands for determination, against a statutory target of eight weeks. Over the last year Orkney Islands decided heritage and listed building applications in a median of 97 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Kirbister Mill, Orphir, Orkney KW17 2RA
96% historically approved · decision due ~11 Aug
Convert mill to a house
Awaiting decision Full applications 20 docs -
East Cottage, Orphir, Orkney KW17 2RA
96% historically approved · decision due ~8 Jul
Create an access, and construct an access track, hardstanding and parking (to serve existing business/workshop)
Awaiting decision Full applications 13 docs
Other heritage and listed building applications
In Orkney Islands
-
26/220/LB Decided
23 St Catherine's Place, Kirkwall, Orkney KW15 1HX
Remove boundary wall
-
26/113/LB Decided
2 South End, Stromness, Orkney KW16 3DJ
Restore hand crane
-
26/159/LB Decided
Ness House, Ness Road, Stromness Orkney KW16 3DL
Replace bathroom interior, install electric underfloor heating and install extraction fan
-
26/272/LB Awaiting decision
Watergate House, Watergate, Kirkwall, Orkney KW15 1PD
Replace roof covering, lead work and vent (retrospective)
-
26/185/LB Granted
Sule Skerry Lighthouse, Orkney
Internal strip out (including watchroom immediately beneath the lantern), structural repairs to cracks, roof and drainage repairs, re-waterproof, external redecoration (including historic metalwork repairs and replacements), replacement batteries, engine and fuel system, water system, lighting and rewiring, and full internal alterations including replacement bathroom, kitchen and accommodation areas