Planning application
Elthorne Works 4 Trumpers Way Hanwell W7 2QA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of a mixed-use development comprising residential dwellings (Use Class C3) and flexible commercial and/or community floorspace (Use Classes E and/or F2), together with associated landscaping and vehicle parking. The proposal represents a departure from the Development Plan, as it is not in accordance with the policies in force for the area. The site is designated as a Locally Significant Industrial Site (LSIS), and the scheme constitutes Major Development. For Public Consultation Purposes Only (not forming part of the statutory Description of Development): The proposal includes 287 residential dwellings (Use Class C3) and 254 sqm of flexible commercial and/or community floorspace (Use Classes E and/or F), with buildings ranging from 10 to 15 storeys in height.
As published by the council, reference 260215FUL
Application record
- Reference
- 260215FUL
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 21 Jan 2026
- Validated
- 21 Jan 2026
- Ward
- Hanwell Broadway
- Postcode
- W7 2QA
Timeline
Dates from the published record
-
21 Jan 2026
Received by Old Oak and Park Royal Development Corporation
-
3 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Old Oak and Park Royal Development Corporation took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Iceni Projects Ltd. Agent, registered in London
Active · incorporated 2005 · London
861 applications on PlanIndex · across 92 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
177 documents on file for this application
- DRAINAGE STRATEGY
- ACCOMMODATION SCHEDULE
- ELTHORNE WORKS_DESIGN RESPONSE
- GROUND FLOOR LANDSCAPE PLAN
- ROOF LEVEL LANDSCAPE PLAN
- BLOCK A WEST ELEVATION, PROPOSED
- BLOCK A, SOUTH ELEVATION, PROPOSED
- BLOCK A, EAST ELEVATION, PROPOSED
- BLOCK A, NORTH ELEVATION, PROPOSED
- BLOCK B, WEST ELEVATION, PROPOSED
- BLOCK B, SOUTH ELEVATION, PROPOSED
- BLOCK B, EAST ELEVATION, PROPOSED
- BLOCK B, NORTH ELEVATION, PROPOSED
- BLOCK C, WEST ELEVATION, PROPOSED
- BLOCK C, SOUTH ELEVATION, PROPOSED
- BLOCK C, EAST ELEVATION, PROPOSED
- BLOCK C, NORTH ELEVATION, PROPOSED
- BLOCK A, LEVELS 13-14, FLOOR PLANS, PROPOSED
- BLOCK A, LEVELS 09-11, FLOOR PLANS, PROPOSED
- BLOCK A, LEVELS 09-11, FLOOR PLANS, PROPOSED
- BLOCK A, LEVELS 03-06, FLOOR PLANS, PROPOSED
- BLOCK A, LEVEL 12, FLOOR PLAN, PROPOSED
- BLOCK A, LEVEL 08, FLOOR PLAN, PROPOSED
- BLOCK A, LEVEL 02, FLOOR PLAN, PROPOSED
- BLOCK A, LEVEL 01, FLOOR PLAN, PROPOSED
- BLOCK A, LEVEL 00, FLOOR PLAN, PROPOSED
- BLOCK B, LEVEL 00, FLOOR PLAN, PROPOSED
- BLOCK B, LEVELS 09-10, FLOOR PLANS, PROPOSED
- BLOCK B, LEVELS 07-08, FLOOR PLANS, PROPOSED
- BLOCK B, LEVELS 01-06, FLOOR PLANS, PROPOSED
- BLOCK C, LEVELS 05-07, FLOOR PLANS, PROPOSED
- BLOCK C, LEVELS 03-04, FLOOR PLANS, PROPOSED
- BLOCK C, LEVELS 01-02, FLOOR PLANS, PROPOSED
- BLOCK C, LEVEL 09, FLOOR PLAN, PROPOSED
- BLOCK C, LEVEL 08, FLOOR PLAN, PROPOSED
- BLOCK C, LEVEL 00, FLOOR PLAN, PROPOSED
- SITE WIDE, WEST ELEVATION, PROPOSED
- SITE WIDE, SOUTH ELEVATION, PROPOSED
- SITE WIDE, EAST ELEVATION, PROPOSED
- SITE WIDE, NORTH ELEVATION, PROPOSED
- GENERAL ARRANGEMENT, LEVELS 05-06, FLOOR PLANS, PROPOSED
- GENERAL ARRANGEMENT, LEVELS 03-04, FLOOR PLANS, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 15, ROOF PLAN, PROPOSED
- GENERAL ARRANGEMENT, LEVELS 13-14, FLOOR PLANS, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 12, FLOOR PLAN, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 11, FLOOR PLAN, PROPOSED
- GENERAL ARRGANGEMENT, LEVEL 10, FLOOR PLAN, PROPOSED
- GENERAL ARRGANGEMENT, LEVELS 09, FLOOR PLAN, PROPOSED
- GENERAL ARRGANGEMENT, LEVELS 08, FLOOR PLAN, PROPOSED
- GENERAL ARRGANGEMENT, LEVEL 07, FLOOR PLAN, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 02, FLOOR PLAN, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 01, FLOOR PLAN, PROPOSED
- GENERAL ARRANGEMENT, LEVEL 00, FLOOR PLAN, PROPOSED
- SITE WIDE, SECTION (DD), PROPOSED
- SITE WIDE, SECTION (CC), PROPOSED
- SITE WIDE, SECTION (AA), PROPOSED
- SITE WIDE, SECTION (BB), PROPOSED
- DRAWING REGISTER 06-10-2026
- GLA STAGE 1 REPORT
- GLA STAGE 1 DECISION LETTER
- HERITAGE TOWNSCAPE AND VISUAL ASSESSMENT PART 1
- HERITAGE TOWNSCAPE AND VISUAL ASSESSMENT PART 2
- HERITAGE TOWNSCAPE AND VISUAL ASSESSMENT PART 3
- PRELIMINARY ECOLOGICAL APPRASIAL
- BIODIVERSITY NET GAIN ASSESSMENT
- WIND MICROCLIMATE SUMMARY
- BIODIVERSITY NET GAIN METRIC
- LAMP POST
- MAJOR SITE NOTICE
- DRAWING REGISTER
- ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REQUEST REPORT
- BLOCK A LEVEL 01 FLOOR PLAN PROPOSED
- BLOCK A LEVEL 02 FLOOR PLAN PROPOSED
- BLOCK A LEVEL 08 FLOOR PLAN PROPOSED
- BLOCK A LEVEL 12 FLOOR PLAN PROPOSED
- BLOCK A LEVELS 03-06 FLOOR PLANS PROPOSED
- BLOCK A LEVEL 07 FLOOR PLAN PROPOSED
- BLOCK A LEVELS 09-11 FLOOR PLANS PROPOSED
- BLOCK C LEVEL 08 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 01 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 02 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 07 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 08 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 09 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 10 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 11 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 12 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVELS 03-04 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVELS 05-06 FLOOR PLANS PROPOSED
- APPLICATIONFORMREDACTED
- TRANSPORT ASSESSMENT PART 3
- TRANSPORT ASSESSMENT PART 1
- TRANSPORT ASSESSMENT PART 2
- TRANSPORT ASSESSMENT PART 4
- TRANSPORT ASSESSMENT PART 5
- TRANSPORT ASSESSMENT PART 6
- FRAMEWORK CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- TRAVEL PLAN PART 3
- TRAVEL PLAN PART 1
- TRAVEL PLAN PART 2
- LANDSCAPE STRATEGY
- BREEAM PRE-ASSESSMENT
- DESK-BASED ARCHEOLOGICAL ASSESSMENT
- CIRCULAR ECONOMY REPORT
- DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- CONSTRUCTION MANAGEMENT PLAN
- COMMERCIAL STRATEGY REPORT
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- ENERGY AND SUSTAINABILITY STATEMENT
- STATEMENT OF COMMUNITY ENGAGEMENT
- FIRE STATEMENT FORM
- HOUSING NEED AND MIXED COMMUNITY ASSESSMENT
- WHOLE LIFE CYCLE ASSESSMENT REPORT
- CONTAMINATION ASSESSMENT / LAND REMEDIATION
- INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- PROJECT WASTE MANAGEMENT PLAN
- NOISE SURVEY
- APPENDIX B - SAP OUTPUTS
- APPENDIX F - GLA CARBON EMISSION REPORTING SPREADSHEET
- APPENDIX G - BE SEEN SPREADSHEET
- PLANNING STATEMENT
- BLOCK A NORTH ELEVATION PROPOSED
- BLOCK A EAST ELEVATION PROPOSED
- BLOCK A SOUTH ELEVATION PROPOSED
- BLOCK A WEST ELEVATION PROPOSED
- BLOCK B NORTH ELEVATION PROPOSED
- BLOCK B EAST ELEVATION PROPOSED
- BLOCK B SOUTH ELEVATION PROPOSED
- BLOCK B WEST ELEVATION PROPOSED
- BLOCK C NORTH ELEVATION PROPOSED
- BLOCK C EAST ELEVATION PROPOSED
- BLOCK C SOUTH ELEVATION PROPOSED
- BLOCK C WEST ELEVATION PROPOSED
- BLOCK A LEVEL 00 FLOOR PLAN PROPOSED
- BLOCK A LEVEL 08 FLOOR PLAN PROPOSED
- BLOCK A LEVEL 12 FLOOR PLAN PROPOSED
- BLOCK A LEVELS 01-02 FLOOR PLANS PROPOSED
- BLOCK A LEVELS 03-06 FLOOR PLANS PROPOSED
- BLOCK A LEVEL 07 FLOOR PLAN PROPOSED
- BLOCK A LEVELS 09-11 FLOOR PLANS PROPOSED
- BLOCK A LEVELS 13-14 FLOOR PLANS PROPOSED
- BLOCK B LEVELS 01-06 FLOOR PLANS PROPOSED
- BLOCK B LEVELS 07-08 FLOOR PLANS PROPOSED
- BLOCK B LEVELS 09-10 FLOOR PLANS PROPOSED
- BLOCK B LEVEL 00 FLOOR PLAN PROPOSED
- BLOCK C LEVELS 01-02 FLOOR PLANS PROPOSED
- BLOCK C LEVELS 03-04 FLOOR PLANS PROPOSED
- BLOCK C LEVELS 05-07 FLOOR PLANS PROPOSED
- BLOCK C LEVEL 00 FLOOR PLAN PROPOSED
- BLOCK C LEVEL 08 FLOOR PLAN PROPOSED
- BLOCK C LEVEL 09 FLOOR PLAN PROPOSED
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- SITE WIDE NORTH ELEVATION PROPOSED
- SITE WIDE EAST ELEVATION PROPOSED
- SITE WIDE SOUTH ELEVATION PROPOSED
- SITE WIDE WEST ELEVATION PROPOSED
- GENERAL ARRANGEMENT LEVEL 00 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVELS 01-02 FLOOR PLANS PROPOSED
- GENERAL ARRANGEMENT LEVEL 07 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 08 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 09 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 10 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 11 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVEL 12 FLOOR PLAN PROPOSED
- GENERAL ARRANGEMENT LEVELS 13-14 FLOOR PLANS PROPOSED
- GENERAL ARRANGEMENT ROOF PLAN LEVEL 15 PROPOSED
- GENERAL ARRANGEMENT PLAN LEVELS 03-04 FLOOR PLANS PROPOSED
- GENERAL ARRANGEMENT LEVELS 05-06 FLOOR PLANS PROPOSED
- SITE WIDE SECTION CC PROPOSED
- SITE WIDE SECTION DD PROPOSED
- SITE WIDE SECTION BB PROPOSED
- SITE WIDE SECTION AA PROPOSED
- AIR QUALITY ASSESSMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- 20 MINUTE NEIGHBOURHOOD ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Old Oak and Park Royal Development Corporation for determination, against a statutory target of eight weeks. Over the last year Old Oak and Park Royal Development Corporation decided full applications in a median of 78 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Elthorne Works 4 Trumpers Way Hanwell W7 2QA
75% historically approved · decision due ~18 Mar
Construction of a mixed-use development comprising residential dwellings (Use Class C3) and flexible commercial and/or community floorspace (Use Classes E and/or F2), together with associated landscaping and vehicle parking. The proposal represents a departure from the Development Plan, as it is not in accordance with the policies in force for the area. The site is designated as a Locally Significant Industrial Site (LSIS), and the scheme constitutes Major Development. For Public Consultation Purposes Only (not forming part of the statutory Description of Development): The proposal includes 287 residential dwellings (Use Class C3) and 254 sqm of flexible commercial and/or community floorspace (Use Classes E and/or F), with buildings ranging from 10 to 15 storeys in height.
Awaiting decision Full applications 176 docs -
76 Humes Avenue Hanwell W7 2LP
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs -
76 Humes Avenue Hanwell W7 2LP
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs -
45 Townholm Crescent Hanwell W7 2LY
Single storey side/rear extension; associated internal and external alterations including alterations to fenestration
Granted Householder Extension Windows or glazing 13 docsSmall domestic -
45 Townholm Crescent Hanwell W7 2LY
Single storey side/rear extension; associated internal and external alterations including alterations to fenestration
Granted Householder Extension Windows or glazing 13 docsSmall domestic -
66 Humes Avenue Hanwell W7 2LP
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs
Other full applications
In Old Oak and Park Royal Development Corporation
-
260214FUL Granted
15 King Street Southall UB2 4DG
Change of use from Retail (Use Class E (a)) to Restaurant (Use class E(b)) and installation of flue duct at rear elevation
-
254648FUL Refused
15 Braund Avenue Greenford UB6 9JG
Conversion of existing residential dwelling to provide 1x3 bedroom and 1x4 bedroom self- contained flats; Single storey rear and first floor rear extension
-
262904FUL Granted
139 Lady Margaret Road Southall UB1 2PS
Conversion of existing dwellinghouse into 2 self-contained flats; ground floor rear infill extension
-
254485FUL Granted
66 And 66A Horn Lane Acton W3 6NT
Single storey rear extension to ground floor flat (No.66); rear roof extension with Juliet balcony to first floor flat (No.66A); insertion of three rooflights to front roofslope; alteration to rear fenestration of existing ground and first floor flats (Following demolition of existing ground floor rear extension)
-
262967FUL Granted
5A Vernon Rise Greenford UB6 0EQ
Alteration of roof from hip to gable end with installation of window to gable wall; rear roof extension; removal of side chimney and installation of two roof lights to front roofslope