Planning application

North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

Granted Old Oak and Park Royal Development Corporation 254809HS2NMC HIgh Speed 2

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

As published by the council, reference 254809HS2NMC

Application record

Reference
254809HS2NMC
Type
HIgh Speed 2
Status
Approved
Decision
Approved
Received
22 Dec 2025
Validated
22 Dec 2025
Decided
16 Feb 2026
Ward
Northolt Mandeville
Decision by
Delegated Decision
Postcode
UB5 4NA

Site history

Applications at this address on the Old Oak and Park Royal Development Corporation register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 230131HS2 Granted

    North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

    Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

    Decided 6 Mar 2023

Timeline

Dates from the published record

  1. 22 Dec 2025

    Received by Old Oak and Park Royal Development Corporation

  2. 16 Feb 2026

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Old Oak and Park Royal Development Corporation granted permission on 16 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Old Oak and Park Royal Development Corporation's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

    230131HS2 Submitted 5 Jan 2023 0m away

    Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

    Granted Extension 34 docs
  • North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

    254809HS2NMC Submitted 22 Dec 2025 0m away

    Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

    Granted Extension 13 docs
  • North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

    230131HS2 Submitted 5 Jan 2023 0m away

    Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

    Granted Extension 34 docs
  • 41 Belvue Road Northolt UB5 5HW

    261259HH Submitted 24 Mar 2026 98m away

    Single storey front extension; two storey side and rear extension (following demolition of existing shed); alteration to front porch

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • 41 Belvue Road Northolt UB5 5HW

    260510PALHE Submitted 10 Feb 2026 98m away

    Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)

    Granted Prior approval Extension 6 docs
    Small domestic
  • 41 Belvue Road Northolt UB5 5HW

    260510PALHE Submitted 10 Feb 2026 98m away

    Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)

    Granted Prior approval Extension 6 docs
    Small domestic